Original source · versioned page text
Approved Plans OPW20-0051 1 of 3
The original of this document is very large (54.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn - NOOSA COUNCIL
APPROVED PLAN
OPW20/0051 23 SEP 2020
[OCR of page images]
NOOSA COUNCIL
APPROVED PLAN
OPW20/0051 23 SEP 2020
SP268743
Ve
| \etassr20
A
CAUTION
LIVE LV CABLES
sc1446100
& ¥
& )
a
240 AL AC LY)
pag ALAC LV)
:
sige
“e
ESIGN CONTINUES ON
SHEET 7
‘URD CIVIL WORKS SCHEDULE - FOOTPATHS & ROAD CROSSINGS (BY ELECTRICAL CONTRACTOR)
vocanon_|staTONS ‘CONDUIT LENGTH (m) BENDS (AngiNo) ;rvocanis | xsecTON [ona kere vemarns
JFROW - To} Zor, [TOO], |F25mM |, [Cons] aOmm_[ Toon | TaSmm_[-Oommc| POTS TON EXCAV|TRENCH] WIRE | MARK|
ft wo 1. ‘Mo _[Ang.[Ne[Ang.[No:[ Ang. [No:| Ang. [Ne. TAPE | DETAIL
DIANELLA COURT | 24 [ 25 sop 3st z 3] 3 iw
TAKE MACDONALD REPLACE E MARKERS OPEN CUT ROAD
DRIVE. 25 | 28 aw |r| a ft “6 alos 2 | SURFACE -30m SHALLOW TRENCH, LOCATE
‘AND FOLLOW ESTING CONDUITS,
WILGEE COURT [26 a7 ote a av
DANGER - STN 24-27
HANDSINK
FULL DEPTH & FULL MOTH MAJ
PLANT IN VICINITY
450mm MIN & FULL WIOTH
TOLOCATE UIG NBN SERVICES
TOLOCATE UIG WATER MAIN
TOLOGATE UIG SEWER MAIN
TOLOCATE UIG STORM WATER
JOR
SERVICES
TOLOCATE UIG ELECTRICAL MAIN
"ARRANGE FOR LOCATIONS PRIOR TO ANY
XGAVATIONS:
UNDERGROUND GABLE SCHEDULE
Ton STATONS Lous] w To [ROUTE [ABLE LENGTH, x
OeATION —_ [STATONS [vou roles] REC] CABLE SIE TPE MODELIO [ROUTE JPABLELENGTI co] REMARKS
DARELR COURT 24] 25 | WX TW GRELE ALAC HOMPEPVC = z
iv x|_ versie acacaauperve m | wawmov| 3 | 8 DIRECT FROM Sc144st00
TARE MACDONALD] 25] | WW | LY GABLE ALAC 240 PE-PVC Ti 3 75
IVE wv x|_tweaste aac 2a0apepvc m | waszawov | 45 _| 8 DIRECT FROM Sc1446100
WHEGEE COURT} 25-37} WW] DY GRELE ALAC 240 PE-PVC Ti zl =
Ww x| WveaBte aLacaauperve m | waweawv| 6 | 8 DIRECT FROM Sc1446t00
si | x LV GABLE CU26 18 PVCEVE ft - 8
wey w Px LY GABLE ALAC OMPE-PVC Ti 5 1
wv x] Wweaste aracaa nerve m | wvasomv| ts | 104 DIRECT FROM Sc1446100
‘SUNDRY BETAILS SCHEDULE
LOCATION | STATONS] SUNDRY SPEC DESCRIPTION ‘uantmy | cc REMARKS
TARE WAGOGRRID | 3536 sommee716 CABLE MARKER(UG CABLE GASTAL-SHALLOW)| 2
Finishes Surface
Level 1500 = 2200 ores
Trench Backfill -
See Detail A
1, Reduced depth limited to Sm of continuous trench
Gand shall not exceed 5% of the total length
of trenching on any one project.
Cable protection cover
Sinp Top face of —}
fontrele encased section +f
for fal tength
All Concrete minimum ~~
grade Fc = 25¥p0
SL81 trench mesh, full
inngtn of encased section,
2, Transition between standard depth and reduced
cover shall be gradual, and shall not exceed
pulling bending radius for cables to be run in
fonduts,
$50
Fin
Compacted lean mix
‘Wa sand/cement
conduits
a
‘00
Min
50-100mm min AC
3. The total cover over conduits from the finished
surface shall exceed 300mm,
4, This construction shall only be used if there
is no other practical / alternative solution
DETAL A: BACKFILL DETAILS ABOVE CONCRETE SLAB
© foes nnd tra or
ors | %%,
aes 0” ¥ @ JUNOERGROUND DISTRIBUTION CONSTRUCTION MANUAI|#F2__& neu Joo
i eneneeser. fav, works = make
& jot pet be (EXCAVATION AND REINSTATEMENT mo
lI fey Pete |CONDUIT INSTALLATION
SITE PLAN Ee ae =
GNX. ow someres
Se SCALE 1:500 AT AT
A [ORIGINAL enws829_| CONTACT FOR CONSTRUCTION ENQUIRIES. Auspower Connect Pty Ltd [teatnee property erviTo ENERGEX OF [38m PARENT PROJECTNO. [= Cis Consulting Group SUBDIVISION 5 LOTS INTO 16LOTS PROJECT NO ACtO11
suai, SS Fron sear anes ‘STREETLIGHTS | 0.7m 60K | GANCELLNGLOTS Tat 140 MCHTS, Lat RPBSI008, BEA GIEGTRIGAL RETIGULATION ENERGEX PROROTNO™
™ Orie Tories | LBS NEN, REFER DBYD: Lot 3 RP137375, lot 8 RP160703, et INSTALL 100kVA POLE TRANSFORMER,
i ‘PROJECT MANAGER DETAILS. GAS = Lot 101 8142407 "APPROVED DATE” 0810572020 {842m 240mm AL 4C US, 18x PILLARS. $4400175
"ABN 74 168 288 883 “TOD CONSULTING PTY LTD HP GAS = DA RALISIOOTS ‘CHECKED: ‘JMcKenna, AND 11x RATE 2 LED STREET LIGHTS
rr nttereactttereeas Tsao ie — lees ee — sagen ee eee
. “[email protected] ‘SEWER REFER DBYD | PEGGED. ‘On Request ISSUE DATE. Lake MacDonald 4563
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.