Council archive · source document
26281_OW1 to SW1_Issue 9 · OPW19/0278.01
Attached to the e-mail Operational Works Minor Change Application OPW19/0278.01.
BM: NAIL IN KERB
RL: 1.600
43
1. 47
57
1. .40
1. .35
57
5
58 4
61
1.
51 .5
1. 1.4
48
54
1.
1.
1.
1
1
1. 1
PP PP
59
1.
55
54
56
50
54
1.
1.
1.
1.
1.
40
55
WM
1.
1.
WM
66
54
1.
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10 2
4 2 STOREY
7
1. BRICK UNITS
35.46
2 GTP395
59
67
630m²
1.
1.
6.09
72
3
66
1.
77
1.
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
50
47
65
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LEGEND CONSTRUCTION NOTES
GENERAL:
. AD 1. DO NOT SCALE FROM THIS DRAWING.
X 2. ALL DIMENSIONS IN MILLIMETRES
EXISTING SURFACE SPOT LEVELS. 3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS.
4, ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL
— SLT— SILT RETENTION FENCE 10 DETAIL DRAWINGS ARE TO BE REFERRED TO THE ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
LOTS 2 & 3 ON RP 78252 —— E ——_. INDICATES OVERHEAD ELECTRICITY WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE
i Level Datum AHD SUPPLY LINE DIAGRAM,
Level Origin PM 56277, RL 1.635m FOOTPATHS AND DRIVEWAYS:
N 9 INDICATES EXISTING SEWER LINE 1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
| | W INDICATES WATER MAIN APPROX RAMEN, Pe CAMPING BE 125mm THK. EXCLUDING ANY FINISHED
4. CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
ALIGNMENT, BUILDER TO CONFIRM 5. CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
EXACT LOCATION PRIOR TO WORKS 6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH.
7. EXPANSION JOINTS TO BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH
WIRE CUT ALONG JOINT.
— sw/ex —————_ INDICATES EXISTING STORMWATER 8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
DRAIN 9. FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF
CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR 10
WORK COMMENCING
FILLING NOTES:
—THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE IS TO BE ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%. THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
CREATE BUNDING IN TEMPORARY BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
80-120 AGGREGATE FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
(NO FINES) H ARD STAND SE eENCES FOR DIVERISION INTO COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING
, , ENGINEERS FOR APPROVAL.
OVERLAY FOR DELIVERY S — THE FILL MATERIAL CLEAN GRANULAR MATERIAL (IE. SAND TO A
DURING CONSTRUCTION. CLAYEY SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE
Ot oe 2 Me 4 _ KERB b a PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
\') PP : oN x PRO py " ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
E E ae me 5 e E PH oe ~ THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
ee . eC NS & ‘ “ AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1
w Sw w w w yf w Sw Wo w w CERTIFICATION WITH A MINIMUM RELATIVE FIELD DENSITY OF 95%
be R.P. BOU COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
_—_- So eS i se = si ale =o Si - CONSULTING ENGINEERS FOR APPROVAL.
| t KS ni 4 — FILLING AND COMPACTING ADJACENT EXISITING STRUCTURES IS TO BE
IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND
| SPECIFCATIONS.
FA \ | a COMMON — AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
| | — | BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN
| : oT ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE
& | | \ [ps - FIELD DENSITY OF 95%
S|] 4 — ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE
9252 s \ | PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
a II l FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
g-'4 "\ 5 ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%.
ae | | ‘ 2 — SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED
i x |! PRIOR TO CONSTRUCTION COMMENCING,
| | Ss | 2ST
i| \2 Ni BRIC
te oO
| < >, ° FALL SITE TOWARDS I
u 1 & \t—SILT FENCES AT 5!
oo of } 2. © \& FRont OF STF B—_«GTP395
6lo9 630m 2 “ |
a 6 'e <3 st
| 3 1 \ 42m? | '
SHED i a ie 900(W) GEO-FABRIC SILT SILT_ RETENTION
| a! als FENCE, FIXED TO SPIKES AND» THE CONTRACTOR IS TO INSTALL APPROVED SILT
iL >< ie BURIED 300 INTO STABLE 8 RETENTION FENCES PRIOR TO COMMENCING ANY
zZ ! l = GROUND. EARTHWORKS. THE FENCE IS TO BE CONSTRUCTED
i| & ie GTP1ht ALONG THE LOWEST BOUNDARY AND RETURNED UP
‘ 1 Oo
EXISTING SEWER CONNECTION a a SIDE BOUNDARIES TO ENSURE FULL STORMWATER
| © POINT TO BE DECOMMISIGNED To 12 bie: ENTRAPMENT, SURFACE RUNOFF FROM WITHIN THE
. Qa 2
| % UNITY-WATER STANDARDS AND 10,2 Z| ~ ALLLOTMENT MUST DRAIN TOWARDS THE FENCE AND
iL DEVELOPERS EXPENSE. [a | SHALL NOT ENTER NIEGHBOURING ALLOTMENTS
Y z 1200(L) 50 SQ. HDWD THROUGH THE USE OF SURFACE BUNDING OR
a ‘| [| SPIKES, 1800 CTRS DRIVE SCOUR PROTECTED DRAINS. THE FENCE MUST
—_* | | 600 INTO GROUND. REMAIN IN PLACE UNTIL SUCH TIME THAT FINISHED
| EX. SCP | i CP LANDSCAPING AND DRAINAGE MEASURES ARE
f° + his INSTALLED
ee | ee oe
& Tm 6 SILT FENCE DETAIL
EX. SCP .
2 STOREY 6
GTF
SINGLE STOREY 4 | RP72986 BLOCK & H'PLANK |
SITE PLAN — SILT & SEDIMENT EROSION CONTROL
Scale 1: 200 B NOTES REVISED 10.02.20
A AMENDED FOR NEW ARCHITECTURALS | 09.04.17
Revision Description Date
CONTRACTOR 70 LOCATE ALL SERVICES PRIOR 10 Issue:
COMMENCING WORKS ON SITE. ALL SERVICES ARE
1 Se PROTEED WN AOLIRONCE WI QUST MOBLISATION FROM MAD_ACTON FOR APPROVAL
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE DO NOT SCALE FROM THIS DRAWING
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE KEY The design ond associated details contained on this ond associated
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR a conv car et be ued enced
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF ir al NING STORMWATER MANHOLE /T
STOCKPILES RC. HW, REINFORCED CONCRETE HEADWALL aS SCG Unit 1/11 Project Ave,
EX. SMH EXISTING SEWER MANHOLE
MAINTENANCE OF SILT PROTECTION EX. SWMH EXISTING STORMWATER MANHOLE g onatsonnQsegergreescon
SITE DRAINAGE - CONSTRUCTION SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT SWMH NEW 1050 STORMWATER MANHOLE : web:www.scg-engineers.com
ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS E san acme aes
TOWARDS THE CENTRE OF THE ALLOTMENT THEN TOWARDS PROTECTION MEASURES THROUGHOUT THE DURATION OF an one eee + OAM :
THE FRONT BOUNDARY WHERE RUNOFF WILL DRAIN THROUGH THE PROJECT. ANY BREACHING OF THE PROTECTION NSL NATURAL SURFACE LEVEL Title:
THE SILT FENCES, IN NO INSTANCE SHALL THE ALLOTMENT MEASURES MUST BE REMEDIATED IMMEDIATELY AND ra ORE HYDRANT OPERATIONAL WORKS:
DRAIN INTO NEIGHBOURING ALLOTMENTS. H. :
REPORTED TO THE ENGINEER FOR CORRECTION MEASURES. TP TELSTRA PIT
5 . SILT RUNOFF PROTECTION IS TO BE MAINTAINED UNTIL EP. ELECTRICAL POWER POLE SILT & SEDIMENT CONTROL
www.dialbeforeyoudig.com.au SUCH POINT THAT LANDSCAPING IS COMPLETED AND NOT KERB _EXISTING KERBING Project
SITE DRAINAGE - CONSTRUCTION SUSCEPTABLE TO STORMWATER SCOUR.
41 0 0 CONSTRUCTED STORM WATER PITS WITHIN THE SITE ARE TO Lots 2 & 3 RP/8252
BE COVERED UNTIL THE SITE IS COMPLETED OR TO BE
DIAL FITTED WTH SILT PROTECTION MEASURES TO THE APPROVAL Elizabeth St, NOOSAVILLE
OF THE ENGINEER ’
BEFORE YOU DIG Date: Nov 16. Drawn CSK
0 1 2 3 4 5 ; Checked: Drg No. Rev
m1:100 @ Al &
many —1"7"500 @ AS | Sketetten NV 26281-OW2 | B.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
26281_OW1 to SW1_Issue 9.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.