Log in to see the plans as drawnPrime Site Selection Reasons
Considering the factors identified above, Candidate C was ranked, as the preferred
location for the facility as the site is able to meet NBN’s target coverage objectives, whilst
maximising physical separation from surrounding rural-residential properties and
minimising potential visual amenity impacts. In summary, the site is considered to offer the
best solution because:
. The site is appropriately located within a rural area which is characterised by
agricultural properties, heavily vegetated areas and large rural-residential
allotments;
. The site has already been significantly modified and contains similar infrastructure
such as the energex electricity network, which runs from north to south through the
property (approximately 20 m east of the proposed facility);
. The existing use of the site for forestry and logging purposes would not be
compro’mised by the proposed facility;
. The proposed location provides an adequate separation distance from community
sensitive land uses and is located in proximity to only three (3) residential
dwellings within a 500 m radius;
. The proposed facility is located a sufficient buffer distance from environmentally
sensitive locations (approximately 900 m from the edge of Lake Cootharaba) and
no significant vegetation removal will be required;
. The location provides line of sight to other planned site$ in the NBN wireless
network specifically Boreen Point, Coondoo West and David Cootharaba (Davis
Road Cootharaba); and
. The siting of a Telecommunication Facility on this site will meet coverage
objectives for the area; and
. Visual impact will be minimised given the pr sence of mature vegetation
surrounding the site which will assist with visually integrating the monopole within
its surroundings ana reducing the visual dominance of the structure.
NBN-4NBZ-4POM-5136 -
Boreen Point North Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.