Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2016-03-01 Planning & Organisation Committee Agenda

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 1 MARCH 2016


Assessment
The condition should be amended to remove reference to the previous stormwater design and
ensure no net increase in runoff. It is recommended the condition read:
47.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged generally in
      accordance with Tate Professional Engineers Drawing Number C1732/05/F/P04 revision H
      dated 07/06/07 shall be managed so that:
      a)   there is no net increase in 1 year ARI peak stormwater flows from the site; and
      b)   the discharge of stormwater from the site does not affect the approved design
           residence time of the Noosa Springs Golf Course lake system.


Condition 48 – Stormwater Discharge
48.   All stormwater drainage shall be collected on site and discharged to the internal lakes
      (within the Noosa Springs development) in accordance with previous approvals.
Assessment
The use of lake systems is no longer a preferred means for treating stormwater from
developments . The lake system for Noosa Springs also now sits on a separate parcel of land
and alternate drainage solutions may be preferable. It is recommended the condition be
amended to reflect the requirements of The Noosa Plan and allow flexibility in the design
approach for the new development.
48.   All stormwater drainage shall be collected on site and discharged to the internal lakes
      (within the Noosa Springs development) in accordance with previous approvals and
      discharged in a manner to ensure no harm to the receiving natural and built environments.




Condition 49 – Stormwater Treatment
49.   Stormwater run-off from the carparking areas and the driveways shall have the first flush
      (the first 12 mm of rainfall or hose-down) collected in grease/oil arrestors (or similar
      devices) provided on site to ensure that polluted run-off such as oil and grease are
      separated from the main body of stormwater and do not enter the internal lakes of the
      Noosa springs Golf Course.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system,
      bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be continued to be complied with for the duration of
      the approved Use.




                                                                                  Page 56 of 79
Log in to download the original file

2016-03-01 Planning & Organisation Committee Agenda(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.