Skip to the record
Accept no imitations.

Council archive · source document

Appendix H - Dewatering Management Plan · MCU25/0053

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (14.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                      ADG Consulting Pty Ltd

      must ensure that workers are not exposed to noise that exceeds the exposure standard for noise. The
      exposure standard for noise is defined in the Work Health & Safety Regulation 2011 (QLD) as LAeq,8h of
      85 dB(A) or an LC,peak of 140 dB(C). As such, it is considered appropriate to adopt these exposure
      standards to assess average and peak noise generated at the site with the potential to affect exposure
      levels of nearby sensitive receptors (noting there will be some attenuation between source and receptors
      and actual noise experienced by receptors would need to be measured at the receptor location).
7.6   Reporting
      The Site Manager must keep records of complaints, monitoring records (including continuous noise
      monitoring data, where required to be monitored), and corrective and preventive actions/methods
      employed for noise abatement. These records must be available on‐site at all times and submitted to NSC
      by the Site Manager upon request.
7.7   Contingencies
      If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
      constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
      necessary to mask odour emissions if complaints are received from neighbouring residents. This may
      include the direct injection of deodorisers to the groundwater treatment system.




 ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                   Page 19

Used in these records

About this file

File size
14.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H - Dewatering Management Plan.pdf · 14.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.