Skip to the record
Accept no substitutions.

Council archive · source document

Appendix H - Dewatering Management Plan · MCU25/0053

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (14.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
APPENDIXD NOOSA PLAN 2020 ASSESSMENT

 

 
Full text of the other 47 pages

Page 2

APPENDIXH DEWATERING MANAGEMENT PLAN

 

Page 3

                                                                    ADG Consulting Pty Ltd          All Correspondence
                                                                    ACN: 630 555 225                PO Box 6405
                                                                    ABN: 98 630 555 225             Yatala DC QLD 4207


                                                                    P 07 3801 1564
                                                                    E [email protected]
                                                                    W adgconsulting.com.au




    Dewatering Management Plan
    Proposed Residential Development:
    Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.




    May 2025




    Prepared for:
    Seymour Group




Acid Sulfate Soil Assessment      On‐site Wastewater Management      Contaminated Land Assessment & Remediation
Dewatering Management          Environmental Management Plans     Surface & Groundwater Investigation & Monitoring

Page 4

                                                                                                 ADG Consulting Pty Ltd



                                                    Report details



     Project ref:                   ADG1777.25
     ADG Project Manager:            Michael Campbell

     Report title:                  Dewatering Management Plan
                                    Proposed Residential Development:
                                    Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland


     Version:                       Rev0
     Author:                        Lilli O’Sullivan
     Reviewer:                       Michael Campbell


     Client:                        Seymour Group
     Client contact:                Belinda Amble


     Distribution date:             1 May 2025

     Distributed to:                Seymour Leisure Trust
     Copies:                        1 PDF


     ADG Consulting Pty Ltd




     Lilli O’Sullivan                                       Michael Campbell BEnvSc, BSc[Hons],
     BEnvSc,                                                DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
     Environmental Scientist                                MEIANZ, MALGA, MASSI
                                                            Director & Principal Environmental Scientist

     Date: 1 May 2025


     This document and all its content is copyright. Apart from fair dealing for the purposes of study, research, criticism
     and/or review as permitted under the Copyright Act 1968, no part of the content may be reproduced, reused or
     redistributed without the prior written permission of ADG Consulting Pty Ltd.




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                   Page ii

Page 5

                                                                              ADG Consulting Pty Ltd



                                                       Table of Contents

1        INTRODUCTION                                                                           1
1.1      PROPOSED DEVELOPMENT                                                                   1
1.2      RELEVANT GUIDELINES                                                                    1
1.3      GENERAL ENVIRONMENTAL DUTY                                                             2
1.4      DMP OBJECTIVES                                                                         2
1.5      SCOPE OF WORK                                                                          2
2        SITE CHARACTERISTICS                                                                   3
2.1      PROPERTY DESCRIPTION                                                                   3
2.2      SURROUNDING ENVIRONMENT                                                                3
2.3      TOPOGRAPHY                                                                             3
2.4      GEOLOGY & SOILS                                                                        3
2.5      HYDROGEOLOGY                                                                           3
3        PREVIOUS INVESTIGATIONS                                                                4
3.1      PTG CONSULTING 2025                                                                    4
3.1.1    SOILS                                                                                  4
3.1.2    GROUNDWATER                                                                            4
3.2      GROUNDWATER QUALITY                                                                    5
4        WATER QUALITY OBJECTIVES                                                               6
4.1      RECEIVING ENVIRONMENT                                                                  6
4.2      DEVELOPMENT OF WATER QUALITY OBJECTIVES                                                6
4.3      PROPOSED WATER QUALITY OBJECTIVES                                                      7
5        DEWATERING METHODOLOGY                                                               10
5.1      BASEMENT EXCAVATION AND SHORING                                                      10
5.2      GROUNDWATER EXTRACTION                                                               10
5.3      EXTRACTION/DISCHARGE RATES AND VOLUME                                                10
5.3.1    DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE                   10
5.4      DEWATERING DURATION                                                                  11
5.5      GROUNDWATER DRAWDOWN                                                                 11
5.6      GROUNDWATER TREATMENT                                                                12
5.7      NOMINATED HOLD POINTS                                                                12
6        WATER QUALITY MANAGEMENT                                                             13
6.1      RESPONSIBILITY                                                                       13
6.2      OPERATIONAL POLICY                                                                   13
6.3      PERFORMANCE CRITERIA                                                                 13
6.4      IMPLEMENTATION STRATEGY                                                              13
6.4.1    GROUNDWATER TREATMENT SYSTEMS                                                        13
6.4.2    DEWATERING STRATEGY                                                                  14
6.4.3    INITIAL PUMP‐OUT                                                                     14
6.5      MONITORING                                                                           14
6.5.1    VISUAL MONITORING                                                                    14
6.5.2    WATER QUALITY MONITORING                                                             14
6.5.3    MONITORING RESPONSIBILITIES                                                          15
6.6      MAINTENANCE                                                                          16
6.7      REPORTING                                                                            16
6.8      CONTINGENCIES                                                                        17
7        NOISE & ODOUR MANAGEMENT                                                             18



    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                       Page iii

Page 6

                                                                ADG Consulting Pty Ltd



7.1      RESPONSIBILITY                                                         18
7.2      OPERATIONAL POLICY                                                     18
7.3      PERFORMANCE CRITERIA                                                   18
7.4      IMPLEMENTATION STRATEGY                                                18
7.4.1    NOISE                                                                  18
7.4.2    ODOUR                                                                  18
7.5      MONITORING                                                             18
7.6      REPORTING                                                              19
7.7      CONTINGENCIES                                                          19
8        LIMITATIONS                                                            20
9        REFERENCES                                                             21
APPENDIX A:          FIGURES
APPENDIX B:          LICENCED GROUNDWATER BORE SEARCH RESULTS
APPENDIX C:          DRAWINGS
APPENDIX D:          CONE OF DEPRESSION CALCULATIONS




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                         Page iv

Page 7

                                                                                           ADG Consulting Pty Ltd


1        Introduction
         ADG Consulting Pty Ltd (ADG) was engaged by Seymour Group to prepare a Dewatering Management
         Plan (DMP) for the proposed residential apartment development within property described as Lot 0 on
         BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
1.1      Proposed development
         It is understood the proposed development will comprise a two‐storey building over a single‐level in‐
         ground basement, extending across the 1,120 m2 site.

         Based on information provided by Seymour Group, existing ground levels across the proposed basement
         footprint are approximately RL 2.1 m Australian Height Datum (AHD). Excavations to facilitate the
         basement construction are proposed to extend to an approximate depth of 2.8 m below existing ground
         level (bgl), corresponding to an approximate elevation of RL ‐1.1 mAHD (i.e. finished basement floor level
         of RL ‐0.7 mAHD; allowing for 400 mm raft slab and blinding layer). Localised deeper excavations may be
         required to facilitate other structural elements (i.e. lift overrun pit, pile caps and footings), where
         required.

         During a geotechnical and acid sulfate soil investigation on the site in January 2025, no groundwater was
         recorded in the drilling of boreholes to the depth of 4.5 mgbl (PTG Consulting, 2025). PTG noted that
         groundwater levels are expected to fluctuate in response to variations in rainfall and are likely to rise
         close to the ground surface during periods of heavy or prolonged rainfall. No further recent data has been
         supplied for review in preparing this DMP, however based on ADG’s experience on nearby sites in the
         locality in recent years, it is anticipated that groundwater should be expected at or around 0.5 m AHD +/‐
         0.5 m, depending on tidal and seasonal rainfall conditions. Dewatering will therefore be necessary to
         allow the basement and other structural elements to be constructed in dry conditions.
1.2      Relevant guidelines
         The DMP was prepared with reference to the following documents:

              Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. Australian and
               New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia
               (ANZG, 2018), which supersedes Australian and New Zealand Guidelines for Fresh and Marine Water
               Quality, Australian and New Zealand Environment and Conservation Council and Agriculture and
               Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ). 2000.

              Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland Government.
               2019.

              Guidelines for Managing Risks in Recreational Water. Australian Government, National Health and
               Medical Research Council (NHMRC). 2008.

              Monitoring and Sampling Manual 2018, Version 2 June 2018. Department of Environment and
               Science (DES). 2018.

              Noosa River environmental values and water quality objectives. Department of Environment and
               Science (DES). 2022.

              National Environment Protection (Assessment of Site Contamination) Measure 1999, (as amended
               May 2013). National Environment Protection Council (NEPC). 2013.

              Queensland Water Quality Guidelines 2009, Version 3. The Department of Environment and
               Heritage Protection (DEHP). 2013.




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 1

Page 8

                                                                                            ADG Consulting Pty Ltd

1.3   General environmental duty
      The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
      Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
      environmental harm unless the person takes all reasonable and practicable measures to prevent or
      minimise the harm”.

      The Act requires that appropriate action be taken to report that environmental harm is occurring or has
      the potential to occur, unless the harm is authorised under an environmental protection policy, an
      environmental management program, a development approval, or an environmental protection order.
      This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.
1.4   DMP objectives
      The objectives of the DMP are to:

      1.    Describe the dewatering methodology, groundwater treatment, monitoring and reporting
            procedures to be employed at the site during dewatering activities.

      2.    Provide effective management procedures to prevent environmental harm resulting from the
            discharge of extracted groundwater from the site.
1.5   Scope of work
      To achieve the investigation objectives, the following scope of work was undertaken:

           A desktop study including:

            1. Review of the development proposal and proposed shoring/dewatering designs.
            2. Review of geology and soil maps for the area.
            3. Search of groundwater bores licensed by the Queensland Government within a 200 m radius of
               the site.
            4. Review of relevant existing reports and groundwater data from the local area.
            5. Review of current aerial photographs of the site and surrounds.

           The preparation of this Dewatering Management Plan suitable for submission to Noosa Shire
            Council (NSC), if required.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                           Page 2

Page 9

                                                                                                    ADG Consulting Pty Ltd


2        Site characteristics
2.1      Property description
         The site comprises a single parcel of land described as Lot 0 on BUP10936, situated at 7 Noosa Parade,
         Noosa Heads, Queensland. The site is rectangular in shape with an area of 1,120m2 and is shown in Figure
         1, Appendix A.
2.2      Surrounding environment
         The surrounding environment and land use is described briefly in Table 1.

         Table 1 Surrounding land use and environment

                 Direction                                                Environment

                   North            Noosa Parade, then residential properties, then Noosa River

                                    Noosa Park, then Noosa River, then Noosa Parade, then high‐density properties
                    East
                                    (hotels).

                   South            Noosa River, then residential properties, then Witta Circuit.


                   West             Residential property, then Witta Circle, then residential/holiday properties.

2.3      Topography
         The site is considered to be relatively level based on its existing use as a residential property.
2.4      Geology & soils
         The surface geology at the site is mapped as being Anthropocene aged man‐made deposits (‘Qhh‐QLD’)
         comprising gravel, sand and silt; man‐made deposits generally associated with land‐fill or mining (tailings,
         dumps and rehabilitated areas. The dominant rock type is identified as stratified volcanic and
         metamorphic as referenced through detailed surface geology (accessed via Queensland Globe online, 17
         April 2025).

         The site is mapped within the Atlas of Australian Soils (‘Ca10’, accessed via Queensland Globe online, 17
         April 2025) as Podzols soils described as well‐drained, bleached A2 horizon and brown or reddish brown
         B horizon. These soils are generally described as undulating to rolling roughly parallel old dune system.

         The Acid Sulfate Soils (ASS) 1:100,000 Tweed Heads to Teewah Overlay map categorises the site as ‘SDL’
         or ‘Acid Sulfate on Disturbed Land’, indicating that the site is likely to contain acid sulfate soils (and
         potential exists that partial or full treatment may have been undertaken), however the type and depth
         to ASS is not defined (accessed via Queensland Globe online, 17 April 2025).
2.5      Hydrogeology
         A search of groundwater bores licensed by the Queensland Government was conducted on 17 April 2025
         via the Queensland Globe online database. The search identified no (0) licensed bores within a 200 m
         radius of the site and is shown in Appendix B.

         Based on the local geology and topography, and the site’s proximity to the Noosa River, the inferred
         groundwater flow is to the south toward the Noosa River. Groundwater beneath the site is expected to
         be hydraulically connected to the Noosa River, therefore saline groundwater conditions are anticipated,
         and additional saltwater intrusion is likely to occur during dewatering. Any changes to the salinity levels
         in the groundwater are anticipated to rapidly return to existing conditions following the completion of
         dewatering and subsequent rainfall/alluvial percolation.




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                             Page 3

Page 10

                                                                                              ADG Consulting Pty Ltd


3        Previous investigations
         This DMP is based on site specific information sourced from the following documentation provided to
         ADG by Seymour Group:

              PTG Consulting. February 2025. Geotechnical Investigation Report – Proposed Residential
               Development 7 Noosa Parade, Noosa Heads. PTG/01608 – 001 – Rev 0.
              PTG Consulting. April 2025. Acid Sulfate Soil Investigation Management Plan – Proposed Residential
               Development 7 Noosa Parade, Noosa Heads. PTG/01608 – 002 – Rev 0.
              SCG Consulting. May 2025. Operational Works for Residential Development Lot CP on BUP 10936
               No. 7 Noosa Pde, Noosa Heads. Rev issued 1 May 2025. (see Appendix C).
              Bureau Proberts. April 2025. Drawing. Proposed Residence 7 Noosa Parade. 24048 – AR 00.01 –
               Rev 4.

         A brief discussion of relevant soil and groundwater conditions is provided below.
3.1      PTG Consulting 2025
         A Geotechnical and Acid Sulfate Soil (ASS) Investigation was undertaken on the site by PTG Consulting in
         January 2025 (report dated February 2025). The following sections summarise the relevant information
         from the report provided.
3.1.1 Soils
         During the Geotechnical and ASS investigation four (4) boreholes (BH1 to BH4) were drilled to depths of
         4.5 m below ground level (bgl) using solid flight auger with a specialised 4WD truck‐mounted drill rig. The
         sub‐surface soil profile comprised a silty sand/ sand to the termination depth of 4.5 mbgl. The sands
         were described as generally medium dense to dense, with some loose material encountered near the
         surface.

         A total of seventy‐two (72) soil samples were recovered from boreholes (BH1 to BH4) at 0.25 m intervals
         from between 0.0 m and 4.5 m in depth. Based on field screening results, a total of eighteen (18) samples
         were selected for laboratory analysis by the Chromium Reducible Sulfur suite (CRS). The analysed samples
         reported the presence of low to high levels of potential acid sulfate soils (PASS) throughout the soil profile
         with titratable actual acidity (TAA) concentrations ranging from <10 to 128 moles H+/tonne (9 of 18
         samples reporting above the action criteria of 18 moles H+/tonne). Nine (9) samples reported oxidisable
         sulfur concentrations ranging from 0.066 to 0.194 %S which were at or above the relevant action criterion
         of 0.03 %S, indicating the presence of potential acid sulfate soils (PASS) within the soil profile to
         approximately 4.5 m (extent of investigation by PTG Consulting).

         PTG Consulting estimated, approximately 800 tonnes of soil will be disturbed below RL 5 m AHD. With
         the highest recorded net acidity value of 128 mol H+/t, a ‘Very High Level of Treatment’ is required. The
         results indicate soils contain high levels of existing and potential acidity and will therefore require
         management of actual acid sulfate soils. A maximum liming rate of 10 kg CaCO3/m3 was calculated for
         the site.

         It is noted that the ASS investigation did not provide assessment of deeper soils (>4.5 mbgl) or cone of
         depression that will be created during dewatering. Given ADG’s previous experience with ASS and
         dewatering operations in the local area, ASS conditions are likely to become more significant with
         increasing depth and rewetting of the soil structure in the cone of depression following commencement
         of dewatering.
3.1.2 Groundwater
         During the geotechnical and acid sulfate soil investigation, no groundwater was reported as being
         encountered during the drilling of the boreholes (PTG Consulting, 2025). PTG Consulting notes, that
         groundwater levels can be perched and fluctuate seasonally and during heavy rainfall events. Due to the
         site sites close proximity to the tidal Noosa River and the permeable natural of the soils encountered,
         increases the likelihood of groundwater fluctuations. In addition, ADGs recent previous experience in the
         locality has generally identified standing groundwater at or around RL 0.5 to 1.0 mAHD, and given the

    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                          Page 4

Page 11

                                                                                       ADG Consulting Pty Ltd

      sandy subsurface profile and proximity to the tidal canal network associated with Noosa Inlet these
      relative groundwater levels should be expected, with higher levels during or following periods of intense
      or extended rainfall.
3.2   Groundwater quality
      No site specific groundwater investigation was undertaken as part of the Geotechnical and ASS
      Investigations undertaken by PTG Consulting. However, ADG is of the opinion that localised monitoring
      well data can often be misleading and does not always accurately represent the properties of the
      groundwater that will be extracted and treated from the entire site and local surrounds during
      dewatering. Therefore, based on numerous groundwater investigations and dewatering monitoring
      projects that have been undertaken by ADG throughout the Noosa Coast and nearby sites in recent years.
      Our understanding of the groundwater quality in the region is provided below:
          Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
           6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
           48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
           oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.

           Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
            saturation.

           The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
            staining and organic content.

           Concentrations of dissolved metals are typically below the available marine water trigger values
            (MWTV’s) in ANZG (2018) which supersedes ANZECC/ARMCANZ (2000) for the receiving waters,
            however elevated levels of aluminium and particularly iron are expected in the untreated
            groundwater and have the potential to increase following oxidisation of PASS as dewatering
            progresses or as a result of existing acidic groundwater conditions.

           Given the location and previous use of the site, groundwater impacts resulting from site
            contamination are not anticipated.

      A groundwater investigation will be undertaken at the commencement of dewatering as described in
      Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
      and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
      Based on previous experience with dewatering in the area, ADG expects the groundwater to require
      treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
      and dissolved metal concentrations prior to being discharged to the stormwater system.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                     Page 5

Page 12

                                                                                          ADG Consulting Pty Ltd


4        Water quality objectives
4.1      Receiving environment
         It is proposed to discharge extracted groundwater directly over the revetment wall into the adjacent
         canal network (Noosa River) immediately south of the site (to be confirmed upon commissioning to site).
         The waterway in this location is mapped as a tidal canal, harbour or marina (DES, 2022). The receiving
         environment is connected to the Noosa River which ultimately connects to the Pacific Ocean. The
         following section establishes water quality objectives (WQOs) to ensure that the environmental values
         of the receiving waters are protected and maintained.
4.2      Development of water quality objectives
         WQOs have been developed to support and protect the designated environmental values (EVs) for the
         receiving environment. The WQOs are based on a moderately disturbed level of protection for estuarine
         (marine) waters in tidal canals, constructed estuaries, marinas and boat harbours. The WQOs have been
         developed with reference to the following guideline documents:

              Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 (ANZG, 2018).
               Australian and New Zealand Governments and Australian state and territory governments, Canberra
               ACT, Australia, which supersedes Australian and New Zealand Guidelines for Fresh and Marine
               Water Quality, Australian and New Zealand Environment and Conservation Council and Agriculture
               and Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ). 2000.

              Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland Government.
               2019.

              Guidelines for Managing Risks in Recreational Water. Australian Government, National Health and
               Medical Research Council (NHMRC). 2008.

              Noosa River environmental values and water quality objectives. Department of Environment and
               Science (DES). 2022.

              Queensland Water Quality Guidelines, Version 3, September 2009. 2013. DEHP.

         The Australian and New Zealand Guidelines for Fresh and Marine Water Quality by the Australian and
         New Zealand Environment and Conservation Council and Agriculture and Resource Management Council
         of Australia and New Zealand (ANZECC/ARMCANZ, 2000), has undergone review, with the publication of
         the 2018 version. The revised Australian and New Zealand Guidelines for Fresh and Marine Water Quality
         2018 is a joint initiative between the Australian and New Zealand Governments and Australian state and
         territory governments (ANZG, 2018) and supersedes the ANZECC/ARMCANZ 2000 publication. Where
         ANZECC/ARMCANZ (2000) is referenced, the relevant sections are still relevant and consistent with the
         updated ANZG 2018 publication, as referenced in the ANZG 2018 publication.

         The Queensland Water Quality Guidelines 2009 (DEHP, 2013) was made pursuant to the provisions of the
         Environmental Protection (Water) Policy 1999 (the EPP(Water)), which is a subordinate legislation under
         the Environmental Protection Act 1994 and was developed as the State response to the
         ANZECC/ARMCANZ (2000) Guidelines. This has been further superseded by EPP (Water and Wetland
         Biodiversity) 2019 which provides a framework for:
             Identifying environmental values for Queensland waters, and deciding the water quality objectives
              to protect or enhance those environmental values; and

             Including the identified environmental values and water quality objectives under Schedule 1 of the
              EPP (Water).
         WQOs are long term goals for surface water quality management. They are indicators established for
         receiving waters to support and protect the designated Environmental Values (EVs) for those waters. DES
         (2022) describes that for slightly to moderately disturbed waters, the guideline values should be
         compared with the median of values at a test site, whilst ANZG (2018) stresses that the aquatic ecosystem

    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                     Page 6

Page 13

                                                                                                            ADG Consulting Pty Ltd

      guideline values are triggers to further action, are inherently conservative, and that the response to non‐
      compliance should match the magnitude and impacts (if any) of the exceedance.

      Section 5 (Guidelines for recreational water quality and aesthetics) of the previous ANZECC/ARMCANZ
      (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
      Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ
      (2000)/ANZG (2018) Guidelines is by association and extension a reference to the current 2008 NHMRC
      Guidelines. The 2008 NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic
      criterion for iron – noting this is an aesthetic criterion derived from the Australian Drinking Water
      Guidelines on the basis of ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ
      (2000) Section 5.2.3.3, notes that as a general guideline, under Toxic Chemicals, ‘Higher concentrations
      of toxicants may be tolerated occasionally if it assumed that no person will ingest more than a maximum
      of 100 mL water during a normal swimming session (NHMRC 1990) compared with 2L/d for potable
      water’, and Section 3.1.1.3, under Risk based approach of the guidelines, ‘The guideline trigger values are
      based on bioavailable concentrations, and hence are relatively conservative when compared with total
      concentrations in the field, so the use of the decision frameworks will increase guideline concentrations
      in most cases’. Therefore, any chemical toxicant trigger values would require reassessment and likely
      increase upwards of any ANZECC/ARMCANZ (2000)/ANZG (2018) Guideline trigger values due to the
      slightly to moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

      Regardless of the WQOs adopted in this DMP, the General Environmental Duty set out in the EP Act is
      paramount, which requires that “a person must not carry out an activity that causes or is likely to cause
      environmental harm unless the person takes all reasonable and practicable measures to prevent or
      minimise the harm”.
4.3   Proposed water quality objectives
      The proposed water quality objectives that have been developed for the discharge of extracted
      groundwater from the site are provided in the Tables below. All water discharged from the site must
      comply with the discharge criteria provided in Table 2. Additionally, the receiving water quality within a
      20m radius of the discharge point (the receiving waters mixing zone) shall comply with the receiving
      water criteria provided in Table 3. Receiving waters data will be assessed against background monitoring
      data if non‐compliant results are obtained at the receiving waters monitoring location.

      Table 2 Discharge criteria

                                 Parameter                                                            Criteria

       Physico‐chemical

       pH (pH units)                                                                                6.5 – 8.51,2

       Dissolved oxygen (% saturation)                                                                 >802

       Suspended solids (mg/L)                                                                         <501,2

       Turbidity (NTU)                                                                                 <502

       Litter/visible plumes                                                  None visible at the point of discharge or in a waterway

       Total metals (µg/L)

       Aluminium                                                                                       2003

       Iron                                                                                            3003

      Table notes:

      1. QWQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow – construction
         phase of development in Queensland.
      2. Typical discharge criteria recognised throughout QLD.
      3. SCC (2008). Water release criteria as specified in the SCC Manual for Erosion and Sediment Control, Chapter 6.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                              Page 7

Page 14

                                                                                                                  ADG Consulting Pty Ltd

     Table 3 Receiving waters criteria

                                  Parameter                                                              Criteria

      Physico‐chemical

      pH (pH units)                                                                                     7.8 – 8.31

      Dissolved oxygen (% saturation)                                                                   85 – 1051

      Suspended solids (mg/L)                                                                              ≤141

      Turbidity (NTU)                                                                                      ≤61

      Dissolved metals (µg/L)

      Aluminium                                                                           No relevant ANZG criterion available

      Arsenic                                                                            No relevant ANZG criterion available*

      Cadmium                                                                                              5.52

      Chromium                                                                                             4.42

      Copper                                                                                               1.32

      Iron                                                                                No relevant ANZG criterion available

      Lead                                                                                                 4.42

      Nickel                                                                                               702

      Zinc                                                                                                  82

      Mercury                                                                                              0.42

      Total metals (µg/L)

      Aluminium                                                                                   No ANZG criteria / 2003

      Iron                                                                                        No ANZG criteria / 3003

     Table notes:

     1. DES (2022). Noosa River environmental values and water quality objectives (moderately disturbed – Noosa River – canals and marinas).
     2. ANZG (2018) – Marine water trigger values for 95% species protection (Supersedes ANZECC/ARMCANZ (2000)).
     3. Criteria subject to expected condition in Development Application (DA) notice by Noosa Shire Council.

     Although ADG has not been provided a copy of any DA notice or conditions for the proposed development
     (not yet available at the time of writing), based on previous dewatering projects in the Noosa Coast
     Region it is expected that total iron and aluminium concentrations as listed in Error! Reference source
     not found. (above) are likely to be conditioned by Noosa Shire Council for compliance. It should be noted
     that these concentrations are considered to be onerous with respect to the risk‐based (worst‐case)
     bioavailable trigger value criteria contained in ANZG 2018 & ANZECC/ARMCANZ (2000) for marine water
     (moderately disturbed) 95% species protection, and are likely to be difficult to achieve given the
     groundwater conditions encountered in the locality on previous dewatering projects on the Noosa Coast.

     Prior to discharge to the stormwater system or any waterway, discharges are to be tested to meet the
     requirements of the ANZG 2018 & ANZECC/ARMCANZ (2000) Guidelines for Fresh and Marine Water
     Quality. There is currently no chemical toxicant trigger value criteria available for total or dissolved (i.e.
     bioavailable) concentrations of aluminium or iron for marine or estuarine waters under the Australian
     and New Zealand Guidelines for Fresh and Marine Water Quality Guidelines (ANZG 2018 &
     ANZECC/ARMCANZ 2000 – i.e. ANZECC Guidelines) or the Guidelines for Managing Risks in Recreational
     Waters (NHMRC 2008), with regards to managing environmental impacts to the waterway.

     In addition, Section 5 (Guidelines for recreational water quality and aesthetics) of the ANZECC/ARMCANZ
     (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
     Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ (2000)
     Guidelines is by association and extension a reference to the current 2008 NHMRC Guidelines. The 2008
     NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic criterion for iron –
     noting this is an aesthetic criterion derived from the Australian Drinking Water Guidelines on the basis of

ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                                   Page 8

Page 15

                                                                                     ADG Consulting Pty Ltd

     ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ (2000) Section 5.2.3.3, notes
     that as a general guideline, under Toxic Chemicals, ‘Higher concentrations of toxicants may be tolerated
     occasionally if it assumed that no person will ingest more than a maximum of 100 mL water during a
     normal swimming session (NHMRC 1990) compared with 2L/d for potable water’, and Section 3.1.1.3,
     under Risk based approach of the guidelines, ‘The guideline trigger values are based on bioavailable
     concentrations, and hence are relatively conservative when compared with total concentrations in the
     field, so the use of the decision frameworks will increase guideline concentrations in most cases’.
     Therefore, any chemical toxicant trigger values would require reassessment and likely increase upwards
     of any ANZG 2018 &/or ANZECC/ARMCANZ (2000) Guideline trigger values due to the slightly to
     moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

     In conditioning more onerous criteria, rather than the available marine chemical toxicant trigger value
     criteria contained within the ANZG/ANZECC Guidelines, an unachievable constraint may be placed on the
     development. This DMP has allowed for contingency measures to be incorporated into the treatment
     and discharge system if required, including silt curtains to be installed within the receiving waterway
     surrounding the discharge location, or further onsite treatment measures such as filtration, to prevent
     and/or minimise as far as reasonably practicable the potential for release of suspended solid loads into
     the broader receiving waterway.




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                    Page 9

Page 16

                                                                                             ADG Consulting Pty Ltd


5        Dewatering methodology
5.1      Basement excavation and shoring
         Based on preliminary information provided by Seymour Group, existing ground levels within the
         proposed basement footprint are approximately RL 2.4 m Australian Height Datum (AHD). Excavations to
         facilitate the basement construction are proposed to extend to an approximate depth of 3.5 m below
         existing ground level (bgl), corresponding to an approximate elevation of ‐1.1 mAHD. Localised deeper
         excavations may also be required for other structural elements (i.e. lift pit and footings) across the site.
         It is understood the excavation/basement perimeter will generally be stabilised using a contiguous secant
         pile wall, except in proximity of the proposed pool on the northern side (facing the vacant parkland to
         the north of the site) and as such will limit the potential for ground movement and instability of
         surrounding lands, services and structures (refer to Appendix C).

         Groundwater seepage was not encountered at the time of drilling to a depth of 4.5 mbgl during the
         Geotechnical Investigations on the site in 205 (PTG Consulting, 2025). However, ADG notes that, typically,
         the groundwater levels in the area are encountered at levels of approximately RL 0.5 m to RL 1.0 m.
         Fluctuations of +/‐ 0.5 m are typically noted in the area. Groundwater levels are also likely to be subject
         to fluctuations associated with the seasonal and climatic conditions, as well as tidal variations and
         significant rainfall events.

         It is expected that the development will include a ‘tanked’ basement to prevent the requirement for a
         permanent dewatering facility at the site.
5.2      Groundwater extraction
         Dewatering is anticipated to be undertaken using a series of 40 mm diameter PVC spears installed at
         1.5 m intervals around the internal and external perimeter of the excavation. Alternatively, well point
         dewatering may be appropriate within the internal face of the shoring wall. The final dewatering method
         is subject to engagement of a shoring and dewatering contractor, as different contractors may specialise
         in different methods of achieving the required dewatering drawdown. Preference should be given to
         dewatering primarily on the internal face of the shoring wall, with preference for minimal dewatering
         external to the shoring system to assist in minimising the extent of the cone of depression in the water
         table (unless expressly required to limit hydrostatic force on the shoring system) and thereby limit
         potential ground movement that may affect surrounding structures and services.

         The basement excavation must be dewatered to a minimum of approximately 1.0 m below the deepest
         point of excavation to allow construction to be undertaken in dry conditions. The water table (approx.
         0.5 mAHD) is therefore expected to be lowered by at least 2.6 m in the locality of the basement
         excavation footprint to a maximum of approximately ‐2.1 mAHD throughout the basement footprint.
         Deeper localised dewatering may be required for the installation of a lift overrun pit and/or other
         structural elements.

         It is proposed that the development will include a ‘tanked’ basement to prevent the requirement for a
         permanent dewatering facility at the site. Similarly, no permanent groundwater dewatering is proposed
         or likely to occur as a result of the development, with all services and pipework proposed to be situated
         above standing groundwater elevations (that is, at elevations above 0.5 mAHD) and subject to the
         nominated hold points at Section 5.7. Where any deviation is proposed from this arrangement, all
         pipework within the saturated zone, that outlets direct to waterways must be fitted with buried
         headstocks at suitable intervals to prevent ongoing dewatering of groundwater along pipework bedding.
5.3      Extraction/discharge rates and volume
5.3.1 Dewatering extraction calculation based on subsurface soil profile
         The dewatering extraction rate, area of influence and cone of depression has been estimated using the
         Western Australian Department of Water and Environmental Regulation Cone of Depression Calculator.




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 10

Page 17

                                                                                           ADG Consulting Pty Ltd

      The calculation results are based on the following parameters and known site‐specific conditions:
          Approximate length of excavation = 36 m
          Approximate width of excavation = 17 m
          Reduction in depth of groundwater across the excavation = 2.6 m (based on an approximate
           groundwater depth of 0.5 m AHD)
          Approximate depth of saturated thickness of unconfined aquifer = 10 m (conservative standardised
           approximation)

      A conservative soil profile of fine to medium grained sands, has a hydraulic conductivity of approximately
      8.2 m/day, or equivalent 0.0000949 m/sec (WA Calculator). The results of the calculation are shown in
      Table 4 below, and provided in Appendix D.

      Table 4 Dewatering extraction rate results

                                   Output                                           Result

          Effective radius of pumping well (m)                                        14
          Dewatering radius of influence (m)                                          76
          Discharge rate (L/sec)                                                       8
          Discharge rate (L/hr)                                                     28,600
          Establishment of cone of depression (hours)                                102


      Based on the above inputs, a groundwater flow rate of approximately 480 L/min or 28,600 L/hr has been
      predicted for the development. Flow rates are predicted to be highest during initial drawdown of the
      groundwater table within the basement excavation footprint and reducing to approximately 5 – 6 L/sec
      following establishment of the cone of depression within the excavation. Flow rates may fluctuate due
      to tidal variations, generally approximately ± 0.5 m, and will also be influenced by rainfall and surface
      water collection within the basement excavation footprint noting the underlying predominantly sand
      profile encountered during geotechnical investigations.

      Regardless of the contractor employed, groundwater treatment systems should be installed with
      capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against higher than anticipated
      flow rates exceeding the estimated 7 L/sec as a result of varying ground conditions across the extent of
      excavation.

      However, it should be noted that the WA Calculator provides a conservative assessment of inflows to an
      excavation footprint based on area and depth but does not take account of the shoring wall, which will
      inhibit lateral inflows to some extent. Also note that the cone of depression radius measure includes
      water table depressions of 1 mm depth or more, so any significant depression of the water table is limited
      to much closer to the dewatering spears or wells (generally within 3 to 10 m from the shoring wall in fine‐
      medium grained sands, depending on density of the strata).
5.4   Dewatering duration
      Dewatering will be necessary throughout the basement construction phase, which is expected to require
      continual dewatering for approximately eight to twelve weeks. To minimise the potential impacts during
      construction of short‐term dewatering, periods of active dewatering will be minimised as much as
      possible. However, ADG notes that once active dewatering has commenced, dewatering will not be able
      to be ceased until both: a) the basement hydrostatic uplift forces have been compensated to the
      satisfaction of the consulting RPEQ engineer; and b) potential hydraulic loading on the external face of
      the shoring system has been compensated to the satisfaction of the consulting RPEQ engineer and
      shoring contractor.
5.5   Groundwater drawdown
      Groundwater drawdown caused by dewatering has the potential to create settlement in unconsolidated
      sediments and loose sands. It is noted that dilapidation reports for surrounding structures and services

 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 11

Page 18

                                                                                       ADG Consulting Pty Ltd

      are proposed to be undertaken which were not supplied to ADG for the purposes of preparing this DMP
      and are to be provided to Council separately from this DMP.

      Groundwater drawdown may also oxidise potential acid sulfate soils within the cone of depression,
      subsequently producing acidic groundwater conditions and mobilising heavy metals. Monitoring of the
      extracted untreated groundwater will be undertaken to detect in‐situ oxidation of soils, as required and
      at the frequencies stated in Section Error! Reference source not found.. Groundwater monitoring bores
      for groundwater level gauging external to the excavation footprint are expected to be unable to be
      established and monitored prior to and during construction on the site, due to limited space (SCG
      Consulting Engineers).

      Civil Engineering plans of the proposed development and basement arrangement are provided at
      Appendix C.
5.6   Groundwater treatment
      All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
      stormwater network. The following treatment measures (or similar depending on final dewatering
      contractor selection) will be adopted, and will be installed and operational prior to the commencement
      of dewatering:

      1.    A groundwater pH buffering treatment system (primary treatment)
      2.    A sedimentation tank to provide additional residence time and sedimentation (secondary
            treatment)
      3.    A fine media filtration system designed for effective removal of heavy metals (tertiary treatment),
                                                                                                  tertiar




            if required.

      Details of the treatment systems and methodologies are provided in Section 6 of this report.

      Note: Consideration should be taken regarding placement of treatment gear on site to enable easy
      cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
      requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
      minimisation).
5.7   Nominated Hold Points
      In accordance with anticipated DA Conditions, nominated hold points to be enacted during construction
      have been proposed to facilitate for certification by the suitably qualified person experienced with Acid
      Sulfate Soils, as well as Council Development Engineer to ensure all possible avenues for continual
      dewatering below permanent groundwater level, including around pipework bedding that outlet to
      waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project
      are:
      1. Prior to commencement of dewatering/initial pump out
      2. At finished excavation level, prior to blinding layer application
      3. External to basement service installation trench opening/s prior to backfilling.

      The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
      council representatives and the Site Manager.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 12

Page 19

                                                                                             ADG Consulting Pty Ltd


6        Water quality management
6.1      Responsibility
         The Site Manager is ultimately responsible for implementing the water quality management procedures
         described in this DMP.
6.2      Operational policy
         To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to
         discharge from the site.
6.3      Performance criteria
         The performance criteria for the discharge of extracted groundwater are the water quality objectives
         provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within
         a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the
         environmental values of the receiving waterway are maintained. Receiving waters data will also be
         assessed against background monitoring data if non‐compliant results are obtained at the receiving
         waters monitoring location.
6.4      Implementation strategy
         All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
         stormwater network/canal. The treatment system described in Section 6.4.1 (below) will be adopted,
         installed and operational prior to the commencement of dewatering.
6.4.1 Groundwater treatment systems
         Subject to final appointment of shoring and dewatering contractors (who all generally have different
         treatment systems), the following treatment systems are generally proposed for dewatered groundwater
         treatment prior to discharge. Regardless of the contractor employed, groundwater treatment systems
         should be installed with capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against
         higher than anticipated flow rates exceeding the estimated 7 L/sec as a result of varying ground conditions
         across the extent of excavation or construction during wet weather.
         Primary treatment
         Groundwater treatment system/s will be installed to provide primary treatment of the extracted
         groundwater. The system/s will provide the following capabilities:

         1.    A pH treatment tank with 5 kL minimum capacity.
         2.    Automated in‐line chemical dosing systems for the addition of buffering solutions and coagulants.
         3.    A filtration system to reduce fine particulates and heavy metals (in particular iron and aluminium in
               both dissolved and total forms).
         4.    Emergency response alarms for non‐routine situations.

         Based on the estimated extraction rate, this system will provide approximately ten minutes contact time
         during the initial chemical dosing, prior to secondary treatment using a sedimentation tank. Primary
         treatment tank will be vertically stacked on the secondary treatment tank wherever practicable to
         minimise site area required for groundwater treatment equipment.
         Secondary treatment
         A 23 kL sedimentation tank will be utilised to provide the necessary residence time for secondary
         treatment of the groundwater prior to discharge to the stormwater system. Based on the estimated
         groundwater extraction rate of approximately 28,600 L/hr (equivalent 480 L/min) from Section 5.3.1 of
         this report, one sedimentation tank will provide approximately forty‐seven minutes retention time
         following primary treatment of the extracted groundwater. This is considered to be sufficient secondary
         settling / retention time based on extensive prior experience on other sites in similar ground conditions.




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 13

Page 20

                                                                                          ADG Consulting Pty Ltd

      Tertiary treatment (if required) – may be required following initial testing of extracted groundwater
      A specialised fine media filtration system designed for the effective removal of both total and dissolved
      forms of heavy metals, with particular specific retention of iron and aluminium, will be utilised to remove
      heavy metals from the secondary treated groundwater prior to discharge to the stormwater system. The
      system will be capable of backflushing on manual or automated basis with retained concentrated heavy
      metal suspended solids diverted to a backflush tank for further settling/thickening prior to offsite removal
      by licenced liquid waste contractor for lawful disposal at a licenced disposal facility. This type of fine
      media filtration treatment system is a forced‐flow system under pressure, and generally capable of
      treating flow rates of up to 20 L/sec per filtration unit (therefore residence time is inconsequential to
      treatment quality achieved).

      Tertiary treatment will only be required if the required water quality is unable to be achieved following
      primary and secondary stages of treatment. Subject to the results of field and laboratory testing during
      the pre‐discharge monitoring event.
6.4.2 Dewatering strategy
      The Site Manager, Dewatering Contractor and ADG Consulting will, if practicable, formulate a dewatering
      strategy to ensure that the dewatering treatment system is sufficient to meet the requirements of the
      project and that the necessary equipment can be accommodated within the site prior to the
      commencement of dewatering.

      Where the construction of the proposed development requires occupation of the road reserve (verge
      area and/or road formation) for either short term or long term, a road reserve permit must be obtained
      from Council prior to any occupation of the road reserve.
6.4.3 Initial pump‐out
      Prior to, or as soon as practicable following the initial, discharge of any extracted groundwater to the
      canal system, the following pre‐dewatering procedure will be undertaken:

      1.    The basement area will be excavated down to the standing groundwater level.
      2.    The initial dewatering discharge will be directed (via the treatment systems) into the excavation and
            allowed to infiltrate/recharge the aquifer. This process will provide initial clarification of the
            extracted groundwater as disturbed sediment loads are typically reduced following the initial pump‐
            out.
      3.    Samples of the treated groundwater will be recovered and analysed for the parameters detailed in
            Table 2 and Table 3. Note: ADG must be provided reasonable notice in order for this step to be
            undertaken.
      4.    The extracted groundwater will be directed, or recommended to continue discharge, into the
            stormwater system following confirmation that the water quality complies with the discharge
            criteria. Or other recommendations will be provided, as required.
6.5   Monitoring
6.5.1 Visual monitoring
      Visual inspections of the site and dewatering equipment shall be undertaken daily by the Site Manager
      to identify the following:
           Quantity of chemical product within the dosing system.
           Effective operation of all dewatering treatment equipment.
           Short circuiting of water around baffles and filter media in sediment tanks, where required to be
            installed.
           Visible hydrocarbon sheens and odours.
           Green blue or extremely clear water indicating high levels of dissolved aluminium.
6.5.2 Water quality monitoring
      Water quality monitoring will be undertaken for the duration of dewatering activities at the site by a
      suitably qualified, experienced and independent person. The monitoring will include analysis of the

 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 14

Page 21

                                                                                        ADG Consulting Pty Ltd

      extracted groundwater, treated discharge water and off‐site monitoring in the receiving waters (in the
      mixing zone within a 20 m radius of the discharge point). The exact location within the receiving waterway
      (Noosa River) is to be confirmed. Background water quality monitoring of field parameters will also be
      conducted during each sampling event, if applicable. Background samples will be recovered from the
      Noosa River, either upstream or downstream from the receiving water location (tide dependant)
      approximately 300 m upstream of the discharge point).

      The proposed monitoring locations are shown in Figure 1, Appendix A and are subject to confirmation
      following mobilisation of dewatering equipment to site.

      Monitoring will be undertaken at the following frequencies:
         Daily monitoring of field parameters (pH, and turbidity) in the treated discharge water. Daily
          monitoring will be undertaken by a suitably trained site employee under the supervision of the Site
          Manager.

           Weekly monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature
            and turbidity) in the treated discharge water, receiving waters and background waters by ADG
            Consulting.

           Weekly laboratory analysis of treated discharge water and receiving waters for suspended solids,
            dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium, copper, iron, lead,
            nickel, zinc and mercury) and total metals (aluminium & iron) by ADG Consulting.

           Pre‐discharge/initial monitoring of field parameters (pH, electrical conductivity, dissolved oxygen
            and oxidation‐reduction potential) in the extracted groundwater (prior to treatment) to assess
            changes in groundwater chemistry associated with PASS oxidation (sampled by ADG Consulting).

           Pre‐discharge/initial laboratory analysis of extracted groundwater (prior to treatment) for
            suspended solids, dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium,
            copper, iron, lead, nickel, zinc and mercury), total metals (aluminium and iron) and for soluble
            sulfate and chloride to assess changes in groundwater chemistry associated with potential acid
            sulfate soil (PASS) oxidation (sampled by Environmental Consultant).

           Laboratory analysis of untreated groundwater would also be performed periodically (monthly) if
            changes in untreated groundwater pH levels are detected that may indicate local acidification, and
            to determine any changes in local groundwaters that may require further investigation of potential
            environmental impacts.

      All samples will be recovered by a suitably qualified Environmental Scientist and submitted to a National
      Association of Testing Authorities (NATA) accredited laboratory for analysis.
6.5.3 Monitoring responsibilities
      The persons responsible for undertaking the compliance monitoring described in Section 6.5.2 above are
      shown in Table 5.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                     Page 15

Page 22

                                                                                                  ADG Consulting Pty Ltd

      Table 5 Monitoring responsibilities

                                  Activity                            Frequency          Responsibility      Person


          Monitoring of field parameters in discharge water               Daily          Site Manager     Site Manager


          Monitoring of field parameters in discharge water,                             Environmental    Environmental
                                                                        Weekly             Consultant
          receiving waters and background waters                                                            Consultant

          Laboratory analysis of samples recovered from discharge                        Environmental    Environmental
                                                                        Weekly             Consultant
          water and receiving waters                                                                        Consultant

          Monitoring of field parameters in extracted groundwater   Initially, then as   Environmental    Environmental
          (pre‐treated)                                                  required          Consultant       Consultant

          Laboratory analysis of samples recovered from extracted   Initially, then as   Environmental    Environmental
          groundwater (pre‐treated)                                      required          Consultant       Consultant

6.6   Maintenance
      The groundwater treatment systems must be regularly maintained. Maintenance must include:
          Regular cleaning and or replacement of the filter media within the filtration unit, where required to
           be installed.

             Regular removal of sediment from the sedimentation tank and backflush tank. The sediment must
              be either returned to the excavation pit for dewatering and bulking out with excavated material, or
              removed from the site by a licensed liquid waste contractor.

             Regular/required back flushing of fine media filtration treatment system.

             Regular check of the dosing system and top‐up of buffering solutions, oxidants and flocculants.
6.7   Reporting
      Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
      to ensure that the treatment procedures are effective, and that the receiving waters are not being
      impacted by the discharge.

      The following reporting procedures will be adopted:
          A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
           report will be submitted to the Site Manager, Dewatering Contractor and NSC (upon request).

             Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
              compliance monitoring. The interim reports will display all data obtained during the previous
              monitoring event, and provide comments and recommendations based on the results.

             A dewatering compliance report will be prepared on completion of the project (upon request).

      The above reports will be prepared by the Environmental Consultant and provided to the Site Manager
      and Dewatering Contractor as they become available. The reports will include all water quality results
      and comparison to the WQOs, corrective actions and recommendations made to the Site Manager and
      Dewatering Contractor during the monitoring period.

      The Site Manager must keep records of complaints, volumes of chemicals used and treatment methods
      employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
      upon request.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                              Page 16

Page 23

                                                                                          ADG Consulting Pty Ltd

6.8   Contingencies
      If water quality monitoring indicates ongoing exceedances of the performance criteria, and the water
      quality objectives for the receiving waters cannot be met, then corrective actions will be adopted as
      necessary. Possible contingencies may include one or more of the following:

           Installation of additional sedimentation tanks to provide increased residence time and assist with
            the retention of precipitated iron hydroxides.

           Installation of additional flocculant and/or coagulant dosing systems to assist in precipitation of
            suspended sediments and/or heavy metals.

           Installation of activated carbon filtration or other additional fine media filtration to retain
            suspended sediments and/or other specific target contaminants.

           Install a floating sediment curtain/s around the stormwater termination point in the receiving
            waterway to prevent unsightly plumes and contain sediment and/or heavy metals for periodic
            removal (subject to approval by Council).

           Preventive and corrective actions shall be taken in the event that groundwater monitoring
            observations indicate that unexpected groundwater contamination has been encountered during
            dewatering. The most appropriate action(s) shall be dependent on the stage of construction and
            risk of adverse impacts to groundwater users and the receiving environment.

           Any modification to the dewatering system and pumping rates shall be in consultation with a
            suitably qualified scientist/geotechnical/engineer.

           Following heavy rainfall all ponded surfaces waters to meet discharge criteria (Table 3) prior to
            offsite discharge. Where discharge criteria not met, Site Manager to obtain approval from
            Dewatering Contractor regarding treating surface waters with treatment gear before offsite
            discharge.

           Pumping systems and shoring works to be maintained in fit for purpose state by Dewatering
            Contractor. In the event that dewatering equipment has failed and is likely to cause a significant
            impact on the environment, or surrounding properties (E.g. flooding) the Dewatering Contractor is
            to be contacted immediately. The Principal Contractor, in consultation with the Dewatering
            Contractor shall be responsible in rectifying the failure in a practicable time frame to minimise
            potential impacts.

           Equipment, spare parts, materials and tools necessary to manage aspects of the system/s which
            present a high risk of significant impacts in the event of failure (if any) shall be readily available.

           Construction vibrations could potentially cause settlement in the loose upper‐level sands, thereby
            damaging nearby structures founded in these strata. Prior to commencement of construction on
            site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
            to establish the condition of all existing adjacent structures, roads and services.

           Accumulated sediments and heavy metals within the treatment system can be emptied to available
            area onsite and bulked out during earthworks or alternatively removed from site by a licenced waste
            removal contractor (sucker truck).

           Acid sulfate soils on site are to be managed in accordance with a site based ASSMP.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 17

Page 24

                                                                                             ADG Consulting Pty Ltd


7        Noise & odour management
7.1      Responsibility
         The Site Manager is responsible for ensuring the appropriate management of noise and odour during
         dewatering operations.
7.2      Operational policy
         To minimise noise and odour emissions generated from the site during dewatering.
7.3      Performance criteria
         The appropriate criteria to measure the performance of dewatering management at the site are provided
         below.

         1.    No noise or odour related complaints received from neighbouring residents or the community.
         2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
7.4      Implementation strategy
         Noise and odour emissions will be managed as described in the following sections.
7.4.1 Noise
         All dewatering equipment must be operated appropriately and maintained in good working order. All
         dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
         with the performance criteria. Non‐complying dewatering plant will be replaced or repaired as necessary.

         It is proposed to employ noise mitigation strategies including use of electric pumps and dewatering
         systems rather than diesel powered equipment. Noise attenuation blankets and screens may be installed
         around noise generating dewatering pumps and equipment where practicable, if required. Noise
         monitoring equipment (unattended) will be installed by the site manager prior to commencement and
         monitored for the duration of dewatering, if required.
7.4.2 Odour
         All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
         all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
         control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
         residents.
7.5      Monitoring
         An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
         identify the following:
             Excessive noise being generated by the dewatering systems and plant.
             Strong or offensive odours being generated by the dewatering equipment and/or extracted
              groundwater.

         If required by Council, noise monitoring equipment (unattended, continuous logging) may need to be
         installed by the Site Manager prior to commencement and monitored for the duration of dewatering.
         The Environmental Protection (Noise) Policy 2019 (EPP(Noise)) identifies specific acoustic quality
         objectives (noise criteria) to assist in preventing significant impacts on noise sensitive receptors and as a
         guide to long‐term acoustic quality for sensitive receptors. The primary EPP(Noise) criteria relevant to
         this investigation is outside a dwelling (i.e. adjacent dwellings), which should not have noise at levels in
         the daytime or evenings greater than 50dB(A) LAeq, adj,1hr. This means that noise levels in the receiving
         environment outside of nearby dwellings (i.e. on balconies) should not exceed an equivalent sound
         energy as would be received from a one hour continuous sound of 50 decibels on the A‐weighted scale
         (adjusted for tonal character perceptible by the human ear).

         While this report has not been generated for the purpose of assessing compliance with the requirements
         of workplace health and safety legislation, it is noted that a person conducting a business or undertaking

    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 18

Page 25

                                                                                      ADG Consulting Pty Ltd

      must ensure that workers are not exposed to noise that exceeds the exposure standard for noise. The
      exposure standard for noise is defined in the Work Health & Safety Regulation 2011 (QLD) as LAeq,8h of
      85 dB(A) or an LC,peak of 140 dB(C). As such, it is considered appropriate to adopt these exposure
      standards to assess average and peak noise generated at the site with the potential to affect exposure
      levels of nearby sensitive receptors (noting there will be some attenuation between source and receptors
      and actual noise experienced by receptors would need to be measured at the receptor location).
7.6   Reporting
      The Site Manager must keep records of complaints, monitoring records (including continuous noise
      monitoring data, where required to be monitored), and corrective and preventive actions/methods
      employed for noise abatement. These records must be available on‐site at all times and submitted to NSC
      by the Site Manager upon request.
7.7   Contingencies
      If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
      constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
      necessary to mask odour emissions if complaints are received from neighbouring residents. This may
      include the direct injection of deodorisers to the groundwater treatment system.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                   Page 19

Page 26

                                                                                            ADG Consulting Pty Ltd


8        Limitations
         ADG Consulting Pty Ltd (ADG) has prepared this report for Seymour Group in accordance with the agreed
         scope of work. The services performed by ADG have been conducted in a manner consistent with the
         normal level of care and expertise exercised by members of the environmental consulting profession. No
         other warranty or guarantee, expressed or implied, is made as to the professional advice included in this
         report.

         This report is solely for the use of Seymour Group and ADG accepts no responsibility for the use of any
         part of this report for any other purpose or by third parties, as it may not contain sufficient information
         for the purposes of other parties or users. This report must only be presented in full, and may not be used
         for any other objective, except where prior written approval is obtained from ADG. This report does not
         comment on legal obligations, as legal advice can only be given by qualified legal practitioners.

         The information contained in this report is provided to minimise potential impacts on the receiving
         environment, however implementation of the described management procedures does not guarantee
         that the objectives will be achieved.

         The information contained in this report is considered to be accurate at the date of issue. Subsurface
         conditions, including contaminant concentrations can change in space and time, either through natural
         processes or by the accidental or intentional addition of contaminants to a site. Where conditions
         encountered subsequently at the site are significantly different from those reported herein, ADG must
         be notified and be provided the opportunity to review the conclusions and recommendations of this
         report.




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 20

Page 27

                                                                                       ADG Consulting Pty Ltd


9        References
         ANZECC/ARMCANZ. 2000. Australian and New Zealand Guidelines for Fresh and Marine Water Quality.
         Australian and New Zealand Environment and Conservation Council and Agriculture and Resource
         Management Council of Australia and New Zealand.

         ANZG. 2018. Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. Australian
         and New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia.

         Bureau Proberts. April 2025. Drawing. Proposed Residence 7 Noosa Parade. 24048 – AR 00.01 – Rev 3.
         Bureau Proberts. 2025.

         DEHP. 2013. Queensland Water Quality Guidelines 2009, Version 3. Department of Environment and
         Heritage Protection. Brisbane, Queensland, Australia.

         DES. 2022. Noosa River environmental values and water quality objectives. Department of Environment
         and Science. Brisbane, Queensland, Australia.

         DES. 2018. Monitoring and Sampling Manual 2018, Version 2 July 2018. Department of Environment and
         Heritage Protection. Brisbane, Queensland, Australia.

         Government of Western Australia. 2025. Cone of Depression calculator. Department of Water and
         Environmental Regulation. Accessed 29 April 2024, <https://www.wa.gov.au/service/environment/cone‐
         of‐depression‐calculator>.

         NHMRC. 2008. Guidelines for Managing Risks in Recreational Water. Australian Government, National
         Health and Medical Research Council.

         PTG Consulting. February 2025. Geotechnical Soils Investigation Report, Proposed Residential
         Development, 7 Noosa Parade, Noosa Heads. PTG/01608 – 001 – Rev 0. PTG Consulting. 2025.

         PTG Consulting. April 2025. Acid Sulfate Soil Investigation Management Plan, Proposed Residential
         Development, 7 Noosa Parade, Noosa Heads. PTG/01608 – 002 – Rev 0. PTG Consulting. 2025.

         QLD Government. 2019. Environmental Protection (Water & Wetland Biodiversity) Policy. Queensland
         State Government.

         SCG Consulting. May 2025. Operational Works for Residential Development Lot CP on BUP 10936 No. 7
         Noosa Pde, Noosa Heads. Rev issued 1 May 2025. (see Appendix C).




    ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                Page 21

Page 28

                                                                                       ADG Consulting Pty Ltd




     Appendix A:           Figures
                           Figure 1. Site location and proposed monitoring locations




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25

Page 29

Figure 1 - Site Location and Proposed Monitoring Locations (to be confirmed)                                                               A product of

Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
26°23'7"S 153°4'60"E                                                            26°23'7"S 153°5'33"E




                                                                                                            Legend located on next page




                                                                                                                                           0              50 metres
                                                                                                                                               Scale: 1:3074

                                                                                                                                              Printed at: A3
                                                                                                                                         Print date: 29/4/2025
                                                                                                                               Not suitable for accurate measurement.
                                                                                                                            Projection: Web Mercator EPSG 102100 (3857)
                                                                                                        For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                                 us.html
                                                                                                       Includes material © State of Queensland 2025. You are responsible for ensuring that
                                                                                                       the map is suitable for your purposes. The State of Queensland makes no
                                                                                                       representation or warranties in relation to the map contents and disclaims all liability.
                                                                                                       If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                                       from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                                       PBC, 2023




                                                                                                        Department of Natural Resources and Mines, Manufacturing, and Regional
26°23'30"S 153°4'60"E                                                          26°23'30"S 153°5'33"E                            and Rural Development

Page 30

Figure 1 - Site Location and Proposed Monitoring Locations (to be confirmed)
Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
   Legend                                                                          Attribution



                                                                               Includes material © State of Queensland (Department of Resources); ©
    Places: My Places(1)              Tunnels                                  Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                                               reserved, 2025.
            My Place 1
                                                                               © State of Queensland (Department of Resources) 2023
            Site Discharge
                                                                               © State of Queensland (Department of Natural Resources and Mines,
            Receiving Water
                                                                               Manufacturing and Regional and Rural Development) 2025
            Background Water (tide
                                                                               © State of Queensland (Department of Resources) 2024
            dependent)
            Background Water (tide                                             © State of Queensland (Department of Natural Resources and Mines,
                                                                               Manufacturing and Regional and Rural Development) 2024
            dependent)

    Railway stations


    Railways


    Roads and tracks
            Motorway

            Highway

            Secondary

            Connector

            Local

            Restricted Access Road

            Mall

            Busway

            Bikeway
            Restricted Access
            Bikeway
            Walkway
            Restricted Access
            Walkway
            Non-vehicular Track

            Track

            Restricted Access Track

            Ferry

            Proposed Thoroughfare

    Green bridges


    Bridges

Page 31

                                                                      ADG Consulting Pty Ltd




     Appendix B:           Licenced groundwater bore search results




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25

Page 32

Licensed DRDMW Bore Search (200 m radius)                                                                                             A product of

Lot 0 on BUP10936, situated at 7 Noosa Parade, Noosa Heads, Queensland.
26°23'1"S 153°4'51"E                                                       26°23'1"S 153°5'36"E




                                                                                                       Legend located on next page




                                                                                                                                  0                      100 metres
                                                                                                                                         Scale: 1:4211

                                                                                                                                        Printed at: A3
                                                                                                                                    Print date: 17/4/2025
                                                                                                                          Not suitable for accurate measurement.
                                                                                                                       Projection: Web Mercator EPSG 102100 (3857)
                                                                                                   For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                            us.html
                                                                                                  Includes material © State of Queensland 2025. You are responsible for ensuring that
                                                                                                  the map is suitable for your purposes. The State of Queensland makes no
                                                                                                  representation or warranties in relation to the map contents and disclaims all liability.
                                                                                                  If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                                  from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                                  PBC, 2023




                                                                                                   Department of Natural Resources and Mines, Manufacturing, and Regional
26°23'33"S 153°4'51"E                                                     26°23'33"S 153°5'36"E                            and Rural Development

Page 33

Legend                                                                Attribution



                                                                  Includes material © State of Queensland (Department of Resources); ©
 Registered water bores             Roads and tracks              Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                                  reserved, 2025.
 [RDMW and private]                     Motorway
         Artesian bore                                            © State of Queensland (Department of Natural Resources and Mines,
                                        Highway                   Manufacturing and Regional and Rural Development) 2024
         Artesian bore
                                        Secondary
         (abandoned but useable)                                  © State of Queensland (Department of Natural Resources and Mines,
                                        Connector                 Manufacturing and Regional and Rural Development) 2025
         Artesian bore
         (abandoned and                 Local                     © State of Queensland (Department of Resources) 2024
         destroyed)
                                        Restricted Access Road    © State of Queensland (Regional Development, Manufacturing and Water) 2022
         Artesian bore, ceased to
         flow                           Mall

         Artesian bore, ceased to       Busway
         flow (abandoned but
                                        Bikeway
         useable
                                        Restricted Access
         Artesian bore, ceased to
                                        Bikeway
         flow (abandoned and
         destroyed)                     Walkway

         Sub-artesian facility          Restricted Access
                                        Walkway
         Sub-artesian facility
         (abandoned but useable)        Non-vehicular Track

         Sub-artesian facility          Track
         (abandoned and
                                        Restricted Access Track
         destroyed)
                                        Ferry
         Surface water facility
                                        Proposed Thoroughfare
         Surface water facility
         (abandoned but useable)
                                    Railways
         Surface water facility
         (abandoned and
         destroyed)

 Places: My Places(1)
         My Place 1

         My Place 2

 Green bridges


 Bridges


 Tunnels


 Railway stations

Page 34

                                                      ADG Consulting Pty Ltd




     Appendix C:           Drawings




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25

Page 35

THE SITE




                             Issue:




                             SCG HOLDINGS PTY LTD T/A
                                                                  Unit 1/11 Project Ave,
                                                                  Noosa Heads
                                                                  Ph (07) 5455 5604
                                                                  email:[email protected]
                                                                  web:www.scg-engineers.com
                                                                  ABN 68 669 675 790




                                       Title:




                                    Project




                                    Date:               Drawn                Design

                                      Checked:          Drg No.                        Rev.




           Rev. - 10.06.16

Page 36

                  Issue:




                                           Unit 1/11 Project Ave,
                                           Noosa Heads
                                           Ph (07) 5455 5604




                  DEBUILD T/A
                                           email:[email protected]
                                           web:www.scg-engineers.com
                                           ABN 40 098 481 899




                      Title:




                     Project




                     Date:       Drawn                Design

                      Checked:   Drg No.                        Rev.




Rev. - 10.06.16

Page 37

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 38

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 39

                                                             Cut/Fill Summary
                                                             Name     Cut Factor Fill Factor2d Area   Cut            Fill                                                  Net
                                                             VOLUME 1.000       1.000      867.32sq.m 2111.08 Cu. M. 43.22 Cu. M. 2067.85 Cu. M.<Cut>
                                                             Totals                        867.32sq.m 2111.08 Cu. M. 43.22 Cu. M. 2067.85 Cu. M.<Cut>




                                                                                                                                                                             1.73
                                                                                                                                                                                1.




                                                                                                                                                Issue:




                                                                                                                                                SCG HOLDINGS PTY LTD T/A
SITE PREPARATION, EARTHWORKS & COMPACTION                                                                                                                                                      Unit 1/11 Project Ave,
                                      DILAPIDATION REPORT:                                                                                                                                     Noosa Heads
                                                                                                                                                                                               Ph (07) 5455 5604
                                                                                                                                                                                               email:[email protected]
                                                                                                                                                                                               web:www.scg-engineers.com
                                                                                                                                                                                               ABN 68 669 675 790




                                                                                                                                                          Title:




                                                                                                                                                       Project




                                                                                                                                                       Date:                         Drawn                Design

                                                                                                                                                         Checked:                    Drg No.                        Rev.




                                                                                                                              Rev. - 10.06.16

Page 40

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 41

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 42

 RESIDENTIAL
DEVELOPMENT




                                 Issue:




                                 SCG HOLDINGS PTY LTD T/A
                                                                      Unit 1/11 Project Ave,
                                                                      Noosa Heads
                                                                      Ph (07) 5455 5604
                                                                      email:[email protected]
                                                                      web:www.scg-engineers.com
                                                                      ABN 68 669 675 790




                                           Title:




                                        Project




                                        Date:               Drawn                Design

                                          Checked:          Drg No.                        Rev.




               Rev. - 10.06.16

Page 43

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 44

 RESIDENTIAL    RESIDENTIAL
DEVELOPMENT    DEVELOPMENT




 RESIDENTIAL
DEVELOPMENT




                                                Issue:




                                                SCG HOLDINGS PTY LTD T/A
                                                                                     Unit 1/11 Project Ave,
                                                                                     Noosa Heads
                                                                                     Ph (07) 5455 5604
                                                                                     email:[email protected]
                                                                                     web:www.scg-engineers.com
                                                                                     ABN 68 669 675 790




                                                          Title:




                                                       Project




                                                       Date:               Drawn                Design

                                                         Checked:          Drg No.                        Rev.




                              Rev. - 10.06.16

Page 45

                          RESIDENTIAL
                         DEVELOPMENT




                                                          Issue:




                                                          SCG HOLDINGS PTY LTD T/A
                                                                                               Unit 1/11 Project Ave,
                                                                                               Noosa Heads
                                                                                               Ph (07) 5455 5604
                                                                                               email:[email protected]
PLUMBING ARTICULATION:                                                                         web:www.scg-engineers.com
                                                                                               ABN 68 669 675 790




                                                                    Title:




                                                                 Project




                                                                 Date:               Drawn                Design

                                                                   Checked:          Drg No.                        Rev.




                                        Rev. - 10.06.16

Page 46

                                           Issue:




                                           SCG HOLDINGS PTY LTD T/A
                                                                                Unit 1/11 Project Ave,
                                                                                Noosa Heads
                                                                                Ph (07) 5455 5604
                                                                                email:[email protected]
                                                                                web:www.scg-engineers.com
                                                                                ABN 68 669 675 790




                                                     Title:




PLUMBING ARTICULATION:
                                                  Project




                                                  Date:               Drawn                Design

                                                    Checked:          Drg No.                        Rev.




                         Rev. - 10.06.16

Page 47

                                                             ADG Consulting Pty Ltd




     Appendix D:           Cone of Depression Calculations




ADG1777.25 Dewatering Management Plan_Rev0_01.05.25

Page 48

Calculator

Input

Length of excavation: |36 |

Width of excavation: l17 |

Drawdown required: |2.6 |

Aquifer thickness"): | 10 |

Hydraulic conductivity: |0.0000949 |

Results

Effective pumping radius, Re : 14
Cone of depression radius, Rg : 76
Total pumping rate: 8

Pumping time required: 102

metres

metres

metres

metres

metres/second

metres
metres
litres/second

hours

Used in these records

About this file

File size
14.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H - Dewatering Management Plan.pdf · 14.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.