                 55.    All stormwater quality treatment devices must be maintained in accordance with the
                        Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
                        approved Operational Works drawings for the stormwater quality treatment system and
                        detailed life cycle costing of the system must be attached as an addendum to this
                        document. Records of all maintenance activities undertaken must be kept and made
                        available to Council upon request.
                 56.    Operating roof water harvesting tanks must be provided for the development. The tanks
                        must be provided in accordance with an Operational Works approval and must include
                        in particular:
                        a.      a total tank capacity of 135,000 litres
                        b.      a catchment of not less than 2,800m2 of the building roof area
                        c.      re-use of harvested stormwater for non-potable outdoor uses including irrigation
                                of landscaped areas and swimming pool top-up.
                 57.    Certification must be submitted to Council from a qualified person which certifies that
                        the stormwater harvesting tanks and associated reticulation has been installed in
                        accordance with the requirements of this Decision Notice.
                 Acid Sulfate Soils
                 58.    An Acid Sulfate Soil Management Plan must be prepared and submitted with the
                        Operational Works application for the site. The acid sulfate management plan must
                        include testing, monitoring and treatment requirements for the works.
                 Services
                 59.    Unless otherwise stipulated by telecommunications legislation at the time of
                        construction, the development must be provided with all necessary conduits, pits and
                        pipes to accommodate the future connection of optic fibre technology
                        telecommunications.
                 60.    Certification must be submitted to Council from all relevant service providers (Energex,
                        NBN and Unitywater which certifies that the development has met the requirements of
                        this Decision Notice and all applicable legislation at the time of construction.
                 Easements
                 61.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                        party infrastructure located on the subject site must be placed within an easement
                        registered against the title of the property.
                 62.    All easements must be designed in accordance with the planning scheme and granted
                        at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                        easement documentation must be in accordance with the Grantee’s standard easement
                        terms. Draft easement documentation must be submitted to Council for endorsement.
                 63.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.
                 Earthworks and Retaining Walls
                 64.    All excavation, fill, soil retaining structures and associated batters must be undertaken
                        in accordance with an Operational Works approval and contained entirely within the
                        subject site unless written permission from the respective landowner(s) is provided to
                        Council.
                 65.    All retaining walls must be designed and constructed in accordance with the planning
                        scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
                        walls that are publicly accessible and exceed 1.0m in height must be fitted with a
                        commercial grade safety fence.



                                                                                                       Page 9 of 53
Document Set ID: 23746767
Version: 6, Version Date: 22/05/2025

Log in to download the original (SUPERSEDED Decision Notice - Council Meeting Decision MCU21 0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.