Construction Issues
61. A Construction Management Plan (including a Traffic Management Plan) addressing all
construction phases shall be prepared by suitably qualified persons in consultation with the
Peregian Beach Business Association and submitted to Council for approval prior to obtaining
a Development Permit for Operational Works. The report should aim to address every
foreseeable problem that is likely to occur during the construction process and include
recommendation on how these can be overcome or minimised and shall also address parking
for construction workers.
To ensure construction is undertaken appropriately, the Construction Management Plan shall
also include a section written by a Geotechnical engineer addressing the excavation and
surrounding site support systems.
62. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to
any excavation or construction works taking place on site. If distress already exists, a
photographic survey shall be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented. A copy of this report is to be submitted to Council
within 5 business days of the survey and prior to construction work proceeding.
This report will be held by Council until all work is completed and will be used for verification
purpose and to ensure that all buildings, structures and services are left in at least the same
state as before construction commenced.
Erosion and Sediment Control
63. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
64. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,174
PSP16 – Sewerage Headworks Contributions $79,498
PSP17 – Water Supply Headworks Contributions $51,438
PSP20 – Pathway Trunk Network Contributions $2,196
TOTAL Contribution Amount = $ 135,306
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Page 9 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000587.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 336 KB (small file)
- File type
No other editions are linked here.