Extension to Currency Period - Approved DBW23/0084.01 (As Published)

of 5

Page text shows just the words. Original shows the document exactly as it was published.

                        Geotechnical stability – structures in landslide hazard area
                6.      All works must be carried out in accordance with a Geotechnical Report for the site
                        prepared by a qualified person*. Certification must be submitted to Council from a
                        qualified person* which certifies that the site is not at risk from landslide emanating from
                        the site or from other land.
                        Effluent Disposal
                7.      The dwelling and secondary dwelling must be provided with an on-site waste water
                        treatment and effluent disposal system having a capacity sufficient for the use.
                        Water Supply
                8.      The development must be provided with a potable water supply, a minimum capacity of
                        45,000 litres of water.
                        Stormwater Drainage
                9.      Stormwater runoff from the development must be disposed of on-site without causing
                        scour or damage to the subject site or any adjoining property.
                        Earthworks
                10.     All earthworks and associated batters must be contained entirely within the subject site
                        unless written permission from the respective landowner(s) is provided to Council. All
                        earthworks must be undertaken in accordance with the provisions of Australian Standard
                        AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
                        Damage to Services and Assets
                11.     Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                        or
                        b. where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                5.      REFERRAL AGENCIES

                Not applicable.
                6.      ADVISORY NOTES

                The following notes are included for guidance and information purposes only and do not form
                part of the assessment manager conditions:
                        Infrastructure Charges
                1.      All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
                        Resolution” made pursuant to the planning legislation and regulations current at the time
                        of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
                        development/development-tools-guidelines/infrastructure-charges
                        Qualified Person
                2.      For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
                        stability for the development, a qualified person is considered to be a person who:
                        a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                        b.      has a degree in civil engineering or engineering geology; and




Document Set ID: 24280125
Version: 11, Version Date: 07/11/2025                                                                      Page 3 of 5
Log in to download the original file

Extension to Currency Period - Approved DBW23_0084.01 (As Published).pdf · 146 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.