SUPERSEDED Decision Notice - Council Meeting Decision MCU21 0110.pdf
i. the fencing must be durable and not capable of being pushed or blown over
ii. the fencing type must not detract from local amenity (barbed wire is not
acceptable)
iii. vandalism must be promptly repaired and any graffiti removed.
Retention of Existing Trees
72. Existing trees on the development site and in the road reserve must be retained in
accordance with an Arborist Report (or part thereof) prepared by a qualified person* and
endorsed through an Operational Works approval. The Arborist Report must include:
a. Tree removal/retention plan that includes all native trees and identifies in particular
all native trees to be removed with a diameter greater than 100mm measured at
1.2m from ground surface level.
b. Vegetation identified as not approved for removal within ‘Attachment E - Tree
Removal Plan’ within the approved Terrestrial Ecological Assessment report, and
as amended by the letter, attached plans and tree survey prepared by Gondwana
Ecology dated 9 February 2023, must be protected.
c. Incorporate vegetation to be retained as a result of the removal of Pavilion 5 as
per the minor change to application submitted 27 February 2025.
73. The trees identified for retention in the conditions of this approval must be maintained in
good health for the life of the tree.
*(Refer to Advisory Note)
Vegetation Removal
74. Any removal of vegetation must be in accordance with the conditions of this approval.
Land Rehabilitation
75. The land area containing retained vegetation is required to be rehabilitated with local
native species suitable for the area and the species selection consistent with the
naturally occurring species in the area whilst maintaining compliance with bushfire
conditions within this approval. The works must be undertaken in accordance with an
Operational Works approval.
76. A Vegetation Management and Rehabilitation Plan is to be prepared by a qualified
person* and submitted for approval as part of the operational works application. This
plan must include (but not limited to):
a. Existing remnant vegetation protection;
b. Vegetation rehabilitation;
c. Weed management; and
d. Performance outcomes and how and when they are to be achieved.
77. A “no clearing zone” must be established and maintained over the area identified as ‘1
– Existing Remnant Vegetation to be retained with weed management implementation’
within the Landscape Concept Design Package plan LCP5 listed within this Decision
Notice. With the exception of the trees approved to be removed in the conditions of this
approval. The following activities must not be carried out within the no clearing zone:
a. clearing, cutting down, poisoning, lopping or pruning of native vegetation which is
indigenous to, or planted within, the zone
b. soil/spoil dumping and/or compacting
c. soil excavation, other than for planting indigenous native plants.
The following exceptions apply:
Page 12 of 53
Document Set ID: 23746767
Version: 6, Version Date: 22/05/2025