Council archive · source document
Proposal Plans 9-KAURI-DA-09.0822 · MCU22/0144
Plans and drawings: the text below has words only, no drawings.
- workmanship and materials shall be in accordance
with relevant current s.a.a codes and statutory
authorities requirements
- all dimensions and levels to be checked on site by
fibrecement sheeted gables with cover battens builder before commencing work
colourbond Trimdek [email protected]° powdercoated Heka wndow hood - do not scale drawings
top of roof colourbond fascias & flashings
powdercoated Heka wndow hood
RL119.75
7.80m above
natural ground
2,400
FL115.65
2,850
natural ground
FL112.8
panel-lift garage door
U4 U5 U6 U7 powdercoated batten privacy screen
U7 aluminium framed windows.
powdercoat finish
Cemintel 'Edge 150' grooved fibrecement
south elevation sheet cladding. paint finish
east elevation
colourbond Trimdek [email protected]°
colourbond quad gutters & fascias fibrecement sheeted gables with cover battens
Breezway louvres
2,400
FL115.65
2,850
natural ground
FL112.8
rendered & painted block screen
U7 U6 U5 U4 alum. framed sliding door.
powdercoat finish
natural ground U4 powdercoated batten privacy screen
north elevation Cemintel 'Edge 150' grooved fibrecement
sheet cladding. paint finish
west elevation
elevations- block B
0 5 10
no. date amendments
Client Location Drawing Scale Drawn
SUNSHINE GROVE PTY. LTD. ELEVATIONS AM 1:100@A2
9 KAURI STREET BLOCK B
Project COOROY Drawing no. Page Date
62 hilton terrace QBSA reg. 65073 PROPOSED 10 UNIT
09.0622.1.6 JUNE 2022
noosaville (07) 5449 9066
[email protected]
DEVELOPMENT 1.6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans 9-KAURI-DA-09.0822.pdfRelated documentApplication case desk ↗
Proposal Plans 9-KAURI-DA-09.0822.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.