Council archive · source document
Generally In Accordance Report 142007 743 04 · 142007.743.04
Further information was sort from the Geotechnical Engineer regarding the location of the proposed
pool and the existing Atlantis System installed along the rear boundary of the property. The
consulting reported that ‘the overall stability of the site will not be affected’, and that this would be
‘a construction stability issue rather than an overall stability issue, similar to if you were excavating
near a stormwater pipe’.
Condition 32 requires that an Engineer ensures the works have been undertaken in accordance
with approved design and that the infiltration system has capacity to cater for the runoff from the
site without adversely affecting adjoining properties or any Council services or structure.
It will be the certifying Engineers responsibility to ensure all works have been completed and that
the infiltration system is still meeting the requirements of condition 32.
The development is considered generally in accordance with the development permit.
Page 3 of 4
Document Set ID: 22805903
Version: 2, Version Date: 09/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Generally In Accordance Report 142007 743 04.pdfRelated documentApplication case desk ↗
About this file
- File size
- 593 KB (small file)
- File type
No other editions are linked here.