The consequent affluxes downstream of the site are summarised in Table 3, below. The affluxes are zero,
apart from +/- 0.01 on the 20 year and 2 year flood levels at the upstream side of Church Street.
Table 3: Impacts On Flood Levels Downstream Of Site, For Existing Climate Regime
ARI U/S Side Church St, N62 Midway Church/Rectory, N65 U/S Side Rectory St, N67
(yrs) Exg Dev Afflux Exg Dev Afflux Exg Dev Afflux
100 91.16 91.16 0.00 89.88 89.88 0.00 89.82 89.82 0.00
50 91.12 91.12 0.00 89.82 89.82 0.00 89.77 89.77 0.00
20 91.05 91.06 0.01 89.75 89.75 0.00 89.71 89.71 0.00
10 90.95 90.95 0.00 89.67 89.67 0.00 89.64 89.64 0.00
5 90.75 90.75 0.00 89.64 89.64 0.00 89.62 89.62 0.00
2 90.40 90.39 -0.01 89.58 89.58 0.00 89.56 89.56 0.00
1 90.06 90.06 0.00 89.37 89.37 0.00 89.35 89.35 0.00
3.3 100 Year Flood Levels With And Without Climate Change
The 100 year flood levels on the existing and developed site, with and without climate change (15%
increase in rainfall intensities), are summarised in Table 4, below:
Table 4: 100 Year Flood Levels With And Without Climate Change
Node Existing Developed
Without Climate Change With Climate Change
N44 91.28 91.28 91.35
N45 91.24 91.24 91.31
N46 91.19 91.20 91.26
N47 91.17 91.17 91.22
N48 91.17 91.18 91.23
N49 91.16 91.18 91.23
N50 91.16 91.17 91.22
N51 91.16 91.17 91.22
N52 91.16 91.16 91.21
N53 91.16 91.16 91.21
N54 91.16 91.16 91.21
N58 92.65 92.65 92.69
N59 91.83 91.83 91.84
N60 91.31 91.38 91.54
N61 91.16 91.16 91.21
N62 91.16 91.16 91.21
3.4 100 Year Flood Boundaries
The 100 year flood boundaries on the existing and developed site are marked on Figure 5 on page 13 of
this report. Since the balance lot (Lot 4) is regarded as a temporary entity which will almost certainly be
subdivided further in the next few years, and may have a different driveway configuration, with any
required adjustments to flood modelling completed at that time, the 100 year flood boundary marked in
the area upstream of the driveway on Lot 4 in this report is therefore appropriate to a short-term scenario
– i.e. without climate change. All other areas of the marked 100 year flood boundaries are applicable to a
longer-term scenario – i.e. with climate change.
Page 11
Brisbane Stormwater Management Pty Ltd Document File: ChurchSt.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.