                                             Officer:          Tracy Jones
                                             Direct Telephone: (07) 5449 5228
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2008/587
                                             Your Reference:   080216T
8 July 2008

Morgan & Beiers
CARE Ken Hicks & Associates
PO Box 6380
MAROOCHYDORE BC QLD 4558




Dear Sir/Madam

                                      Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 7 July 2008 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:
1        APPLICATION DETAILS

    Application No:                  2008/587
    Street address:                  247 David Low Way, Peregian Beach, 249 David Low Way,
                                     Peregian Beach & 253 David Low Way, Peregian Beach
    Real property description:       Lot 1 RP 903222, Lot 26 P 9315 & Lot 2 RP 903222
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
       Development Permit for Material Change of Use - Commercial Business Type 2 - Medical

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Land Use
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are numbered, titled and dated:
          Plan         /     Rev.    Plan / Document Name                              Date
          Document No.
          SD02               F       Basement/Site Plan – Ken Down Architects          20.08.07


                                                                                        Page 1 of 22
Full text of the other 21 pages

Page 2

                                                                                         2008/587



      SD03                 H        Ground Floor – Ken Down Architects              20.08.07
      SD04                 B        First Floor – Ken Down Architects               20.08.07
      SD05                 C        Elevations – Ken Down Architects                20.08.07
      SD06                 C        Elevations – Ken Down Architects                20.08.07
      SD07                 C        Sections – Ken Down Architects                  20.08.07
      SD15                 A        Roof Plan – Ken Down Architects                 03.08.07

      and as may be amended by these conditions.
2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use.
4.    The open space and setback areas are to be landscaped in accordance with Council’s
      Landscape Code and Policy on Landscaping Plants and Guidelines and a properly prepared
      Landscape Plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such
      landscaping is to be completed prior to the premises being occupied and maintained at all
      times thereafter. These landscape plans required to be submitted are to denote areas of
      4.1.   existing vegetation or existing trees proposed or required to be retained on-site and in
             the road reserve in accordance with Ground Floor plan SD03 Revision H;
      4.2.   provision for planting of one native canopy tree every 6 car parking spaces within the
             car parking area located at ground floor level;
      4.3.   dense screen planting along the southern rear boundary of the site to protect the
             amenity of the adjoining residential property;
      4.4.   dense planting within the eastern front setback, particularly adjacent to the areas in
             between the buildings;
5.    Secure bicycle racks shall be provided on site to accommodate a minimum of 23 bicycles.
      The proposed bicycle racks shall be located both at ground floor level and within the basement
      to the reasonable satisfaction of the Manager, Land Use.
6.    End of trip facilities shall be provided within the approved building at a minimum rate of 1
      locker per 2 bicycle parking spaces (ie. 12); 1 shower per 10 bicycle parking spaces or part
      thereof (ie. 3); and change rooms with facilities either unisex or both male and female facilities
      are provided.
7.    Any advertising sign or device is to comply with Council's policies on advertising.
8.    The proposed use shall not operate outside the hours of 8am and 6pm Monday to Saturday,
      excluding public holidays.
9.    The proposed development shall not exceed a maximum height of 2 storeys and 8 metres
      above natural and finished ground level.
10.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height as required by either the conditions of approval or the Planning
      Scheme.
11.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.


                                                                                      Page 2 of 22

Page 3

                                                                                       2008/587



12.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).
13.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational Works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
15.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
16.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 7 July 2012, unless an application to extend the currency is approved by
      Council.
17.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Lot Amalgamation
18.   All separate, adjoining lots that form part of this application shall be amalgamated into one
      undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act and the
      Plan of Survey submitted for registration at the Land Titles Office. Proof of title being issued
      for the amalgamated lot shall be submitted to Council prior to the issue of the Development
      Permit for Operational Works.
Vehicle Access
19.   A vehicular access driveway to serve the development shall be constructed from the David
      Low Way frontage of the site with a maximum width of 6.0m. The “slip lane” in David Low Way
      at the entrance to the site as shown on drawing number 2243 SD03 G dated 6/7/07 prepared
      by Ken Down Architects shall be deleted.
20.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
21.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS2890.1, section 3.2.4. The applicant shall
      demonstrate compliance by illustrating these sight lines on the plans submitted for both
      Operational Works approval and Building Works approval.
22.   All vehicles shall enter and leave the site in a forward direction.


                                                                                    Page 3 of 22

Page 4

                                                                                         2008/587



Car Parking
23.   Carparking shall be provided within the site generally as shown on Basement/Site Plan SD02
      Revision F and Ground Floor SD03 Revision H dated 20 September 2007 as prepared by Ken
      Down Architects, except as modified herein.
24.   Car parking areas on-site shall be designed to comply with the provisions of AS/NZS 2890.1-
      2004 including:-
      24.1.   a minimum of 50 spaces to be designated in the following manner:-
              24.1.1.   a minimum of 48 spaces designated for car parking including:-
                   24.1.1.1. a maximum of 18 spaces for staff parking (user class 1);
                   24.1.1.2. a minimum of 29 spaces for customer parking (user class 3);
                   24.1.1.3. a minimum of 1 space designated for disabled parking (user class 4) to
                             be located at the ground floor level;
              24.1.2.   a minimum of the equivalent of 2 car park spaces for motorcycle and motor
                        scooter parking, to accommodate a minimum of 5 spaces;
      24.2.   all client/visitor spaces with allowance for vehicles to enter and leave the site in a
              forward gear and with a minimum head clearance (headroom) at any point of 2.2m.
      24.3.   all disabled car spaces shall be designed with allowance for vehicles to enter and
              leave the site in a forward gear and with a minimum head clearance (headroom) at any
              point of 2.3m.
25.   The proposed turning area at the end of the aisle that serves proposed carpark spaces 25 to
      34 shall be line-marked with chevrons and have the words “No Parking” painted on the
      pavement. A sign shall also be provided to indicate that the area is a “Turning Area Only” and
      that “No Parking is Permitted”.
26.   An additional turning area shall be provided in the location of proposed carspace 21 as shown
      on drawing number 2243 SD02 E dated 3/7/07 as prepared by Ken Down Architects. The
      turning bay shall be line-marked with chevrons and have the words “No Parking” painted on
      the pavement. A sign shall also be provided to indicate that the area is a “Turning Area Only”
      and that “No Parking is Permitted”.
27.   Additional safety measures shall be placed on and adjacent to the access ramp to the
      basement carparking area. The measures shall be generally in accordance with the
      recommendations of the report prepared by Burchill VDM Job No:C3694, Report No:4530-0
      dated July 2007. In additional to the measures recommended in the report the applicant shall
      construct a small median, minimum of 200mm wide and 150mm high, on the ramp to provide
      a physical barrier to prevent vehicles straying onto the wrong side of the ramp.
28.   All carparking shall be kept, maintained and line-marked in a condition fit for use.
29.   All staff carpark spaces shall be clearly defined by line marking each space with the words
      “Staff Parking Only” and by sign posting each space with a similar wording.
30.   All disabled carpark spaces shall be clearly defined by line marking each space with the words
      “Disabled Parking Only” and by sign posting each space with a similar wording.




                                                                                      Page 4 of 22

Page 5

                                                                                           2008/587



Roadworks Widening
31.   The full length of the David Low Way frontage of the development site shall be upgraded by
      providing kerb & channel, bitumen road widening and landscaping improvements to the
      footpath. These works are to be undertaken by the applicant at no cost to Council unless the
      nominated works have been previously undertaken by Council as part of their improvements
      to David Low Way. The alignment of all new kerb and channel shall be as directed by
      Council’s Manager Works Planning. All associated and ancillary work including pavement
      correction to the existing pavement, drainage works, modification of the footpath, and
      adjustments to the existing infrastructure shall be undertaken to complete the roadworks
      widening.
      In this regard a schedule of works, specifications and plans detailing this work shall be
      prepared and submitted to Council for approval prior to obtaining a Development Permit for
      Operational Works.

Frontage Works
32.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      David Low Way frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
33.   A new 2.0m wide concrete path shall be constructed along the David Low Way frontage of the
      site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services.
34.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
35.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
36.   Roof runoff from any new building shall be directed to a rainwater storage system or tank
                                                                 2
      (minimum storage the greater of 5000 litres or 15 litres/m of roof area) that is installed to
      ensure water from the tank is used for external uses (such as watering gardens, irrigation,
      ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the building. All rainwater tanks are to be designed and installed in accordance
      with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
      of the plumbing application in conjunction with the building approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the stormwater drainage
      system.
37.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. The runoff from the site shall be controlled via a combination of retention, detention, on
      site infiltration and gravity drainage lines. Stormwater drainage permitted to drain from the site
      shall be discharged to Council’s existing drainage structures located in the adjoining property
      to the north (Lot 95 SP137431).
38.   The design of the stormwater drainage system for the site shall be prepared by a suitably
      qualified Registered Professional Engineer. The design shall include but not be limited to:
      38.1.   The design of any required on site infiltration system to be of sufficient size to cater for
              a Q100 rainfall event for the catchment area draining to the on site infiltration system.

                                                                                       Page 5 of 22

Page 6

                                                                                         2008/587



      38.2.   A report prepared by a suitably qualified geotechnical engineer to determine if the
              existing site conditions can cater for the expected infiltration should it be proposed;
      38.3.   The determination of the capacity of the existing Council stormwater system to ensure
              that the subject site does not overload the system;
      38.4.   The design of the drainage system for the site to include backflow protection features;
39.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
      being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor.

      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
40.   All site stormwater drainage shall be by means of a gravity system. No mechanical features
      are to be used to dispose of stormwater.
Sewer Mains
41.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
42.   The existing sewer main that is located in south-western and north-western corners of the site
      and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the
      invert of the sewer main to the finished surface level) shall be accurately located and
      determined by a licensed Surveyor and shown on all plans submitted for Operational Works
      approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, retaining walls
      exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’
      or within 1.5m of the centreline of the sewer main, whichever is the greater. As such the
      applicant shall amend Operational Works plans including Building plans to ensure compliance.
43.   The existing sewer located in the northwest corner of existing lot 1RP903222 (No. 249) and
      along and within the western boundary of existing lot 26P9315 (No. 253) shall be removed and
      a new 150mm dia. sewer house connection branch constructed out of the existing manhole
      MP20/14/01 (located outside and adjacent to northern boundary of lot 26) to serve the
      proposed development.
      All works to be carried out to the standards and requirements of Council at the applicant’s
      cost.
44.   The applicant’s shall demonstrate that the new sewer house connection branch referred to in
      the above condition fully serves the proposed development in accordance with Council’s
      Planning Scheme Policy PSP06 and the Plumbing Code.


                                                                                      Page 6 of 22

Page 7

                                                                                         2008/587



45.   The existing sewer manhole located in the south-west corner of existing lot 2RP903222 (No.
      247) to be removed and existing sewer located along and within the western boundary of
      adjacent Lot 22P9315 (No. 247) to be abandoned. Consent of adjacent property owners to
      carry out any necessary works to abandon sewer required prior to issue of any Decision
      Notice in respect to Operational Works. All works to be carried out to the standards and
      requirements of Council at applicant’s cost.
Town Water Supply
46.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
47.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
48.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
49.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
      shall be served by:
      49.1.   A single Body Corporate water meter to measure the total water consumption
              (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
      49.2.   Individual water meters to each tenement capable of being separately rated, and
      49.3.   A fire service (fully testable single detector check with metered bypass), where
              applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
              reels).
50.   The applicant is advised that this development may require the provision of fire hydrants and a
      booster pump in accordance with the Building Code of Australia, and consultation may also be
      needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
      provided. To this end any necessary fire hydrants shall be clearly shown on the plans
      submitted for both Operational Works and Building Works approval and if a booster pump is
      deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
      order to provide boosting to the water supply.
Service Easements (Sewer / Stormwater)
51.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works / Building Works approval. To this extent the surveyor shall certify that
      the sewer and the zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.
                                                                                      Page 7 of 22

Page 8

                                                                                          2008/587



52.   The applicants to create a private easement for drainage within the adjoining property to the
      north (Lot 95 SP137431) to enable connection to Council’s existing infrastructure. The
      easement is to be centrally located over the pipework with a minimum width of 1.5m or be of
      sufficient width to ensure that all associated pits and pipes are wholly contained within the
      easement. The terms of the easement shall include the responsibilities on the beneficiaries of
      the easement to maintain the drainage system so as to be operational at all times. In this
      regard the applicant shall provide a letter of authority from the adjoining property owner
      granting the easement prior to the issue of any Development Permit for Operational Works.
53.   No building or other structure shall be constructed or encroach over an easement.
Earthworks
54.   Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
      Engineering Design Standards Manual and so as not to cause the additional ponding of water
      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
55.   Excavation of the site and the construction of the proposed works shall not have any adverse
      affects on the stability of adjoining buildings and/or structures and/or services and/or lands. In
      this regard a Registered Professional Engineer Queensland shall supervise the excavation of
      the site and the construction of the new works to determine whether any additional measures
      are required to protect the stability of adjoining buildings and/or structures and/or services
      and/or lands.
56.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences that border the development site. Fences that are affected shall be replaced prior to
      the Building Certifier issuing the Certificate of Classification. In this regard any fences to be
      replaced shall be clearly shown on the plans submitted for Operational Works approval.
57.   The use of vibratory equipment of any kind is not permitted to be used (including vibrating
      rollers and the use of vibrating installation techniques for sheet piling and other construction
      vibrations caused by excavating, earthmoving or demolition machinery or other similar
      construction techniques) unless approved and supervised by a Certified Geotechnical
      Engineer. Under such circumstances the operator of such equipment shall at all times comply
      with the directions of the Geotechnical engineer and the reasonable and lawful directions of
      Council officers.
      The proposed use of such equipment shall be detailed in any application for a Development
      Permit for Operational Works.
58.   Certification of the completed works must be provided to Council by the supervising engineer.
      The certification shall state that the completed works, including any on site infiltration, conform
      with all aspects of the design and that the completed works will not have any adverse affects
      on the stability of adjoining buildings and/or structures and/or services and/or lands.
Site Stability
59.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures and/or land, and make recommendations on
      the type of foundation system(s) best suited for the proposed development. The
      recommendations of this report shall be incorporated into the design and construction of the
      proposed development.
60.   Should the recommendations of the geotechnical report require any part of the works
      (including excavation, retaining structures, tie backs etc) to be temporarily or permanently
      constructed within any adjoining property a letter of authority from the adjoining property
      owner shall be submitted to Council prior to the issue of operational works approval.




                                                                                      Page 8 of 22

Page 9

                                                                                        2008/587



Construction Issues
61.   A Construction Management Plan (including a Traffic Management Plan) addressing all
      construction phases shall be prepared by suitably qualified persons in consultation with the
      Peregian Beach Business Association and submitted to Council for approval prior to obtaining
      a Development Permit for Operational Works. The report should aim to address every
      foreseeable problem that is likely to occur during the construction process and include
      recommendation on how these can be overcome or minimised and shall also address parking
      for construction workers.
      To ensure construction is undertaken appropriately, the Construction Management Plan shall
      also include a section written by a Geotechnical engineer addressing the excavation and
      surrounding site support systems.
62.   A Condition Survey is to be carried out on adjoining buildings, structures and services prior to
      any excavation or construction works taking place on site. If distress already exists, a
      photographic survey shall be undertaken, the distress measured and a plan to monitor
      changes to distress shall be implemented. A copy of this report is to be submitted to Council
      within 5 business days of the survey and prior to construction work proceeding.
      This report will be held by Council until all work is completed and will be used for verification
      purpose and to ensure that all buildings, structures and services are left in at least the same
      state as before construction commenced.
Erosion and Sediment Control
63.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

Contributions Towards Council Infrastructure
64.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

       Contribution Required For:                                                     Amount:
       PSP12 – Public Open Space Contributions (Park)                                 $2,174
       PSP16 – Sewerage Headworks Contributions                                       $79,498
       PSP17 – Water Supply Headworks Contributions                                   $51,438
       PSP20 – Pathway Trunk Network Contributions                                    $2,196

       TOTAL Contribution Amount =                                                    $ 135,306

       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from March 2008 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.



                                                                                     Page 9 of 22

Page 10

                                                                                        2008/587



      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.

      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the trading bank guarantee will be returned.

General
65.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      To avoid conflict with underground pipes or services, all existing and proposed services
      required by the development shall be shown on the plans.
66.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
67.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Environmental Health
68.   The developer must provide waste storage and disposal facilities in accordance with Planning
      Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, including an external imperviously paved area correctly sized for all refuse and
      recycling containers and suitably screened from public places and neighbouring properties. A
      bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via
      a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage
      system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide
      (max 0.5m²), or alternatively the waste area can be roofed, or any other design approved by
      Council.
69.   Street litterbins to a design approved by Council’s Environmental Health Section, shall be
      supplied and installed at the developers expense at agreed locations, as well as Buttout Bins.
      Prior approval is required from Council’s Vector Control Officer by contacting 5449 5232.
70.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
      “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
      submitted for the day-to-day operation of the development and approved by Council’s Health
      Section prior to issue of development permit for operational works.
      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
      explaining exactly how to predict waste quantities and design waste areas is available from
      Council and the web. The Plan shall include the following information: -
          The types of waste that will be generated from the activities approved within the
           development.
          Estimated volumes or tonnage of both recyclables and waste generated.
          Methods to be used for dealing with garden waste.
          Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.


                                                                                   Page 10 of 22

Page 11

                                                                                           2008/587



             Description of procedures for getting all waste to the bins; the storage of bins and the
              collection of bins by the contractor.
             A description of the design details of waste storage and recycling areas including size,
              location, elevation and floor plan, methods of bin washing and system to prevent storm
              water getting into sewer via the bin wash.
             A description of types and volume of waste storage containers to be used.
             The waste and recycling storage area shall include the provision of containers for all
              waste and recycling materials including putresable matter, non-recycling waste, paper/
              cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing
              facilities connected to sewer.
             A detailed description of vehicular access to collect waste. Where collection is off street,
              access must allow vehicles to enter and leave the site in a forward direction.
71.   A Waste Management Plan (construction and demolition) shall be submitted prior to
      demolition, removal or relocation of any building other than a shed.
      A Waste Management Plan (construction and demolition) is also required for construction of
      15 or more dwelling units or for any business use of greater than 500m².

      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code)

      The Plan shall contain the following information:
             The site area for the storage and separation of waste is to be shown on the plan
              drawings accompanying the application.
             A waste management table as indicated below is to be completed showing how waste
              material is to be segregated - recycled – reused or disposed.
          MATERIALS ON-SITE                 DESTINATION
                                            Re-use and Recycling                       Disposal
          Expected     waste   Estimated    On-site            Off-site                *specify
          materials            volume       *specify proposed *specify                 contractor    and
                               (m³)         re-use or on-site contractor      and      landfill site or
                                            recycling          recycling outlet        other     disposal
                                            methods                                    site
          Excavation
          material
          Green waste
          Bricks
          Concrete
          Timber-please
          specify
          Plasterboard
          Metals - please
          specify
          Asbestos
          Other - please
          specify

                                                                                       Page 11 of 22

Page 12

                                                                                      2008/587



      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.
72.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
      pumps etc) shall comply with the following requirements:
      The equipment shall be installed and located in a manner that prevents excessive noise in
      accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
      the-spot fines) may apply for offences.

      A person must not use equipment on any day if it makes or causes noise to be made –

      From 10pm to 7am: More than the lower of either –
             40 dB(A)
             3 dB(A) above the background noise level
             No audible noise for pool pumps apply during these hours.
                    From 7am to 7pm: More than the lower of either –
             50 dB(A)
             5 dB(A) above the background noise level
              From 7pm to 10pm: More than 3 dB(A) above the background noise level.
73.   Submission of written certification from a suitably qualified person confirming that the noise
      levels from all mechanical equipment comply when measured at either the residential
      boundary or outside the most exposed part of an affected building, whichever is the closest to
      the equipment.
      The assessment and certification is required immediately after installation of the equipment
      and prior to any occupation of the building, and in a format approved by Council. This
      assessment must take into account noise from any other fixed equipment on the property e.g.
      swimming pool pump, heating/cooling equipment, etc that may increase the overall noise level
      emitted.

      Advice: It is highly recommended that the person you engage to certify the installation is
      involved at the plan development stage so they can recommend where this equipment is best
      located. They can also advise about noise enclosures and can make other suggestions to
      avoid noise problems. It is a lot more costly to try and deal with noise problems after
      everything is built.
74.   An acoustic report prepared by a registered professional Acoustic Consultant shall be
      submitted and approved prior to the issue of a development approval for operational works.
      The acoustic report shall assess all potential noise sources and demonstrate how the
      development will not cause –
      74.1.     Excessive noise under Council’s Local Law No. 12 – Control of Nuisances.
      74.2.     Unlawful environmental nuisance under the Environmental Protection Regulation
               1998.
      NB: In particular, the noise from the cars on the ramp entering and leaving the underneath
      parking.

                                                                                 Page 12 of 22

Page 13

                                                                                              2008/587



5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency         Referral Address

 Area management               Concurrence       Environmental           GPO Box 2771
 advice given for                                Protection Agency       BRISBANE QLD 4001
 unexploded ordnance                             Contaminated Land
                                                 Unit

A copy of any referral agency conditions is attached.
6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date
 SD02                      F        Basement/Site    Plan     –   Ken   Down   20.08.07
                                    Architects
 SD03                      H        Ground Floor – Ken Down Architects         20.08.07
 SD04                      B        First Floor – Ken Down Architects          20.08.07
 SD05                      C        Elevations – Ken Down Architects           20.08.07
 SD06                      C        Elevations – Ken Down Architects           20.08.07
 SD07                      C        Sections – Ken Down Architects             20.08.07
 SD15                      A        Roof Plan – Ken Down Architects            03.08.07

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Land Development
1.    The applicant is advised that development contributions and infrastructure charges applicable
      to this development approval have been based on the following Uses Class/ Uses and
      applicable quantities:-

                    Existing Development                            Approved Development
        Existing Use Class                                  Approved Use Class
                                   Existing Quantity                              Approved Quantity
               / Use                                              / Use
                                                                                          2
                                                            Commercial Business   992m Use Area for
        Detached House            1 Dwelling
                                                            – Type 2 – Medical    19 Consulting rooms

2.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $136,280 and is subject to variations in the
      Consumer Price Index, All Groups Brisbane from MARCH 2008 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.


                                                                                      Page 13 of 22

Page 14

                                                                                           2008/587



3.    The applicant is informed that payment via credit card transaction will not be an acceptable
      method of payment for development contributions conditioned in this permit or for
      infrastructure charge notices issued separately.
4.    Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational
      Works in respect of roadworks and stormwater drainage works. In this regard a DXF/DWG file
      on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with
      any application for Operational Works. The design shall be in accordance with Council’s
      Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and
      Earthworks.
5.    To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
6.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
7.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
8.    The plans for the proposed building work have not been assessed for compliance with the
      requirements of the Building Code of Australia as they relate to people with disabilities. Your
      attention is drawn to the matter that either or both the Disability Discrimination Act 1992
      (commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the
      proposed building work.
      Noosa Council recommends that the following matters be considered to address equitable
      access and facilities in the building:-

         a.   The building and environs should be designed to meet the requirements of the Human
              Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises”
              and AS1428.2;

         b. Applicants should be aware that a “Disability Standard on Access to Premises is being
            developed and most likely will result in changes to the Building Code of Australia;

         c.   Any services and facilities in the building complex must allow independent, dignified
              and equitable use of the services and facilities for all people.

9.    This proposal has not been assessed in relation to the spread of fire between properties /
      buildings. It is the building certifiers responsibility to assess the requirements for fire services,
      fire separation and appropriate methods of construction as part of the building works approval
      process. Referral to the Queensland Fire and Rescue Service (QFRS) may be required as
      part of the Building Approval process.
10.   Ventilation to the carpark level will need to comply with Building Code of Australia F.4.11.
11.   The development should be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
      other emissions in accordance with the nuisance provisions of the Environmental Protection
      Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
                                                                                       Page 14 of 22

Page 15

                                                                                            2008/587



12.   Noise from building works associated with commercial and or industrial development should
      comply with the following –
      12.1.   Limited to between 7:00am to 6:30pm Monday to Saturday.
      12.2.   All reasonable measures are taken to minimise noise emissions.
      12.3.   Not permitted on Sunday or public holidays.
13.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Development Permit for Building Works          All Building Works

 Development      Permit   for   Operational    Landscaping, Access and/or Carparking, Site Civil
 Works                                          Works, Roadworks, Stormwater Drainage, Frontage
                                                Works, Sewer Reticulation (including New Mains,
                                                Relocations, Diversions, Pump Stations and Rising
                                                Mains) and Erosion and Sediment Control

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code

12    SUBMISSIONS
There were no properly made submissions about the application.


                                                                                       Page 15 of 22

Page 16

                                                                                      2008/587



13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,




Tracy Jones
SENIOR PLANNING OFFICER




                                                                                  Page 16 of 22

Page 17

                                         2008/587



Referral Agency Conditions                           –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                     Page 17 of 22

Page 18

    2008/587




Page 18 of 22


[OCR of page images]
2008/587

 

5 IDAS C-6

Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone
should only proceed following the conduct of UXO investigation and clearance activities. Defence
maintains a list of commercial UXO investigation and remedial search contractors that it accredits to
carry out this work.

Defence also recommends that owners or occupiers of potentially affected land and workers and
contractors employed on the land need to be aware of the procedure if a suspect object is found.

As the EPA has a record of only a particular portion of the site, ie. Lot 26 on P9315, being further
investigated and remediated, it is considered that there remains a possibility of UXO being found on
the balance part, ie. Lots 1 and 2 RP903222.

4 Conditions
The following concurrence agency conditions are to be attached to any approval:

4.1 Prior to the commencement of any development-related excavation, earthworks or soil
disturbance on the balance part of the site which has not yet been remediated, that part is to
be subjected to investigation and, where necessary, appropriate remedial action.

42 Any person employed to work on any part of the site where Condition 4.1 has not been
satisfied is to be forewarned in writing by the applicant.

This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its location.

Advise the Police as soon as possible.

43 Following investigation and any remedial action taken to satisfy Condition 4.1 above, the
applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for
assessment. The EPA is to subsequently advise the Sunshine Coast Regional Council and
the applicant of its assessment in regard to Condition 4.1 being satisfied.

4.4 No gravel, rock, sand or soil is to be removed from the balance part of site without written
EPA approval.

4.5 The applicant is to advise the owner and any occupier of the site of the above responsibilities.

5 Additional comments or advice

Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence
website http://www.defence.gov.au/uxo/ for the details of current UXO investigation and remedial
search contractors. The EPA accepts reports based on investigative and remedial work carried out
by these contractors.

Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search
programs with detection equipment unless the use of such equipment is:

VER 2

Page 18 of 22

Page 19

    2008/587




Page 19 of 22


[OCR of page images]
2008/587

 

5 IDAS C-6

« considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any filling proposed as part of the development program; or

© prevented or made impracticable by the presence of a structure, stockpile, natural barrier or
metal waste.

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the risk of exposure to any UXO that may exist is reduced by the presence of a
structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
risk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of preliminary works,
there is evidence then available to the UXO contractor that any residual risk is negligible, the use of
detection equipment will typically be required to confirm the site’s status.

Where investigation, along with any subsequent remedial action and assessment, is to be
implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investi gation/remediation is most likely to be applicable where development of smaller, built-on lots
{which can present circumstances such as those discussed above) or broadhectare sites is proposed. In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion
comprising the development stage, as being remediated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further
investigated will retain the risk assessment made by Defence and the EPA’s Area Management Advice
will continue to apply. This is unless evidence obtained from the investigated part/s can be used to
refute Defence’s assessment in regard to all or part of the balance. In the latter case, the EPA may
teassess all of the balance or the applicable part/s as being unaffected by UXO.

6 Additional information

This concurrence response applies only to contaminated land issues and does not remove the need to
obtain any further approval for this development which may be required by this or other legislation,
State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities.
Applicants should also comply with all relevant legislation.

The EPA has not provided a notification to native title parties for this application. The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It is recommended that the Assessment
Manager determines whether native title notification is required for this application.

*End of response*
IDAS C-6 CLM

VER2

Page 19 of 22

Page 20

    2008/587




Page 20 of 22


[OCR of page images]
22 J0 0g abe

UNEXPLODED ORDNANCE (UXO) CONTRACTORS

Department of Defence accredited UXO investigation and remedial search contractors are listed below.
The Environmental Protection Agency (QLD) accepts reports based on investigative and remedial work carried out by these contractors.

 

 

BACTEC South East Asia Pty Ltd

Managing Director:
Timothy Pippett

Unit 1, 43 Stanley Street
PEAKHURST NSW 2210

Tel: (02) 9584 7500
Mobile: 0412 663 541
Fax: (02) 9584 7599
Email:

[email protected]

Website: http://www.bactec.com.au/

Manager, Explosive Ordnance Services:

Mark Latimer

Tel/Fax: (07) 5526 0881
Mobile: 0438 443 283

Email: [email protected]

 

G-tek Australia Pty Ltd

Chief Operating Officer:
Greg Guthrie

25 Applecross Avenue
CASTLE HILL NSW 2154

Tel: (02) 9680 7268
Mobile: 0418 977 424
Fax: (02) 9680 7403
Email:

 

gguthrie@g-tek. biz
Website: http://www.g-tek.biz/

UXO Projects Manager:
Max Verrier

Tel: (07) 5493 8577
Mobile: 0418 776 203
Fax: (07) 5493 7405
Email:

[email protected]

 

Milsearch Pty Ltd

Managing Director:
David Halmarick

Unit 5, Level 1

30 Mawson Place
MAWSON ACT 2607
Mailing Address:

PO Box 687
MAWSON ACT 2607

Tel: (02) 6286 8299

Mobile: 0419 944 397

Fax: (02) 6286 8266

Email: [email protected]
Website: htep://www.milsearch.com.au/

Queensland Operations Manager:
Paul Ingerton

Tel: (07) 3824 1669
Mobile: 0413 452698
Email: [email protected]

 

 

CSG Demining Consultants

(Offers all Consultancy & Investigation.
services but does not undertake
Remediation)

Managing Director:

Carl Chirgwin

151 Golf Links Road
MAIDEN GULLY Vic 3551

Tel: (03) 54462408

Mobile: 0417-527264

Fax: (03) $4462481

Email: [email protected]
Website:

http://www.csgdemining.com.au

 

This list is drawn from the Department of Defence National UXO Office’s panel of UXO investigation and remedial search companies that can be found on
http://www. defence. gov.au/uxo/

Version — 21/08/2007

 

 

2895/8000

Page 21

                                                                                               2008/587



                                                 Appeal Rights
                                                INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                               (5) If an application is processed under section
The following is an extract from the Integrated            6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                  application are available only for the aspects of the
                                                           development that would have required public
Division 8 - Appeals to court relating to
                                                           notification under the repealed Act.
development applications
Appeals by applicants                                          (6) If an application involves assessment
4.1.27.(1) An applicant for a development                  against a concurrence agency code, appeal rights
application may appeal to the court against any of         for submitters for the application are not available
the following-                                             against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a              concurrence agency’s response for the code.
    development application;                               Appeals by advice agency submitters
(b) a matter stated in a development approval,             4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                of its jurisdiction, appeal to the court about the
    development, and the identification of a code          giving of a development approval for a
                         1
    under section 3.1.6;                                   development application if-
(c) the decision to give a preliminary approval            (a) the development application involves impact
    when a development permit was applied for;                 assessment; and
(d) the length of a currency period;                       (b) the advice agency told the applicant and the
(e) a deemed refusal.                                          assessment manager to treat its response to
                                                               the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                   (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the             business days after the day the decision notice or
decision notice or negotiated decision notice is           negotiated decision notice is given to the advice
given to the applicant.                                    agency as a submitter.
    (3) An appeal under subsection (1)(e) may be           Appeals for matters arising after approval given
started at any time after the last day a decision on       (co-respondents)
the matter should have been made.                          4.1.30.(1) For a development approval given for a
Appeals by submitters                                      development application, a person to whom any of
                                                           the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                           to the court against the decision in the notice-
application may appeal to the court about-
                                                           (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                               extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                               approval;
    provisions of the approval; or
                                                           (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                               a minor change to an approval.
    (2) The appeal must be started within 20
                                                               (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                   business days after the day the notice of the
after the day the decision notice or negotiated
                                                                   decision is given to the person.
decision notice is given to the submitter.
                                                               (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                   approval resulted from a development
the application is decided, the person may not
                                                                   application (superseded planning scheme)
appeal the decision.
                                                                   that was assessed as if it were an
    (4) If an application involves both impact                     application under a superseded planning
assessment and code assessment, appeal rights                      scheme.
for submitters are available only for the part of the
                                                               (4) Also, a person who has made a request
application involving impact assessment.
                                                                   mentioned in subsection (1) may appeal to
                                                                   the court against a deemed refusal of the
                                                                   request.

1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                           Page 21 of 22

Page 22

                                                                                              2008/587

     (5) An appeal under subsection (4) may be          For Building Works Only
         started at any time after the last day the     Rights of appeal conferred by Section 4.2.9 of the
         decision on the matter should have been        Integrated Planning Act 1997 as follows:
         made.
                                                        Division 3 – Appeals to tribunals relating to
                                                        development applications
Division 9 - Appeals to court about other
matters                                                 Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
                                                        4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following        may appeal to the Building and Development
notices have been given may appeal to the court         Tribunal against any of the following-
against the decision in the notice-
                                                        (a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to              development application;
    change or cancel a condition of a development
    approval.                                           (b) a matter stated in a development approval,
                                    2                       including any condition applying to the
(b) a notice under section 6.1.44 giving a decision         development, and the identification of a code
    to change or cancel a condition of a                    under section 3.1.6;
                                                                                  3
    development approval.
                                                        (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20                  development permit was applied for;
        business days after the day the notice of the
                                                        (d) the length of a period mentioned in section 3.5.21
        decision is given to the person.
                                                              currency period;
    (3) Also, a person who has made a request
                                                        (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal
        to the court against a deemed refusal of the       (2) An appeal under subsection (1)(a) to (d) must
        request.                                        be started within 20 business days (the “applicant’s
                                                        appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be           negotiated decision notice is given to the applicant.
        started at any time after the last day the
                                                            (3) An appeal under subsection (1)(e) may be
        decision on the matter should have been         started at any time after the last day a decision on the
        made.                                           matter should have been made.
Appeals against decisions to change approval            The Registrar for the Building and Development
conditions under the repealed Act                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a         http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
    (2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.


2
     Section 6.1.44 (Conditions may be changed or
                                                        3
    cancelled by assessment manager or concurrence           Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                        local planning instrument)
                                                                                          Page 22 of 22

Used in these records

About this file

File size
336 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000587.001 [As Published].pdf · 336 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.