Skip to the record
Accept no imitations.

Original source · versioned page text

MCU15-0053_ICN.N1100(Rev1)_30&32 DoonellaStTewantin with Info Notice Res (2)

of 6
INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-
up) agreement with Unitywater in compliance with the Sustainable Planning Act 2009 and Statutory Regulatory Provision (adopted charges) applying
at the time of issuing the notice.
NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.2) 2014 (Effective 16 February 2015)
INFRASTRUCTURE CHARGE CALCULATION                                                                                                                                                                              Base Date:            01-July-2014
                                                                                                                                           Colum n 7
                      Colum n 1
               Use under The Noosa Plan
                                                                                                                                            COUNCIL                                   Council Charge Calculation
                                                                                                                                            CHARGE
                                                               Colum n 2                           Colum n 3
                                                                                                                                          Per Table 10.1                                  EXISTING                NET
                                                           Developm ent class                   Unit of m easure
                                                                                                                                  (Charges breakup) of Adopted       APPROVED                                                     CHARGE AMOUNT
                           Defined use                                                                                                                                                      (QTY)          CHARGEABLE
                                                                                                                                       Charge in Column 6                (QTY)                                                             $
                                                                                                                                     ($ per unit of measure)                               (Credit)              (QTY)

Detached house (& Residential Lot Reconfiguration)              Residential            3 or more bedroom dw elling unit (Lot)               $16,800                                            2                   -2                              -$33,600
Ancillary dw elling unit
&                                                                                            2 bedroom dw elling unit                       $12,000                        15                  4                   11                             $132,000
Multiple housing                                                Residential
• Type 2 Duplex                                                                              1 bedroom dw elling unit                        $7,800                         1                  1                   0                                     $0
• Type 4 Conventional
                                                                                                                                                                                    Sub-Total, Residential =                                    $98,400.00



                                                                                                                                CALCULATED INFRASTRUCTURE CHARGE (Current at Base Date 1 July 2014) =                                           $98,400.00

                                                                                                                                 Other                             Not Applicable                                                                    $0.00

                                                                                                REDUCTIONS                       Rebate                            Not Applicable                                                                    $0.00

                                                                                                                                 Trunk infrastructure Offset Not Applicable                                                                          $0.00

                                                                                                                 *NET INFRASTRUCTURE CHARGE PAYABLE (Current at Base Date 1 July 2014) =                                                       $98,400.00


ALLOCATION OF LEVIED CHARGE TO TRUNK INFRASTRUCTUE NETWORKS
The infrastructure charge payable will be allocated to Council “Trunk ” infrastructure network s in accordance with Council’s Resolution as follows:

                                                                                Column 4
                                                                                                                                                                                                                                  * Net Infrastructure
                                                          Allocation of Council infrastructure charge to trunk                                                                           Reductions
   Council “Trunk” Infrastructure Network                                                                                                Calculated                                                                                 Charge Payable
                                                                        infrastructure networks
                (Table 10.2)                                                                                                       Infrastructure Charge                                                                            (At Base Date:
                                                        Residential Development          Non-Residential Development                                                     Other              Rebate               Offset               1 July 2014)

Transport              (Charge Type: icA3trans)                    40%                                 85%                                            $39,360.00                 $0.00             $0.00                  $0.00                 $39,360.00

Public Parks & Land for Community Facilities
                                                                   50%                                 15%                                            $49,200.00                 $0.00             $0.00                  $0.00                 $49,200.00
                       (Charge Type: icA3parkCF )

Stormwater             (Charge Type: icA3storm )                   10%                                100%                                             $9,840.00                 $0.00             $0.00                  $0.00                  $9,840.00

         * Subject to Automatic Increase Provision until date of payment.                         *TOTALS =                                       $98,400.00                     $0.00             $0.00                  $0.00                 $98,400.00

ADDITIONAL NOTE:
This Infrastructure Charges Notice N1100 ( Revision No.1 ) replaces the original issued Charge Notice (Revision 0) b y correcting the calculated charge to include an additional existing 1 x 3 b edroom dwelling (unit 6) located on
Lot 903 T 1631 (32 Doonella St, Tewantin).


                                                                                            PO Box 141                                   P. (07) 5329 6500             [email protected]
                                                                                            TEWANTIN QLD 4565                            F. (07) 5329 6501             www.noosa.qld.gov.au                    ICN - Page 3

Log in to download the original (MCU15-0053_ICN.N1100(Rev1)_30&32 DoonellaStTewantin with Info Notice Res (2).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.