IDAS form 6—Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 2.1 effective 1 April 2013)


This form must be used for development applications for building work or operational work assessable against a
planning scheme.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

For all development applications, you must:
      complete IDAS form 1—Application details
      complete any other forms relevant to your application
    provide any mandatory supporting information identified on the forms as being required to accompany your
     application.
Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form must be used for building work or operational work relating to strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane
core port land or airport land.

This form can also be completed online using eDA at www.smarteda.qld.gov.au

Mandatory requirements


1. What is the nature of the work that requires assessment against a planning scheme? (Tick applicable box/es.)

             Building work—complete Table A                          Operational work—complete Table B

Table A
a)     What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
       underpinning, moving or demolishing a building)?




b)     Are there any current approvals associated with this application? (e.g. material change of use.)
             No                 Yes— provide details below

     List of approval reference/s                            Date approved (dd/mm/yy)    Date approval lapses (dd/mm/yy)




                                                            Qplan
Full text of the other 4 pages

Page 2

    Table B
    a)    What is the nature of the operational work made assessable in the planning scheme? (Tick applicable box/es.)
                Road works                       Stormwater              Water infrastructure

                Drainage works                   Earthworks              Sewerage infrastructure

                Landscaping                      Signage                 Clearing vegetation under the planning scheme

                Other—provide details      Landscaping

    b)    Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
               No          Yes—specify the number of lots being created

    c)    Are there any current approvals associated with this application? (E.g. material change of use.)
               No          Yes—provide details below

         List of approval reference/s                   Date approved (dd/mm/yy)          Date approval lapses (dd/mm/yy)
         2010/812                                       27 October 2010                   25 October 2014




    2. What is the dollar value of the proposed building work? (Inc GST, materials and labour.)           $

    3. What is the dollar value of the proposed operational work? (Inc GST, materials and                 $10,000
    labour.)


    4. Confirm that the following mandatory supporting information accompanies this application

Mandatory supporting information                                                        Confirmation of       Method of
                                                                                        lodgement             lodgement

All applications involving building work and/or operational work
    A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are                    Confirmed         Email
    recommended scales) which shows the following:
     the location and site area of the land to which the application relates
         (relevant land)
     the north point
     the boundaries of the relevant land
     the allotment layout showing existing lots, any proposed lots (including the
       dimensions of those lots), existing or proposed road reserves, building
       envelopes and existing or proposed open space (note: numbering is
       required for all lots)
     any existing or proposed easements on the relevant land and their
       function
     any access limitation strips
     all existing and proposed roads and access points on the relevant land.
    A statement about how the proposed development addresses the local                      Confirmed         Email
    government’s planning schemes and any other planning documents relevant

2                                                    IDAS form 6—Building or operational work assessable against a planning scheme
                                                                                                           Version 2.1 1 April 2013

Page 3

    to the application.
Applications for building work (including extensions and assessable demolition)
    Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are                     Confirmed
    recommended scales) which show the following:
                                                                                            Not applicable
       the north point
       the intended use of each area on the floor plan (for commercial, industrial
        or mixed use developments only)
     the room layout (for residential development only) with all rooms clearly
        labelled
     the existing and the proposed built form (for extensions only)
     the gross floor area of each proposed floor area.
    Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are                     Confirmed
    recommended scales) which show plans of all building elevations and
    facades, clearly labelled to identify orientation (e.g. north elevation).               Not applicable

    Plans showing the size, location, proposed site cover, proposed maximum                 Confirmed
    number of storeys, and proposed maximum height above natural ground level
    of the proposed new building work.                                                      Not applicable

    Plans showing the extent of any assessable demolition.                                  Confirmed
                                                                                            Not applicable
    Applications for operational work involving earthworks (filling and excavating)
    drawings showing:                                                                       Confirmed
     existing and proposed contours                                                        Not applicable
     areas to be cut and filled
     the location and level of any permanent survey marks or reference
        stations used as datum for the works
     the location of any proposed retaining walls on the relevant land and their
        height
     the defined flood level (if applicable)
     the defined fill level (if applicable).
    Applications for operational work involving roadworks
    Drawings showing:                                                                       Confirmed
     existing and proposed contours                                                        Not applicable
     the centreline or construction line showing chainages, bearings, offsets if
        the construction line is not the centreline of the road and all intersection
        points
       information for each curve including tangent point chainages and offsets,
        curve radii, arc length, tangent length, superelevation (if applicable) and
        curve widening (if applicable)
       kerb lines including kerb radii (where not parallel to centreline) and
        tangent point changes (where not parallel to centreline)
       edge of pavement where kerb is not constructed
       position and extent of channelisation
       location and details of all traffic signs, guideposts, guardrail and other
        street furniture
       pavement markings including details on raised pavement markers
       catchpit, manhole and pipeline locations
       drainage details (if applicable)
       cross road drainage culverts (if applicable)
       concrete footpaths and cycle paths
       location and details for access points, ramps and invert crossings

3                                                    IDAS form 6—Building or operational work assessable against a planning scheme
                                                                                                           Version 2.1 1 April 2013

Page 4

     changes in surfacing material.
    Applications for operational work involving stormwater drainage
    Drawings showing:                                                                      Confirmed
     existing and proposed contours                                                       Not applicable
     drainage locations, diameters and class of pipe, open drains and
        easements
     manhole location, chainage and offset or co-ordinates and inlet and outlet
        invert levels
     inlet pit locations, chainage and offset or co-ordinates and invert and kerb
        levels.
    Applications for operational work involving water reticulation
    Drawings showing:                                                                      Confirmed
     kerb lines or edge of pavement where kerb is not constructed                         Not applicable
     location and levels of other utility services where affected by water
        reticulation works
       pipe diameter, type of pipe and pipe alignment
       water main alignments
       water supply pump station details (if applicable)
       minor reservoir details (if applicable)
       conduits
       location of valves and fire hydrants
       location of house connections (if applicable)
       location of bench marks and reference pegs.
    Applications for operational work involving sewerage reticulation
    Drawings showing:                                                                      Confirmed
     location of all existing and proposed services
     location of all existing and proposed sewer lines and manhole locations              Not applicable
     location of all house connection branches
     kerb lines or edge of pavement where kerb is not constructed
     chainages
     design sewer invert levels
     design top of manhole levels
     type of manhole and manhole cover
     pipe diameter, type of pipe and pipe alignment
     location of house connections (if applicable)
     sewer pump station details (if applicable).
    Applications for operational work involving street lighting
    Drawings showing:                                                                      Confirmed
     location of all light poles and service conduits
     location of all other cross road conduits                                            Not applicable
     type of wattage and lighting
     any traffic calming devices
     additional plans for roundabouts and major roads (if applicable)
     details of any variations to normal alignment
     details of lighting levels.
    Applications for operational work involving public utility services
    Drawings showing:                                                                      Confirmed
     any existing light poles and power poles
     any existing underground services                                                    Not applicable
     details of proposed services
     alternation to existing services.
4                                                   IDAS form 6—Building or operational work assessable against a planning scheme
                                                                                                          Version 2.1 1 April 2013

Page 5

    Applications for operational work involving landscaping works
    Drawings showing:                                                                        Confirmed
     the location of proposed plant species
     a plant schedule indicating common and botanical names, pot sizes and                  Not applicable
       numbers of plants
     planting bed preparation details including topsoil depth, subgrade
       preparation, mulch type and depth, type of turf, pebble, paving and garden
       edge
     the location and type of any existing trees to be retained
     construction details of planter boxes, retaining walls and fences
     the proposed maintenance period
     irrigation system details.

Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use
of information recorded in this form.

OFFICE USE ONLY

    Date received                                           Reference numbers


The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning.
This form and all other required application materials should be sent to your assessment manager and any referral
agencies.




        Department of State Development, Infrastructure and Planning
        PO Box 15009 City East Qld 4002
5       tel 13 QGOV (13 74 68)                          IDAS form 6—Building or operational work assessable against a planning scheme
        [email protected]                                                                                Version 2.1 1 April 2013
        www.dsdip.qld.gov.au

Used in these records

About this file

File size
62 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

13142 - LS IDAS FORM 6.pdf · 62 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.