Development Application part 2 Report and Plans MCU13/0052

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
500 m ef the propesed facility, lecated to. the nerth ef the subject preperty. Figure 4.2
illustrates’the site lecqtien and characteristics.




The prepesed 7 m x 10m lease area (NBN ce’mpeund) is lecated in the nerthern portien ef
the preperty. The NBN cempeund will be setback apprpximately 40 m from the nerthern
preperty beundary, 630 m frem the eastern let beundary, appreximately 240 m from the
western let beundary and appreximately 1.1 km frem ttie seuthern let beundary. Altheugh
the propesed facility is lecated approximately 60 m frem the berder ef the Great Sandy
Natienal Park, the lecatien is censidered appropriate as the facility will be separated from
the Natienal Park by a bitumen road and lecated ever 350 m frem the clesest pertien ef
 mapped .remnant veget tien within the Natienal Park The prepesed facility is etherwise
 appropriately setback frem environmentally sensitive areas (eg mere than 900 m frem
 lake Ceetharaba and 300 m from ensite Remnant Vegetatien) and will net require
’remeval ef any vegetatien. Access to. the property is currently provided via lake Flat Read
 via an existing 180 m inte~nal access track.


Figure 4.3 and 4.4 shews the propesed lecatien ef the facility en the subject site.




NBN-4NBZ-4POM-5136    -   Boreen Point North                                          Page 15
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0052.pdf · 119 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.