PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 OCTOBER 2018
41. Where proprietary devices are endorsed as part of the Operational Works Approval, a
copy of a signed supply agreement between the body corporate/site operator and the
stormwater filtration system supplier for the maintenance of the proprietary devices
must be provided to Council prior to the pre-start meeting for the development. The
supply agreement must be for at least 10 years.
Acid Sulfate Soils
42. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and provided in the application for the Development Permit for Operational Works.
43. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a pH range of 6.5-8.5 pH units;
50mg/L maximum total suspended solids concentration;
0.3mg/L maximum total iron concentration;
0.2mg/L maximum total aluminium concentration;
no visible plume at either the point of release from the site or within a waterway.
44. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 “Concrete Structures for Retaining
Liquids” to ensure groundwater does not enter the basement after construction is
completed.
45. All treated material must undergo verification undertaken by a qualified person* using
the SPOCAS or Chromium Reducible Sulphur testing suite, and the results must be
submitted to Council for appraisal.
46. The application for Operational Works must demonstrate that continual dewatering of
groundwater’s will not occur as a result of groundwater movement along any bedding
material associated with pipes and around the basement of the development.
Electricity and Telecommunication Services
47. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
48. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements/Covenants
49. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
50. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
51. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Page 28 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.