Capital / Ope Capital
Sum of Proposed Budget Adjustment Revenue / Expense
CAPEX Ren CAPEX PROGRAM Cost Centre / Project Description Comments Expense Revenue Grand Total
Renewal Stormwater Drainage Whole of Shire Stormwater Pit Structure Reduce shire wide allocation to leave sufficient (100,000) (100,000)
Renewal Program funds for CCTV inspection of stormwater network
Cootharaba Kinmond Creek Road Sandy Ck Culverts have rusted out and are currently 50,000 50,000
Amco Renewal - design propped to cater for the Dr Pages Rd construction
activities.
Cootharaba Kinmond Creek Road Eastern Culverts have rusted out and are currently 50,000 50,000
Branch Amco Renewal - design propped to cater for the Dr Pages Rd construction
activities.
Stormwater Drainage Total Weyba Road Reef Street Intersection There were a number of issues that have been 220,000 220,000
Transport and Infrastructure Management
Improvements - PIP identified since this project was first estimated. .
The scope of the project has increased
significantly since it was first considered. Details
in Project brief
Transport and Infrastructure Management Total 220,000 220,000
Renewal Total 195,000 190,000 385,000
Other Environmental Assets, Bushland, Tracks & Trai Environment Levy Land Acquisition - Cooroibah Council resolution to purchase environmental 2,850,810 2,850,810
land, including stamp duty and legal costs.
Environmental Assets, Bushland, Tracks & Trails Total 2,850,810 2,850,810
Public Transport Infrastructure Hastings St Landscape timber structure Urgent works funded from Hastings Street 41,874 41,874
renewal Maintenance Levy
Public Transport Infrastructure Total 41,874 41,874
Other Total 2,892,684 2,892,684
Upgrade Holiday Parks North Shore Beachfront Campground — Initial planning works towards overall master plan 50,000 50,000
Planning Consultancy
Holiday Parks Total 50,000 50,000
Pathways and Enabling Facilities Noosaville Eenie Creek Road Off-Ramp to Successful grant funds from Cycle network 130,000 130,000
Underpass Design & Construction program
Recognise additional capital grants revenue Cycle (65,000) (65,000)
Network Local Government Grants Program
Whole of Shire - Noosa Pedestrian and Cycle Successful grant funds from Cycle network 90,000 90,000
Data Counters program
Recognise additional capital grants revenue Cycle (45,000) (45,000)
Network Local Government Grants Program
Noosa Heads - Park Road Boardwalk Design Consolidate 2 separate projects into 1 (151,898) (151,898)
Noosa Heads - Park Road Boardwalk Design Consolidate 2 separate projects into 1 151,898 151,898
and Consultation
Pathways and Enabling Facilities Total 220,000 (110,000) 110,000
Planning Scheme Business Distribution & Land Needs Project Additional works required for this study to inform 11,425 11,425
the new Town Plan
Whole of Shire Planning Scheme Development Additional Allocation to allow LGIP review to be 68,575 68,575
Projects 2016 undertaken in accordance with statutory timelines
Standards Review - Standard Drawings An additional $25,000 in funds is required to 25,000 25,000
continue the review and updating of the Noosa
Council civil engineering standard drawings. The
original budget request of $25,000 was not
sufficient to cover the extent of work required as it
was not anticipated that a major review was
required.
Planning Scheme Total 105,000 105,000
Page 39 of 47See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.