Extension to Currency Period - Approved DBW23/0084.01 (As Published)
Officer: Georgina Schramm
Direct Telephone: 07 53296569
Our Reference: DBW23/0084.01
Your Reference: n/a
7 November 2025
DA Byrne
C/- DA Byrne
83 Coachwood Tce
BLACK MOUNTAIN QLD 4563
[email protected]
Dear Denise & Pat,
Extension to Currency Period
Planning Act 2016
I refer to your request received on 10 September 2025, to extend the currency period for an
existing development approval. On 5 November 2025, Council decided to approve your
request.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: DBW23/0084.01
Street address: 83 Coachwood Tce Black Mountain Qld 4563
Real property description: Lot 16 SP 248179
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 27 November 2023.
• Development Permit for Material Change of Use of Premises / Reconfiguration of a Lot
/ Operational Works
In relation to the request to extend the currency period for this approval, Council on 5
November 2025, decided to extend the currency period as detailed below.
A. Approve a two-year extension to the currency period.
B. Agree to the change.
C. Amend condition 3.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Document Set ID: 24280125 Page 1 of
5 Date: 07/11/2025
Version: 11, Version
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
- - Site plan (of entire site), prepared by Denise Byrne 13/11/2023
A100 1 Site Plan, prepared by wd architects (new dwelling) 26/07/2023
A300 2 House Floor plan, prepared by wd architects 26/07/2023
A302 2 Annex Floor Plan, Elevations and Sections, prepared 26/07/2023
by wd architects
A303 2 Overview with grid and survey, prepared by wd 26/07/2023
architects
A350 2 Roof Plan, prepared by wd architects 26/07/2023
A400 2 House sections, prepared by wd architects 26/07/2023
A500 2 House elevations, prepared by wd architects 26/07/2023
- - Floor Plan - 2 x container dwelling (The Shack), 14/11/2023
provided by Denise Byrne
- - Elevation Plan for 2 x container dwelling, provided by Submitted
Denise Byrne 14/11/2023
Currency Period
3. This development approval lapses if the use has not happened by 27 November 2027,
unless an application to extend the currency period is approved by Council.
Nature and Extent of Use
4. This approval allows for the use of the building for the purpose of a Dwelling House and
Secondary Dwelling in accordance with the administrative use definition of the Noosa
Plan 2020. The premises must not be used as Multiple Housing and/or Visitor
Accommodation or any other residential use as defined by Noosa Plan 2020.
Retention of Existing Trees and Vegetation
5. Existing trees on the site must be retained. Any trees removed must be replaced with
similarly sized native species prior to the use commencing.
Document Set ID: 24280125
Version: 11, Version Date: 07/11/2025 Page 2 of 5
Page 3
Geotechnical stability – structures in landslide hazard area
6. All works must be carried out in accordance with a Geotechnical Report for the site
prepared by a qualified person*. Certification must be submitted to Council from a
qualified person* which certifies that the site is not at risk from landslide emanating from
the site or from other land.
Effluent Disposal
7. The dwelling and secondary dwelling must be provided with an on-site waste water
treatment and effluent disposal system having a capacity sufficient for the use.
Water Supply
8. The development must be provided with a potable water supply, a minimum capacity of
45,000 litres of water.
Stormwater Drainage
9. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks
10. All earthworks and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
11. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Qualified Person
2. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
Document Set ID: 24280125
Version: 11, Version Date: 07/11/2025 Page 3 of 5
Page 4
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work
Plumbing Compliance Permit Effluent disposal
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. If Council agrees or agrees in part with the representations, a negotiated decision
notice will be issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on
line at www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Georgina Schramm
Development Planner
Enc: Appeal Rights
Stamped Approved Plans
DECISION NOTICE HISTORY
• Original Decision Notice – 27 November 2023
• Decision Notice – Extension to Currency Period – DBW23/0084.01; 05 November 2025; amend condition 3
Document Set ID: 24280125
Version: 11, Version Date: 07/11/2025 Page 4 of 5
Page 5
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
228 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(Refer to Schedule 1 of the Planning Act 2016)
(a) if a submitter or advice agency started the appeal in the P&E
(2) An appellant may start an appeal within the appeal period.
Court – 2 business days after the appeal has started; or
(3) The appeal period is –
(b) otherwise – 10 business days after the appeal is started.
(a) for an appeal by a building advisory agency – 10 business
(5) A notice of appeal given to a person who may elect to be a co-
days after a decision notice for the decision is given to the
respondent must state the effect of subsection (6).
agency; or
(6) A person elects to be a co-respondent by filing a notice of election,
(b) for an appeal against a deemed refusal – at any time after the
in the approved form, within 10 business days after the notice of
deemed refusal happens; or
appeal is given to the person.
(c) for an appeal against a decision of the Minister, under chapter
230 Other appeals
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
section 269(3)(a) or (4); or the Supreme Court decides a decision or other matter under this
Act is affected by jurisdictional error, the decision or matter is non-
(d) for an appeal against an infrastructure charges notice – 20
appealable.
business days after the infrastructure charges notice is given
to the person; or (2) The Judicial Review Act 1991, part 5 applies to the decision or
matter to the extent it is affected by jurisdictional error.
(e) for an appeal about a deemed approval of a development
application for which a decision notice has not been given – (3) A person who, but for subsection (1) could have made an
30 business days after the applicant gives the deemed application under the Judicial Review Act 1991 in relation to the
approval notice to the assessment manager; or decision or matter, may apply under part 4 of that Act for a
statement of reasons in relation to the decision or matter.
(f) for any other appeal – 20 business days after a notice of the
decision for the matter, including an enforcement notice, is (4) In this section –
given to the person. decision includes-
Note – (a) conduct engaged in for the purpose of making a decision; and
See the P&E Court Act for the court’s power to extend the appeal
(b) other conduct that relates to the making of a decision; and
period.
(c) the making of a decision or failure to make a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (d) a purported decision; and
(5) If an appeal is only about a referral agency’s response, the (e) a deemed refusal.
assessment manager may apply to the tribunal or P&E Court to
non-appealable, for a decision or matter, means the decision or
withdraw from the appeal.
matter-
(6) To remove any doubt. It is declared that an appeal against an
(a) is final and conclusive; and
infrastructure charges notice must not be about-
(b) may not be challenged, appealed against, reviewed, quashed,
(a) the adopted charge itself; or
set aside or called into question in any other way under the
(b) for a decision about an offset or refund- Judicial Review Act 1991 or otherwise, whether by the
Supreme Court, another court, a tribunal or another entity; and
(i) the establishment cost of trunk infrastructure identified in
a LGIP; or (c) is not subject to any declaratory, injunctive or other order of
the Supreme Court, another court, a tribunal or another entity
(ii) the cost of infrastructure decided using the method
on any ground.
included in the local government’s charges resolution.
231 Rules of the P&E Court
229 Notice of appeal
(1) A person who is appealing to the P&E Court must comply with the
(1) An appellant starts an appeal by lodging, with the registrar of the
rules of the court that apply to the appeal.
tribunal or P&E Court, a notice of appeal that-
(2) However, the P&E Court may hear and decide an appeal even if
(a) is in the approved form; and
the person has not complied with the rules of the P&E Court.
(b) succinctly states the grounds of the appeal.
(2) The notice of appeal must be accompanied by the required fee.
Document Set ID: 24280125