Council archive · source document
000A88A4.027.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-26 19:54.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:19.
PETRAC PTY LTD: Noosa North Shore Eco-Tourism Portal — Development Code
(2) Any party conducting works on
the land is to ensure that all
management strategies
specified in the detailed
sedimentation and erosion
control plan are complied with
at all times during the conduct
of the works.
(2)
Environmental
Council By-Laws and any
applicable noise limits.
Noise levels are to be
minimised both during the
construction phase and
operational phase of the
development.
In the event of a compiaint
being received regarding the
emission of noise from activities
conducted on the land, the
following limits are to apply at
the affected place measured in
accordance with the
appropriate Australian
Standard or guideline of the
Environmental
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.027.tifRelated documentApplication case desk ↗
About this file
- File size
- 541 KB (small file)
- File type
- TIF
No other editions are linked here.