Landscape Plans

Attached to the e-mail OPW16/0021- Operational Works Application 1 of 4.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            71 Seaview Terrace, Sunshine Beach                                                                                                                   General Notes
            Landscape Pricing Package Package
                                                                                                                                                                 NOTE: This landscape plan must be read in conjunction with the appropriate
                                                                                                                                                                 statutory approvals and australian standards.
            Schedule of Drawings
            L001         Layout, Schedule & Notes                                                                                                                GENERAL
            L002         Finishes Schedule                                                                                                                       ·  For more detail refer to the project architect's, and engineers drawings.             TOPSOIL
            L003         Plant Schedule                                                                                                                                                                                                                   ·  Install approved imported topsoil (to comply with AS4419) to planting areas if
            L004         Plant Schedule                                                                                                                          ·        Planting shown reflects the design intent, exact numbers and locations will        ameliorated site topsoil is not available.
            L201         Surfaces Plan                                                                                                                                    require confirmation on site by the superintendent. any changes to be made      ·  Where site soil is to be used as topsoil, ameliorate site soil as specified by the
            L202         Surfaces Plan                                                                                                                                    to the landscape plan must be approved by the landscape architect and              soil testing laboratory. all soil stockpiles are to be maintained to control
            L203         Surfaces Plan                                                                                                                                    superintendent.                                                                    weeds routinely and guard against dispersion by wind or water. stockpiles
            L204         Surfaces Plan                                                                                                                                                                                                                       shall be limited to a max. height of 2m and may require covering or retaining.
            L205         Surfaces Plan                                                                                                                           ·        All structures to be approved by the appropriate government departments            stockpiles are not permitted within close proximity to residential properties.
            L301         Planting Plan                                                                                                                                    prior to any construction taking place.                                         ·       generally soil to be used shall comply with the following specification:
            L302         Planting Plan                                                                                                                                                                                                                    ·       (1) friable and free draining.
            L303         Planting Plan                                                                                                                           ·        All landscape plans presented assume that all base and survey information is    ·       (2) good texture and structure for selected use
            L304         Planting Plan                                                                                                                                    accurate and to scale. the contractor shall check landscape plans presented     ·       (3) acceptable conductivity and ph levels for intended plant species to be
            L305         Planting Plan                                                                                                                                    for any discrepancies with the existing site conditions or other drawings          planted.
            L401         Landscape Details                                                                                                                                presented prior to any construction work taking place. if discrepancies do
            L402         Landscape Details                                                                                                                                occur these shall be highlighted at once to the superintendent prior to any     MULCH
            L403         Landscape Details                                                                                                                                construction work taking place.                                                 ·  All mulch proposed to be used on site shall be free of forign matter including
            L404         Landscape Details                                                                                                                                                                                                                   anthropogenic waste, rock, soil, sediment contamination, weeds and sticks.
            L501         Landscape Elevations and Sections                                                                                                       THE CONTRACTOR SHALL:                                                                    ·  Planted areas shall be mulched to a minimum 100mm deep to ensure site
            L502         Landscape Elevations and Sections                                                                                                       ·   Install silt control fencing as required.                                               water conservation requirements are achieved.
            L503         Landscape Elevations and Sections                                                                                                       ·   Remove all unwanted material from site.                                              ·  Keep mulch 50mm clear of plant stem.
                                                                                                                                                                 ·   Confirm all dimensions on site prior to construction.
                                                                                                                                                                 ·   Seek instruction from superintendent where level discrepancies, specification        GRADES
                                                                                                                                                                     substitutions and poor soil structure occurs.                                        ·  Mulch garden bed areas should not exceed a 1:3 grade and turf areas should
                                                                                                                                                                                                                                                             not exceed a 1:4 grade.
                                                                                                                                                                 SERVICES
                                                                                                                                                                 ·   The contractor shall confirm the location of all services with relevant              IRRIGATION
                                                                                                                                                                     authorities prior to planting and excavation.                                        ·    These landscape plans assume all landscaped areas will be irrigated
                                                                                                                                                                 ·   All trees must be planted a min. of 1000mm from underground services.                     automatically with popup sprinklers and sprays, dripp irrigation will not be
                                                                                                                                                                                                                                                               accepted. Irrigation system to be installed to appropriate standards and by a
                                                                                                                                                                 SUBSOIL DRAINAGE                                                                              suitably qualified person and have a minimum 12 month warranty.
                                                                                                                                                                 ·    Install sub-soil drains as required and where garden abuts building and
                                                                                                                                                                      connect into stormwater drainage system.                                            WARRANTIES
                                                                                                                                                                 ·    Sub soil drains shall incorporate a trench with a geotextile lining, drainage       ·  Warranties or guarantees specified shall name the Principal as warrantee.
                                                                                              L-01                                          L-02                      gravel backfill material and a 100mm slotted ag pipe to the following
                                                                                                                                                                      specification.
                                                                                                                                                                                                                                                             Register with manufacturers as necessary. Retain copies delivered with and
                                                                                                                                                                                                                                                             compnents and equipment to the Principal.
                                                                                                                                                                           Geotextile material: Geotextile material shall be a non-woven type and            Warranties and/or guarantees to be submitted to the Superintendent for
                                                             SEAV
                                                                                                                                                                   ··                                                                                     ·
                                                                                                                                                                           shall have a strength rating (G) of greater than 900                              transmission to the Pricipal within fourteen (14) days after practical
                                                                  IEW                                                                                              ··      Backfill material: 20mm drainage aggregate in accordance with AS 2758 -           competion.
                                                              TCE                                                                                                    ··
                                                                                                                                                                           1998.                                                                          ·  Commence Warranty periods at practical completion or at acceptance of
                                                                                                                                                                                                                                                             installation, if acceptance is not concurrent with practical completion.
                                                                                                                                                                               1 "Perforated Drainage Pipe and Associated Fittings". Perforations shall   ·  If installation is not by manufacturer and product warranty is conditional on
                                                                                                                                                                               not exceed 0.7mm in diameter or width.                                        the manufacturer's approval of the installer, submit the manufacturer's
                                                                                                                         L-04                                    ·        Ensure drainage works correlate with adjacent land and specified finished          written approval of the installing firm.
                                                                           L0-03 & L-04                                                                                   levels.
                                                                                                                                                                                                                                                          MAINTENANCE TASKS
                                                                                                                                                                 SURFACE DRAINAGE                                                                         Maintain whole of landscape works for establishment period of 13 weeks.
                                                                                                                                                                 ·  Install field inlets to locations and levels as indicated on plans. Finish surface    ·    Irrigation and watering
                                                                                                                                                                    pit level flush with adjacent finished surface levels. Ensure positive overland         ··       Every 2-3 days during the establishment period.
                                                                                                                                                                     drainage flow to all pits and that no ponding occurs around the pit. Align all         ··       Once a week there after.
                                                                                                                                                                    pits square with to paths, pavement patterns, kerbs, walls and alike.                 ·    Weed removal and wick wiping
                                                                                                                                                                 ·  Install continuous surface drainage system to locations and levels as indicated         ··        As required to reduce competition and seeding.
                                                                                                                                                                     on plans. Finish surface pit level flush with adjacent finished surface levels.      ·    Plant Replacement
                                                                                                                                                                    Ensure positive overland drainage flow to all continuos pits and that no                ··       Immediately replace plants that die or fail to thrive, are damaged or
                                                                                                                                                                    ponding occurs around the pit. Align all pits square with to paths, pavement                     stolen, with plants of the same species and of similar size and quality
                                                                                                                                                                    patterns, kerbs, walls and alike.                                                                unless otherwise specified.
                                                                                                                                                                 ·  Install pits to manufacturer's recommendations.                                       ·    Stakes and Guys
                                                                                                                                                                                                                                                            ··       Adjust and/or replace stakes and ties where required. Remove staking
                                                                                                                                                                 TURF AREAS                                                                                          and guying when instructed by the superintedent.
                                                                                                                               K




                                                                                                                                                                 ·  Cultivate ground to a depth of 150mm and level/trim, treat with 150mg/m2 of           ·    Remulching
                                                                                                                             AR




                                                                                                                                                                    gypsum.                                                                                 ··       As required to maintain a consistent depth until plants are established.
                                                                                                                                                                 ·  Install 100mm of approved topsoil as specified.                                       ·    Monitoring
                                                                                                                           LP




                                                                                                                                                                 ·  Finished turf grades/contours to be generally smooth, coordinate on site with           ··       Provide a monthly report on completed tasks.
                                                                                                                                                                    superintendent and ensure levels are approved prior to turfing.
                                                                                                                        NA




                                                                                                                                                                 ·  Supply and lay turf as indicated on the drawings.
                                                                                                                                                                    Water turf in well and refer to suppliers maintenance requirement for
                                                                                                                      IO




                                                                                                                                                                 ·
                                                                                                                                                                    establishment.
                                                                                                                    T




                                                                                                                                                                 ·  Apply water to maintain soil moisture until established.
                                                                                                                 NA
 For OPW APPROVAL




                                                                                                                                                                 PLANTING LAYOUTS
                                                                                                               A




                                                                                                                                                                 ·   All planting layouts are to be approved by the landscape architect on site prior
                                                                                                           OS




                                                                                                                                                                     to planting.
                                                                                                        NO




                                                                                                                                                                 GENERAL PLANTING
                                                                                                                                                                 ·  Plant stock is to be approved by contractor and qualified arborist prior to
                                                                                                                                                                    acceptance of delivery.
                                                                                                                                                                 ·  Mulch bed areas should not exceed a 1:3 grade. where slopes are greater than
                                                                                                                                                                    1:3 install biodegradable mulch retaining netting.Where slopes are greater
                                           BE                                                                                                                       than 1:2 install jute mesh product to manufacturers specification.
                                                AC
                                                                                                                                                                 ·  For mass planting in mulch bed areas excavate to a depth of 300mm.
                                                                                                                                                                 ·  Cultivate subgrade to a depth of 150mm and treat with 150mg/m2 of gypsum.
                                                       H                                                                                                         ·  Install specified topsoil and crown bed at centre with mulch as specified.
                                                                                                                                                                 ·  No synthetic, granular blended fertilisers to be used on site. slow release
                                                                                                                                                                    organic tree tablets shall be used at establishment.
                                                                                                                                                                 ·  All plantings shall incorporate the inclusion of a slow release native plant
                                                                                                                                                                    fertilizer (as per manufacturers specification) and the use of a soil moisture
                                                                                                                                                                    retention additive (as per manufacturers specification), placed adjacent the
                                                                                                                                                                    plant root ball at the time of planting.
                                                                                                                                                                 ·  Trees are to be certified by a qualified arborist as natspec compliant prior to
                                                                                                                                                                    delivery to site. Qualified arborist to select natspec compliant trees at nursery
                                                                                                                                                                    and check on delivery to site.



                                                                                                                                                                                                                                                                              PROJECT. NO.                         LANDSCAPE ARCHITECTURE
                                                                              SCALE                                                                                                                                                                                                                                          URBAN DESIGN
                                                                                      © COPYRIGHT

04.02.16      A        OPW                                     NR     JB
                                                                              A1 NA   This drawing is copyright and the
                                                                                      property of James Birrell Design Lab and
                                                                                                                                 Universal Property Company Establishment 71 Seaview Terrace, Sunshine Beach
                                                                                                                                 Client                                                        Project Address                                                               050 1314
                                                                                                                                                                                                                                                                                                                         FURNITURE DESIGN

                                                                                                                                                                                                                                                                                                                      Level 2, 4 First Avenue,
07.12.15      P4       for pricing                             NR     JB      A3 NA                                                                                                            Landscape Documentation Package                                                                                       Maroochydore Qld 4558
                                                                                      must not be retained, copied, reproduced                                                                                                                                               DWG. NO.              ISSUE
16.11.15      P3       for discussion                          KS     JB
13.11.15
06.11.15
  Date
              P2
              P1
               Issue
                       for discussion
                       for discussion
                                         Description
                                                               JV
                                                               JV
                                                                      JB
                                                                      JB
                                                              Drawn Checked
                                                                                      or used without prior written authority.
                                                                                                                                                                                              LAYOUT, SCHEDULE + NOTES                                                       L001                   P5
                                                                                                                                                                                                                                                                                                                              (07) 5326 1855
                                                                                                                                                                                                                                                                                                                    [email protected]
                                                                                                                                                                                                                                                                                                               www.jamesbirrelldesignlab.com
Log in to download the original file

Landscape Plans.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.