Original source · versioned page text
Attachment 5 - Engineering OPW Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn AMENITIES
DJ DJ
5 6 7 8 9 10
ET2
SJ
SJ SJ
DJ DJ DJ DJ DJ DJ
ET2 ET2 ET2 ET2
4
SJ
SJ
SJ
SJ
SJ
SJ
SJ
SJ
CJ
REINFORCED CONCRETE PAVEMENT
CJ
CJ
SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ
SCALE 1:20 (A3)
CJ
SJ
SJ
SJ
CJ
DJ
SJ
SJ
SJ
SJ
CJ
ET2 ET2
SJ
SJ SJ
CJ CJ
ET1
ET1
17 18 19 20 21
SJ
SJ
ET2
CJ CJ
SJ
DJ DJ DJ DJ DJ
SJ
SJ
ET2 ET2
SJ
SJ
SJ
SJ
CJ
SJ
SJ
CJ
CJ
SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ
DJ
SJ SJ
3
DOWEL JOINT TO EXISTING SLAB - DJ
SJ
SJ
SJ
SJ
SJ
CJ
CJ
CJ
SJ
SJ
ET2 ET2 ET2 ET2
SJ
DJ DJ DJ DJ DJ DJ
SJ SJ
16 15 14 13 12 11
SJ
DJ
CJ
SJ
SJ SJ
LEGEND
SJ
DJ
SJ SJ CONSTRUCTION JOINT - CJ
CJ
2
SJ
SJ
SJ SJ
DJ
150
SJ
ET2 ET2
CJ
SJ
SJ SJ
1 SAWN JOINT - SJ
DJ
SJ
SJ SJ
SJ
DJ SJ SJ
ET1
SJ
SJ
EDGE THICKENING DETAIL 1 (ET1)
SCALE 1:20 (A3)
GD
SCALE 1:400 (A3) SCALE 1:20 (A3)
GRATED DRAIN - GD
EDGE THICKENING DETAIL 2 (ET2)
SCALE 1:20 (A3)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C200
Structural Engineers EXTERNAL PAVEMENT PLAN COMPLEX 11 LEO ALLEY ROAD, C
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.