PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                1 MARCH 2016


    31.   Unless legal access has been provided through the adjacent Precinct E2, a
          turnaround area shall be constructed within the development (Precinct F) to Council’s
          standards. This may be removed once alternative access through Precinct E2 has
          been made available to an appropriate standard.
    33.   Carparking shall be provided within the site generally as shown on the approved
          plans. Carparking shall include 324 carpark spaces with 274 of these to be covered
          carpark spaces, and include 10 clearly defined disabled carpark spaces.
          Motorcycle/scooter parking spaces may be incorporated at a rate of 4 spaces
          equivalent to 1 car space.
    46.   Roof water runoff from any new building should be directed to a rainwater storage
          systems or tanks. Storages and/or tanks shall be installed to ensure water from the
          tanks/storages is used for external uses (such as watering gardens, irrigation,
          ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc)
          in accordance with the Water Sensitive Design Code of the Noosa Plan. The location
          and capacity of the tanks shall be clearly shown on the plans submitted for
          Operational Works approval and any overflow shall be directed to the road
          frontage/the stormwater drainage system/etc located on Leslie Drive.
    47.        All stormwater drainage shall be managed so that:
          a)     there is no net increase in 1 year ARI peak stormwater flows from the site; and
          b)     the discharge of stormwater from the site does not affect the approved design
                 residence time of the Noosa Springs Golf Course lake system.
    48.   All stormwater drainage shall be collected and discharged in a manner to ensure no
          harm to the receiving natural and built environments.
    49.   Stormwater run-off must be treated to prevent prescribed water contaminants and
          nutrients discharging from any part of the site at concentrations that are likely to
          cause cyanobacteria, algal outbreak or other adverse reaction within the Noosa
          Springs Golf Course lake system or other receiving waters.
          The application for Operational Works must include a Water Quality Management
          Plan submitted to the Council for approval prior to obtaining a Development Permit
          for Operational Works.
          Where stormwater runoff from the site will enter the Noosa Springs Lake System, the
          Water Quality Management Plan must be endorsed by an aquatic scientist or
          equivalent expert in the field of water quality management, and include the following
          information:
          MUSIC Modelling and calculations to demonstrate that concentrations of Total
          Nitrogen, Total Phosphorous and prescribed water contaminants at risk of occurring
          in runoff from the developed site will be no more than pre-development concentration,
          or be of a concentration that is compatible to the water quality needs of the lake
          system.
          Monitoring protocol to confirm that any nutrients or prescribed water contaminants at
          risk of runoff from the development site is not responsible for adverse water quality
          matters within the Noosa Springs Lake System.
          Where waters will bypass the Noosa Springs Lake System, the Water Quality
          Management Plan must include calculations certified by an RPEQ to demonstrate the
          following will be achieved:
               the design residence times of the Noosa Springs Golf Course lake system are
                 maintained;




                                                                                 Page 41 of 79
Log in to download the original file

2016-03-01 Planning & Organisation Committee Agenda(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.