Original source · versioned page text
Development Application part 2 Report and Plans MCU13/0052
The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCelebmol1g NDDsa since 1968 NOOSA NEWS March 5,2013 I 45
High-speed National Broadband
II!
Network fixed wireless for
Sunshine Coa~t IQc~’ government area
-lrt ~ r-r.~
,
"-...-" ’l’., ~}~ r.... n
The Sunshine Coast local government area is soon to receive the National Broadband Network’s
(NBN)fixed wireless service
N BN Co is planning to acquire and build fixed wireless facilities across Over the coming months NBN Co will be conducting community
the Sunshine Coast local government area to deliver high-speed consultation in the Sunshine Coast local government area regarding
broadband services to homes and businesses in Belli Park, Bli Bli, the broader fixed wireless network rollout and about individual
Bridges, Boreen Point, Cooloolabin, Cooran, Cooroy, Cootharaba, fixed wireless facilities.
Dulong, Gheerulla, Hunchy, Kenilworth, Kidaman Creek, Kin Kin,
Mapleton, Pinbarren, Pomona,Tinbeerwah, Verrierdale and Woombye.
Community Information Sessions 13"’, 14"’, 19th
Other areas in the Sunshine Coast local government area will receive
and 20’" March 2013
either fibre or satellite services depending on where they are located.
If you would like to find out more about the NBN fixed wireless
The Federal Government has set a target for NBN Co to connect network in the Sunshine Coast local government area, please drop
93 per cent (with a minimum obligation of 90 per cent) of Australian into an Information Session near you at any time between 3pm and
homes and businesses to fibre-to-the-premises technology. To 7pm to see the information display and talk to NBN representatives.
reach all homes and businesses in our vast country, fixed wireless NBN Co is providing four Community Information Sessions at:
and satellite services will be used for the remaining parts of Australia
Cooran -
Wednesday 13th March 2013 at the Cooran Memorial
including certain areas in the Sunshine Coast. Fixed wireless and
School of Arts Hall, King Street, Cooran
satellite services represent a significant improvement to services
Kenilworth -
Thursday 14th March 2013 at the Kenilworth Hall,
currently available to many Australians living in rural, regional and
Elizabeth Street, Kenilworth
remote communities.
Eumundi -
Tuesday 19th March 2013 at the Eumundi CWA Hall,
80 Memorial Drive, Eumundi
What is fixed wireless technology?
Woombye -
Wednesday 20th March 2013 at the Mini Auditorium,
NBN’s fixed wireless network, which uses advanced technology Suncoast Church, Cnr Kiel Mountain & Schubert Roads,Woombye.
commonly referred to as LTE or 4G, is engineered to deliver services
to a fixed number of premises within a coverage area. This means More information
~
that the bandwidth per household is designed to be more consistent, To find out more about the National Broadband Network and
even in peak times of use. what it means to you, call 1800 881 816,visit nbnco.com,lfu
,
or email [email protected]. ~~
The network will use cellular technology to transmit radio signals to
and from a small antenna fixed on the outside of a home or business,
which is pointed directly towards the fixed wireless facility.
~.....w
NBN’s fixed wireless facilities operate at very low levels of radio
frequency electromagnetic energy (EME).The Australian Radiation
Protection and Nuclear Safety Agency (ARPANSA)has confirmed
there are no established health effects from these very low-powered
radio signals. More information is available from the ARPANSA
website www.arpansa.gov.au. l
"
I’,
"or’
Il" I
Consultation and town planning requirements
~
NBN Co works in consultation with local councils to determine an
efficient and effective way to rollout the fixed wireless network.
A key consideration in these decisions is the design of the
network, which takes a number of factors into account including
population density, geography, radio frequency and other
network specific considerations.
Wherever possible NBN Co looks actively to use existing
infrastructure when planning the fixed wireless network before
proposing new structures.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.