Development Application part 2 Report and Plans MCU13/0052

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.2    Site Selection
The proposal site was selected as it met the NSN Co coverage objectives. As discussed
in Section    3, a number of candidates were examined within the search area which
resulted in the chosen candidate at 153 Lake Flat Road, Soreen Point. Furthermore, the
reasons for   selecting this site are as follows:
   .   The site is appropriately located within        a    rural   area   which is characterised    by
       agricultural    properties, heavily      vegetated     areas    and     large   rural-residential
       allotments;

   .   The site has already been significantly modified and contains similar infrastructure
       such as the energex electricity network, which runs from north to south through the
       property (approximately 20 m east of the proposed facility);
   .   The existing use of the site for forestry and logging purposes would                     not be
       compromised by the proposed facility;
   .   The proposed location provides an adequate separation distance from community
       sensitive land       uses   and is located in   proximity to only three (3) residential
       dwellings within a 500 m radius;
   .   The proposed facility is located a sufficient buffer distance from environmentally
       sensitive locations (approximately 900 m from the edge of Lake Cootharaba) and
       no   signifi~nt vegetation removal will be required;
   .   The location  provides line of sight to other planned sites in the NSN wireless
       network specifically Soreen Point, Coondoo West and David Cootharaba (Davis
       Road Cootharaba); and

   .   The  siting of a Telecommunication Facility             on    this site will    meet   coverage
       objectives for the area; and
   .
       V!sual impact will be minimised given the presence of mature vegetation
       surrounding the site which will assist with visually integrating the monopole within
       its surroundings and reducing the visual dominance of the structure.




NBN-4NBZ-4POM-5136     -   Boreen Point North                                                 Page 21
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0052.pdf · 119 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.