9. Exit driveway – a narrower driveway will be operationally unworkable
The driveways have been specifically designed to cater for large vehicles with trailers and 19 metres articulated
vehicles as these are the expected vehicles to frequently access the site for a trade supplies use. Swept paths
provided in the traffic impact assessment report are illustrated in Figures 7-8 below.
Figure 7 – AV Swept Path
Figure 8 – Large Vehicle and trailer Swept Path
The swept paths demonstrate that any narrowing of the exit driveway to accommodate a 0.5m landscape strip will
not permit a large vehicle with a trailer or an AV to successfully manoeuvre and exit the site onto Gateway Drive. It
is submitted that a realignment of the existing driveway off the boundary will compromise the ability for large
vehicles to exit onto Gateway Drive. The current width of the exit driveway as shown on Drawings DA02 and DA03
Issue E dated 23/08/23 and DA04 Issue D dated 22/08/23 needs to be maintained.
RPS AAP Consulting Pty Ltd. Registered in Australia No. 97 117 883 173
rpsgroup.com Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU22-0051_Change Representations_v1.4_041223.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.