Log in to see the plans as drawn . The facility has been located on a site surrounded by heavily vegetated areas
which will provide significant screening benefits from all areas of Boreen Point
North and Cootharaba, but in particular the residential dwellings to the north west,
Lake Cootharaba to the east, Lake Flat Road and the Boreen Point North
township;
. The proposed facility is setback sufficiently from public open spaces within the
wider area;
. The monopole was selected for the proposal due to its slim line appearance and
minimal visual obtrusiveness when viewed from a distance.
. The monopole design is deemed to be more appropriate than a lattice tower as it
can bepainted a colour that will provide a degree of visual integration and
camouflage the facility with the surrounding landscape and vegetation
The proposed facility has been appropriately sited on the periphery of the township and
located as far away from residential dwellings as possible whilst still being capable of
providing service across the township, resulting in a minimal impact on the scenic amenity
of the area. While it is acknowledged that the proposed facility will be an addition to the
locality, communication facilities are now an accepted part of the landscape (much like
powerlines) as they provide a necessary service and essentially contribute to the wellbeing
of areas such as Boreen Point North and Cootharaba.
8.2 Heritage
In order to determine any possible natural or cultural values of state or national
significance associated with the site, a search was conducted through the relevant
Heritage Registers (refer to Appendix 5). There are no known items of cultural, historical
,) or environmental heritage significance located in the vicinity of the proposal site.
8.3 Electrical Interference and Grounding of the Facility
(
\
The NBN fixed wireless broadband network is licensed by the Australian Communications
and Media Authority (ACMA)for the exclusive use of the OFDMA2400 frequency band. As
NBN Co is the exclusive licensee of this sub-band, emissions from NBN Co equipment
,I’ within the frequency band will not cause interference.
Filters also ensure facility meets the ACMA specifications for emission of
that each
spurious signals outside the NBN Co frequency allocations. NBN Co will promptly
investigate any interference issues that are reported.
The facility is also grounded to the relevant Australian Standards -
that is, the facility will
be ’earthed’.
~ I 8.4 Erosion, Sedimentation Control and Waste Management
All erosion and sediment control mitigation measures will be detailed in construction plans
and will comply with the Building Code of Australia and local Council standards. In
addition, contractors must comply with the ’NBN Construction Specification’ that requires
contractors to undertake the necessary erosion and sediment control measures in order to
protect the surrounding environment. On completion of the installation, the site will be
restored and reinstated to an appropriate standard. No waste which requires collection or
disposal will be generated by the operation of the facility.
8.5 Remnant and Regrowth Vegetation
In order to determine any existing remnant and regrowth vegetation on site, a search was
conducted through the relevant environmental searches (refer to Appendix 5). Under the
NBN-4NBZ-4POM-5136 -
Boreen Point North Page 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.