Original source · versioned page text
Attachment 5 - Engineering OPW Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn LEGEND
AMENITIES
5 6 7 8 9 10
SCALE 1:400 (A3)
4
17 18 19 20 21
3
16 15 14 13 12 11
2
(A) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
FIGURE 1 - PLACEMENT OF CHECK DAM SEDIMENT TRAPS
1 CHECK DAM SEDIMENT TRAP
‘ ’
FIGURE 1 - GEOFABRIC LINED BUND
GEOFABRIC LINED BUND
Consulting Civil & PROPOSED INDUSTRIAL 192297 C150
Structural Engineers EROSION AND SEDIMENT COMPLEX 11 LEO ALLEY ROAD, C
Project Management CONTROL PLAN DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.