                                                                                                                                      1 METER MAX.                STAR PICKETS

                                               PROVIDE WASH WATER FOR                                                                                             DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                           WITH GRATE
                                               TRUCKS EXITING SITE
GRID 100mm HIGH AND




                                                                                                                                                                                                                                                                                                                                       500 - 600mm
                                               MIN LENG                                                                                                           WIRE OR STEEL MESH
SPACED AT 300mm CTS                                                                                                                                               (14 GAUGE x 150mm                                                                                              WRAP FILTER
                                                       T     H 10m                                                                                                OPENINGS) WHERE GEOTEXTILE                                                                                     CLOTH OVER GRATE
                                                                               BERM 300 HIGH MIN
  CONSTRUCTION SITE                                                                                                                                               IS NOT SELF-SUPPORTING
                                                                                                                                                                  WOVEN GEOTEXTILE                                                                                                                                                                                               1.5m STAR
                                                                                    EXISTING ROADWAY                                                                                                                                                                                                                                                                             PICKETS
                                                                                                                                                                                                                                                                                                                                                                                 AT MAX. 2.5m CENTRES

  GEOTEXTILE FABRIC                                                                                                                                          STAR PICKET                                                                                                                                                                                                      SELF-SUPPORTING
                                                                                                                                                             FITTED WITH                                                                                                                                                                                                      GEOTEXTILE
                                               50-75mm GRAVEL BED                                                                                            SAFETY CAP                                                                                                                                                                                                                   OW
                                               MIN 200mm THICK                                                                                                                                                                                                                                                                                                            DIRECTION OF FL
                 RUNOFF FROM PAD DIRECTED                                                                    SANDBAGS                                  WOVEN GEOTEXTILE
                 TO SEDIMENT TRAP
                                                                                                                                                                RUNOFF                                                                            WRAP FILTER
                                                                                                                                                                                                                            RUNOFF                                                                                                                                               ON SOIL, 150mm x 100mm
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                  WATER WITH                                                                        CLOTH OVER GRATE




                                                                                                                                     FLOW
                                                                                                                                                                                                                            WATER WITH                                                                                                                                           TRENCH WITH
                                     SCALE: N.T.S.                                                           WATERWAY                                           SEDIMENT
                                                                                                                                                                                                                            SEDIMENT                                                                                                                                             COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                                 AND ON ROCK, SET INTO
                                                                                                                                                                                                                                                                                                                                                                                 SURFACE CONCRETE




                                                                                                                                                                                                                                                                                                                                       600mm MIN.
                                                                                                             EXCAVATION
                                                                                                                                                                                                                                                              FILTERED                                                                                       SECTION DETAIL
                                                                                                                                                                                         FILTERED
                                                                                                                                                                                          WATER                                                                WATER
                                                                                                                                                               GEOTEXTILE
                                                                                                            EARTH BANK                                         EMBEDDED 150mm




                                                                                                                                                                                                                                                                                                                    MIN. 1.5m
                                                                                                                                                               INTO GROUND                                                                                                                                                                                           20m MAX.
                                                                                                                                                       FOR DROP INLETS AT NON-SAG POINTS,                                          GEOTEXTILE INLET FILTER TYPE B                                                                                                                   FLOW
                                                                                                                                                       SANDBAGS, EARTH BANK OR EXCAVATION                                                            SCALE N.T.S
                                                                                                                                                       USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                     STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                               MAX. 2.5m SPACINGS
                                                                                                              GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                      TYPICAL
                                                                                                              1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                              2.     PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                      PLAN

                                                                                                              3.     IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                                     OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                              4.     DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                                                                                                                                                                                                                                                                                                                     DISTURBED             DIRECTION           1.5m STAR PICKETS
                                                                                                                     ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                                                                                                                                                                                                                                                                                                                     AREA                  OF FLOW             AT MAX. 2.5m
                                                                                                                           GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                           CENTRES
                                                                                                                                              SCALE N.T.S

                  TIMBER SPACER                            KERB-SIDE
                  TO SUIT                                  INLET




                                                                                                                                                                                                                                                                                                                                                     UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                     AREAS

                                                      GRAVEL-FILLED WIRE
                                                      MESH OR GEOTEXTILE
                                                      "SAUSAGE"
                              OVERFLOW         TIMBER SPACER
  RUNOFF                                                                                                                    GRADIENT OF
  WATER WITH                                   TO SUIT                                                                                                         CAN BE CONSTRUCTED        ALL BATTER
                                                                                                                            DRAIN 1% TO 5%
  SEDIMENT                                                                                                                                                     WITH OR WITHOUT           GRADES 2(H):1(V)
                                                                                                                                                               CHANNEL                                                                                                                                              SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                         MAX.                                                                      STABILISE STOCKPILE SURFACE
                                                                                                                            DIRECTION O                                                                                                                                                                             1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                                              F FLOW                                                                 EARTH BANK                                  2:1                                                    TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE




                                                                                                                                                                                             300mm MIN.
    SEDIMENT                                                                                                                                                                                                                                           AX.)            SLO                                              DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                                  E (M                    PE
                                                                                                                                                                                                                            FLOW               LOP                             (MA                                      CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      GRAVEL-FILLED WIRE                                  FILTERED WATER                                                                                                                                                                  2:1 S                                   X.)
                                                                                                                                                                                                                                                                                                                        CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                                STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                  2m MIN
                                                                                                                                 150mm MIN




      "SAUSAGE"
      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                         NOTE: ONLY TO BE USED AS TEMPORARY                                                                                SEDIMENT FENCE                                       2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                  BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                  THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                             IS 80 METRES.
                                                                                                                                                                                                                       STOCKPILE CONSTRUCTION NOTES:                                                                3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                                DIVERSION DRAIN CONSTRUCTION NOTES:
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                           1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                  THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                           1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                              VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                      FITTED WITH SAFETY CAPS.
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                                  2.      AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                       2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                              4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                                                                                                                                                                                                                                       ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                            3.      ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                                             3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                  WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                                    IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
           BLOCKS.                                                                                                                                                                                                            THAN 2 METRES IN HEIGHT.                                                                          GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                            4.      BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                    SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                                         4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                                    CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                              FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                         5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                                         LESS THAN 0.10.
                                                                                                                            5.      ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                        6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                                   5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                                  THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                            6.      COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                              STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                                    CONSTRUCTION.
                    MESH & GRAVEL INLET FILTER                                                                                                         DIVERSION DRAIN                                                                                 STOCKPILES                                                                                       SEDIMENT FENCE
                                     SCALE N.T.S                                                                                                             SCALE N.T.S                                                                                      SCALE N.T.S                                                                                        SCALE: N.T.S.




                                                                                                                                     CLIENT DETAILS:                                                        PROJECT ADDRESS:                                                            APPROVED BY:                              PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                  PROPOSED RESIDENTIAL DUPLEX
                                                                                                                                              MOLTI INVESTMENTS PTY LTD                                                                                                                                                           TITLE:                                                      STATUS:

                                                                                                                                                                                                                      12 WYANDRA STREET                                                                                           EROSION AND SEDIMENT                                        FOR APPROVAL - NOT FOR
       © ABN 89 647 469 707
                                                                                                                                                                                                                     NOOSA HEADS, QLD, 4567                                                       BEN PARRY                       CONTROL DETAILS                                             CONSTRUCTION
        75 NOOSA DRIVE                                                                                                                                                                                                                                                                            RPEQ: 28084
                                                     01    15/09/2022 ISSUED FOR APPROVAL              JC          MVP    BP         SCALE:
     NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                          CPEng
         +61 7 5211 1003                             REV     DATE             DESCRIPTION              DWN     CHK        APP
                                                                                                                                                            AS INDICATED                                                                                                                         DATE: 16/09/2022
                                                                                                                                                                                                                                                                                                                                  DRAWING NUMBER:                                             PROJECT NUMBER:      SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                    SIZE:
     RECORCONSULTING.COM                                                            REVISIONS
                                                                                                                                                         DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                  031                                                          20220214            A1 01
Log in to download the original file

20220214-CV.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.