Council archive · source document
Appendix H - Dewatering Management Plan · MCU25/0053
Plans and drawings: the text below has words only, no drawings.
Very large file (14.2 MB): may take a few minutes to open.
ADG Consulting Pty Ltd
7.1 RESPONSIBILITY 18
7.2 OPERATIONAL POLICY 18
7.3 PERFORMANCE CRITERIA 18
7.4 IMPLEMENTATION STRATEGY 18
7.4.1 NOISE 18
7.4.2 ODOUR 18
7.5 MONITORING 18
7.6 REPORTING 19
7.7 CONTINGENCIES 19
8 LIMITATIONS 20
9 REFERENCES 21
APPENDIX A: FIGURES
APPENDIX B: LICENCED GROUNDWATER BORE SEARCH RESULTS
APPENDIX C: DRAWINGS
APPENDIX D: CONE OF DEPRESSION CALCULATIONS
ADG1777.25 Dewatering Management Plan_Rev0_01.05.25 Page iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix H - Dewatering Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.