Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Approved Plans OPW20-0051 1 of 3

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (54.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 32, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   - NOOSA COUNCIL
   APPROVED PLAN
OPW20/0051 23 SEP 2020


[OCR of page images]
 

 

NOOSA COUNCIL
APPROVED PLAN
OPW20/0051 23 SEP 2020

 

 

 

VEGETATION REHABILITATION SCHEDULE FOR

BATTERS AND DEGRADED AREAS

3 YEAR MAINTENANCE SCHEDULE FOR ROAD

 

RESERVE BATTERS

 

 

 

Plant type code: T = Tree, ST = Small tree, SH = Shrub, S =

Sedge

PERFORMANCE CRITERIA

CORRECTIVE ACTION/COMMENTS,

 

 

 

 

 

 

 

 

 

 

 

 

 

YEAR 1
Monthly maintenance for the first 6
months

 

 

 

 

 

 

 

 

 

 

 

 

 

Water regularly, check moisture
content. Replant species as required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BotanicalName | CommonName| Plant | Pot Density reduced to every 2 months for the second | Remove all environmental and deciared
type Size weeds - !
6 months a ae
“Acacia hubbardiana SH 1s | 2metrecentres | | Eradication and control of all Re aera aa
environmental and declared weeds sealbte etn Sree a ec gee cece eaeeec eee pee gence eggs eeecee eg eeceec ego
‘Acacia longissima SH TS | 2mete centres | | Mulch cover as applied at planting Replant species as required, increase & zie CH 100
500% tlibestockaurvival water to seedlings and ensure mulch —
Acacia melanoxyion Wattle st T__[_Smerecentes | | Revegetation is wel established with cover CHAINAGE 100 EATTER PLANTING EXAMPLE
‘locasuarina toruiosa Forest oak T 15 | 4metrecantres | | heights, density and diversity similar to
that of naturally occurring areas of similar
Aphitona excelsa Red ash ST Ts | Smeve ites | | vegetation Approx, 80% of trees to be at m,
‘Acronychia pubescens. Hairy acronychia s Ts 2 metre centres a height at no less than 1m z
~wapingronia Brawn oH 1s | zmeveconres | | YEARZ
; Water regularly, check moisture
Castanospermum australe Black bean T Ts 5 metre centres Maintenancelevery 3 months (min) content. Replant species as required
Remove all environmental and declared
Commersonia bartramia ST 1s | @metre centres | | Clearance of all environmental and weeds, and any regrovh, Spot epray
declared weeds. Control of non-natives - »
Corymbia intermedia T 1s | Smotre contres po eet ‘depth pa
; eapply mulch to original dept sv ei gE gg EEE gee gg eee DATEL
Cryptocarya glauoescens ST TS | Smee contes | | Muon cover as applied at planting Replant species as required ao FL es Fane CH 120
*Dodenea tiquetra SH 7s | 2metrecentres | | Revegetation is well established with nee ean CHAINAGE 20 PATER EEN NG Evel
approx. 80% of trees to be at a height at , siasees
Elaeocarpus grandis T 1s | Smotre centres ; i equired, additional watering regime.
Hdeefeerguaealat ee Application of low phosphorus, organic 12 MONTHS MAINTENANCE SCHEDULE FOR WEED REMOVAL AND
“Elacocarpus reticuiatus | Blueberry ash ST Ts | dmetre centres i i
: a vegetation ee eee sarlaesaietanidian VEGETATION REHABILITATION WORKS IN COVENANT AREAS [|]
*Gahnia sieberiana ‘Sword sedge s Ts 1 metre centres a
YEAR 3 Performance Criteria Corrective Action/Comments
Giochidion terdinandi Cheese tree ST Ts | 3metrecsntres
Maintenanceievery 3|months (min) Water regularly, check moisture YEAR 4
Gucia acutifoia Norther guoia st Se are ewer | eae oe oneal aa content, Repiant species as required Monthly maintenance for the first 6 months * Water regularly, check moisture
CiNeSaiiaea oH redid | aemenaesnesetil il oceans Remove all environmental and declared reduced to every 2 months for the second 6 content. Replant species as required
weeds, treat stumps and regrowth. months ‘¢ Remove all environmental and
Lomandra longifolia Mat rush $ Ts | tmerecentes | | 50% inestock ; Replant species as required Eradication and control of all environmental declared weeds
evcoetctien ie volllectaananaa gain Additional planting of advanced stock and declared weeds * Reapply mulch to original depth
*Lomandra hystrix s Ts ‘1 metre centres oe poral panera : fou nt at | Whete required, additional watering Mulch cover as applied at planting * Replant species as required
Lophostemon confertus Boxtve T 7S Sumusenioeett| ail ae ieee thant srl height (where regime. Application of low phosphorus, >90% tubestock survival ¢ Repiant species as required,
Danity ond ciiverity similar | °94Ni¢ fertiliser (as per manufactures Revegetation is well established with heights, density and diversity increase water to seedlings and
*“Macaranga tananus ST TS ‘metre centres appropriate). Density and diversity similar | savice) where required similar to that of naturally occurring areas of similar vegetation. Approx. | ensure mulch cover
to that of naturally occurring vegetation 80% of trees to be at a height at no less than 1m
Neoiisea dealbata ST 7s | ametre contes
Notelaea longo ST 1s | smetecenres | [SCOPE OF WORKS FOR BATTERS AND VEGETATION REHABILITATION WORKS
“Omolanthus populifolius Bleeding heart iu Sinaia canae TUBE STOCK - Sun hardened tube stock plantings of recommended species are to be used _ in the rehabilitation of batters. Refer to the Planting Schedule for Batters.
Paci waa oH 7s | 2mevecnies | | TIMING - Planting of intemal batters shall follow on directly after mulch has been applied by the civil contractors. Revegetation of the batters must not begin until the area has been approved as stable as stated in the engineering plans.
ALL BATTERS OVER 1 IN 4 MUST BE COIR NETTED TO CONTAIN AND STABILISE THE MULCH.
Pelalostigme trloculere SH Ts | 2metecentres | | PLANTING - Revegetation works shall be set out in accordance with the Planting Schedule for batters and spacing specified. Plantings may be offset randomly from the grid pattern to achieve a natural mosaic of flora. A mixed matrix
arate anne a ee revegetation pattern shall be achieved so species are evenly established throughout their respective zones.
bidet eli oe eli Pee peer PREPARATION - All preparation / major earthworks shall be completed by civil contractors. All revegetation works to follow will be supervised by a qualified and experienced vegetation rehabilitation professional contractor.
Pilidiostgma glabrum SH 7s | 2mevecanres | |PLANT PLANTING GUIDELINES - Procedures for planting should be generally as follows:
1. Water tube stock well prior to planting
*Pttosporum revolutum SH ts | 2metrecsnres | 2. Any batters steeper than 1 in 4 must be coir netted
3. Soak hole thoroughly with water.
Pi ul SH 1s | 2motre contes : ; : ;
Seeeeereeeneeeeraet tre cont 4. Add slow release agri-form fertiliser and water crystals, remove tube stock from container and plant in hole. Backfill with the surplus soil located ‘he top of the plant 30mm below finished ground level.
Polyscias elegans Celery wood sT 18 | Smotreconires | |S. Provide a berm of soll around the plant to hold water, (especially on sloping ground) and create a mulch collar 100mm away from the plant stem. Water plant well
Peychottia loiceroides SH 1s | 2metre centres
Ce
“Syzygium australe st TS | Smet contres ENVIRONMENTAL LANDSCAPE PLANNING Be" a Weed PROJECT:OPERATIONAL WORKS BATTER PLANTING
Syzygium luehmanni Lit pity T Ts | 4motre centres see : 1 LANDSCAPE PLANS VEGETATION
ch 7 Tatami cot Prineipal:Mark Bizzall AND REHABILITATION FOR LAKE ‘SHEET NO; 06
ee aoe ele feed Mount Coolum 4573 Qld MACDONALD DRIVE RURAL RESIDENTIAL
Weterhousia fonbunda T TS | Smeve conves Mobile: 0431123419 SUBDIVISION ISSUE : A
Email: [email protected]

* PLANTS TO BE USED TO ESTABLISH IN 3 METER WIDE BUFFER

REFER SOUTHERN ACCESS SHEET 5

    
   

  

 

COPYRIGHT: No reproduction of all or part

 

 

 
  
  
 
 

DESIGNER: MB

express written permission of the author.

 

CLIENT: TEATREE PROPERTY PTY. LTD.

DATE: APRIL 2020

 

 

 
Log in to download the original file

Approved Plans OPW20-0051 1 of 3.pdf · 54.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.