Original source · versioned page text
EnviroTank Details & Certification
Wednesday, 19 August 2020 Noosa Council PO Box 141 Tewantin QLD 4565 Attention: Mr. Monkeith Kadhum Reference: OPW20/0108 MCU19/0089 Subject: Issue treatment devices/sumps from the refuelling area into the stormwater disposal system Dear Sir, Please find following information in regards to Councils concerns regarding any proposed connection of treatment devices/sumps from the refuelling area into the stormwater disposal system. Envirotank are the Australian distributors and manufacturers of oil water separators under license from “Premier Tech Aqua” and they are compliant to all the clauses of the British Standard – EN858‐ 1:2002(E) and specifically achieves the discharge maximum of less than 5ppm of light hydrocarbons and captures in excess of 95% TSS, silts, solids and organic matter. The site specific stormwater treatment solution for the under canopy and tanker off‐loading areas of Lot 21 RP 72829, Lot 1 RP 131598 will be a Clereflo CCS20‐40 full retention separator (No By‐Pass) Our solution of the Clereflo CCS20‐40 full retention separator (No By‐Pass) and has a full retention capacity of at least 8kL of light hydrocarbons. Accordingly the proposed unit is fitted with the following, Automatic closure device (ACD) on outlet. Monitored electronic overfill alarm system. Wet sealed entry to prevent back flushing and flame access to separator. Water tight Fibrelite FL90 Access Cover preventing surface water entry. Therefore the requirements of your Planning Permit No. OPW20/0108 MCU19/0089 being that in a 100 year flood event with 300mm of flood water above the FL of the forecourt the separator will fully retain its full contents of light hydrocarbons, silts, solids and any organic matter will be achieved. In support of this we attach the following documents / Certificates of Compliance for your perusal, 1. Premier Tech attestation of Conformity Certificate Class1 & Class2 ~ Bypass & Full Retention Oil Water Separators. (certified as fully compliant to the relevant discharge class; of less than 5ppm of light hydrocarbons Class 1) 2. Test Report – BSI, Report No: 285/4102208‐2 to Conder Products. (5 pages) 3. Test Report – BSI, Report No: 285/4075353‐Test Rig to Conder Products. (3 Pages) 4. IECEx Certificate of Conformity certificate no – IECExBAS 11.0095 (4 pages) 5. CCS20‐40 Drawings (3 Pages) Should you require any further information please do not hesitate to contact the under signed. Yours faithfully Phil Quinan Incl.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 16 pages
Page 2
CPQC858
Attestation of Conformity Certificate
Class1 & Class2 ~ Bypass & Full Retention Oil Water Separators
This is to certify that all Oil Water Separators designed and manufactured by Premiertech Aqua Ltd.,
UK both directly and under license have been tested and certified to be fully compliant to all Clauses
of EN858-1:2002(E)
Performance Testing
Carried out in line with Test Procedure 8.3.3.1.3 over the range of prototypes from NS3
up to NS25; both Full Retention and Bypass. All independent testing has been carried
out on the Premiertech Aqua Ltd., UK range of Separators by the British Standards
Institute using the Premiertech Aqua Ltd., UK in house Test Apparatus, independently
certified by BSI to clause 8.3.3.1.1 of the EN858 standard. All effluent samples taken
from the prototype testing carried out by BSI have been independent analysed in line with
Annex A of EN858-1:2002(E) and certified as fully compliant to the relevant discharge
class; 5ppm Class1 / 100ppm Class2. Results obtained across the wide range of flow
rates tested have enabled a certified extrapolation of the formula to cover from NS1.5 –
NS1000.
Design / Manufacture
Constructed in line with Clause 6.2.4 using Resins, reinforcement materials, processing
agents and other materials in accordance with EN976-1:1997, Clause 3.
Material Testing
Type Testing has been successfully carried out on all diameters of Tank; 1.0m,
1,2m, 1,5m, 1.8m, 2.5m, 3.0m & 4.0m and certified as fully compliant to Clauses
6.2.4a and 6.4.3 in accordance with Clause 8.1.2.1 and EN60, EN61, EN63, ISO180,
EN976-1 and EN978. All results from Material Prototype Testing including the four
Immersion Tests described in Clause 8.1.4.1 have been fully documented within the
Premiertech Aqua Ltd., UK ~ Attestation of Conformity Material Results File.
Independent Compliance Audit
In November 2006 the successful independent audit of the Premiertech Aqua Ltd., UK
Attestation of Conformity to EN858-1:2002(E) carried out by representatives from the
Trading Standards and Environmental Agency confirmed all clauses of the EN858-
1:2002(E) standard had been satisfied covering the full range of Separators from NS1.5 –
NS1000.
Issued by: Evangelos Petropoulos
Position: Technical Manager
Date of Issue: 12th of December 2017
Registered Office: 2 Whitehouse Way, South West Industrial Estate, Peterlee, Co Durham, SR8 2RA
Registered No: 06698049 England and Wales
Page 3
Test Report
Report No 285/4102208-2
Client Conder Products Ltd
Pullman House
Barton Park
Chickenhall Lane
Eastleigh
Hampshire
SO50 6RR
Authority & date Client's Fax. Dated 20 April 2000
Items tested Light liquid separator
Specifications Environment Agency Specification for Light Liquid Separators
Issue 1:1998 - Independent Test
Results Pass - See Summary of Results on page 2 of 5
Prepared by M A Chaplin
Authorized by D T Gall
Issue Date
Conditions of issue This Test Report is issued subject to the conditions stated in current issue of Test Leaflet 1
'General conditions relating to acceptance of testing'. The results contained herein apply only to the
particular sample/s tested and to the specific tests carried out, as detailed in this Test Report. The
issuing of this Test Report does not indicate any measure of Approval, Certification, Supervision,
Control or Surveillance by BSI of any product. No extract, abridgement or abstraction from a Test
Report may be published or used to advertise a product without the written consent of the
General Manager, BSI Product Services, who reserves the absolute right to agree or reject all or any
of the details of any items or publicity for which consent may be sought.
BSI Product Services Maylands Avenue Hemel Hempstead Hertfordshire HP2 4SQ Telephone: (01442) 230442
Page 4
Report No 285/4102208-2
Page 2 of 5
TESTING, EXAMINATION AND ASSESSMENT OF LIGHT LIQUID SEPARATORS
SUBMITTED AS INDEPENDENT TEST SAMPLES
INTRODUCTION
At the request of Conder Products Limited the light liquid separators detailed below, were tested
and assessed against the requirements of Environment Agency Specification for Light Liquid
Separators Issue 1:1998, as indicated on the following pages of this Report. This request was
made in a fax from the Client dated 20 April 2000. It is emphasized that assessments were not
made against the other clauses of the Specification.
This Report only relates to the actual sample which has been tested and assessed. The results
obtained do not necessarily relate to samples from the production line and in no way imply the
performance or quality of the continuing production will be maintained.
The tests and assessments contained in this Report were undertaken by BSI Product Services on
12 April 2000 at the manufacturer's premises, and additionally at BSI Product Services
Engineering Laboratory from 26 April 2000. The analysis of clause 4.3 was subcontracted.
TEST ITEM
Ref No. NS Volume (litres) Internal silt Class
trap
PG13 15 4915 No 1
SUMMARY OF RESULTS
The light liquid separator met the requirements of those clauses, or parts thereof, of the
Specification against which assessments were made.
Page 5
Report No 285/4102208-2
Page 3 of 5
EXAMINATION AND TEST
Model reference: PG13 Nominal size (NS): 15 Class: 1
CLAUSE ASSESSMENT
3. ASSESSMENT OF TEST RIG
Refer to BSI Test Report No 285/4075353 - Test Rig. Pass
4. TEST AND ASSESSMENTS
Testing was carried out on a test rig approved in accordance
with clause 3. Pass
Testing was witnessed by BSI Product Services. Pass
The nominal size of the separator was NS15. Pass
4.2 Test fluids
The water used was declared by the manufacturer to be
drinking water. Pass
The initial temperature of the water was 10.9 °C. Pass
The final temperature of the water was 11.2 °C. Pass
The pH of the water was 7.42. Pass
The light liquid was fuel oil, having a density of 0.85 ± 0.015
g/cm3 at a temperature of 12°C. Pass
The temperature of the light liquid was 6.2 °C. Pass
4.3 Test procedure for nominal size and class
TE (mins) = 20.96
VK (l) = 4716
-1
Qw (ls ) = 15
The manufacturer's value for VK was checked by review of
manufacturer's drawing number 2755 dated 4 January 2000
and appropriate calculations. Samples taken during the test
were dispatched in accordance with Appendix A of the
Specification. Pass
The samples taken during the test were treated and dispatched
in accordance with Appendix A of the Specification. Pass
Page 6
Report No 285/4102208-2
Page 4 of 5
EXAMINATION AND TEST (CONTINUED)
CLAUSE ASSESSMENT
4. TEST AND ASSESSMENTS (CONTINUED)
4.3 Test procedure for nominal size and class (continued)
The effluent samples taken during the test were examined for
their light liquid content. The results were as follows.
Maximum Actual
Light liquid (mg/l) light liquid (mg/l)
Sample 1 - 1.4 -
Sample 2 - 0.5 -
Sample 3 - 0.2 -
Sample 4 - 0.3 -
Sample 5 - 0.7 -
Average 5 0.6 Pass
4.4 Sludge traps
The sludge trap was constructed with a flow control device at
the inlet to reduce the inflow velocity and provide a uniform
flow pattern. Pass
The device was designed to avoid short circuit and allow
sediment to settle. Pass
The capacity for silt storage (C) was provided as a separate
upstream unit, manufacturers type QG 15. The capacity was
determined by calculations made from manufacturer's drawing
number 2271 dated 21 January 2000. Pass
Specified Actual
C(l) = 1500 min 1996 Pass
4.5 Closure devices
The separator was provided with an automatic closure device. Pass
The closure device was operated by the accumulated light
liquid. Pass
4.6 Access for cleaning and inspection of separator
The separator was provided with sufficient access points to
allow for inspection and cleaning of the internal chamber. Pass
Page 7
Report No 285/4102208-2
Page 5 of 5
EXAMINATION AND TEST (CONTINUED)
CLAUSE ASSESSMENT
4. TEST AND ASSESSMENTS (CONTINUED)
4.7 Installation and maintenance instructions
The separator was supplied with a manual detailing the
following minimum information:
a) The model and nominal size of the separator Pass
b) Installation instructions Pass
c) Manufacturer's recommendations for regular inspection
and maintenance Pass
d) Manufacturer's name and address Pass
4.8 Labelling of separators
The labelling was in accordance with PPG3 Section 6 Pass
The labelling included the following information
Manufacturer's reference number: Pass
Year of manufacture: Pass
Full retention: Pass
Oil storage capacity: Pass
Oil level warning device details: Pass
Class of separator: Pass
Volume of separator: Pass
Depth of oil storage: Pass
Nominal size: Pass
Silt storage capacity: Pass
Closure device details: Pass
Actual Marking:
Page 8
Test Report
Report No
Client
Authority & date
Items tested
Specifications
Results
Prepared by
Authorized by
Issue Date
Conditions of issue
ms
a
285/4075353 - Test Rig
Conder Products Ltd
Pullman House
Barton Park
Chickenhall Lane
Eastleigh
Hampshire
S050 6RR
Client's Fax Dated 18 January 2000
Separator test rigs.
Environment Agency Specification for compliance of light Liquid:
separators Issue 1:1998 - Independent Test
Pass - See Summary of Results on Page 2
MA Chaplin W, Cyl
DT Gall Nawd Kal |
23 JANUARY 2060
This Test Report is issued subject to the conditions stated in current issue o
‘General conditions relating '. The results contained heret
particular sample/s tes’ i s detailed in this T
issuing of this Test Report y measure of Approval, Certification
. No extract, abridgement or abstr
product without the written consent of t
the absolute right to agree or reject all or any
nt may be sought.
ly only to the
. The
yervision,
from a Test
ried o
Report may be published or used to advertise a
General BSI Product Services, who r
of the details of any items or publicity for which
BSI Product Services Maylands Avenue Hemel Hempstead Hertfordshire HP2 4SQ Telephone: (01442) 230442
Page 9
Report No 285/4075353 - Test Rig Page 2 of 3 TESTING, EXAMINATION AND ASSESSMENT OF A SEPARATOR TEST RIG SUBMITTED AS AN INDEPENDENT TEST SAMPLE INTRODUCTION At the request of Conder Products Limited, the separator test rig detailed below, was tested and assessed against the requirements of the Environment Agency Specification for the compliance of light liquid separators: Issue 1: 1998. This request was made in the form of a client's fax dated 18 January 2000. The tests and assessments contained in this report were carried out by BSI Product Services. This Report only relates to the actual sample which has been tested and assessed, The tests and assessments contained in this Report were undertaken by BSI Product Services on 12 and 17 January 2000 at the manufacturer's premises. TEST ITEM Sample Reference Description. 6<NSs30 Separator test rig for light liquid separators with a nominal size greater than 6 but less than or equal to 30. SUMMARY OF RESULTS The separator test rig met the requirements of the Specification or parts thereof against which assessments were made.
Page 10
Report No 285/4075353 - Test Rig Page 3 of 3 EXAMINATION AND TEST (CONTINUED) 6<NS<30 d; (mm)= 995 - d, (mm)= 297 - d; (mm)= 25 + h, (mm)= 644 - h2 (mm)= 290 - h3; (mm)= 354 Pass 1, (mm)= 893 - l (mm)= 2502 - The space between the outside diameter of the light liquid supply pipe and the outside diameter of the outlet pipe was 70mm. - The supply channel had a gradient towards the collecting chamber of 6%. Pass The length of the supply pipe was 1970mm. - The depth of the flow regulating grid was 150mm. - The distance from the lowest point at the end of the supply channel to the base of the outlet pipe was 226mm. - The size of the apertures of the flow regulating grid were 30 x 30mm. - The distance from the nearest edge of the outlet pipe (inside diameter) to the end of the supply channel was 36mm. Pass The depth at the centre of the supply channel was 649mm. - The height of the weir at the centre of the supply channel was 196mm. - The width of the supply channel was 695mm. - The supply pipe had a gradient of 1.7:50 from the collecting chamber to the separator. Pass The test fluids were supplied by means of a dosing pump and flow meter. - The bottom of the outlet pipe from the supply channel and light liquid supply pipe were at the same level. Pass The sampling pipe was 200mm from the wall of the separator, at an angle of 5° at the bottom of the separator outlet pipe in the direction of flow. Pass The internal diameter of the sampling pipe was 12mm. - The radius of the drainage hole at the centre of the weir was 37.5mm. -
Page 11
Tae IECEx Certificate a Es | of Conformity INTERNATIONAL ELECTROTECHNICAL COMMISSION IEC Certification Scheme for Explosive Atmospheres for rules and details of the IECEx Scheme visit www.iecex.com Certificate No.: IECEx BAS 11.0095 issue No.:0 Certificate history: Status: Current Date of Issue: 2011-08-23 Page 1 of 3 Applicant: Darcy Products Limited Trading as Darcy Spillcare 157 Mill Street East Malling Kent ME19 6BP United Kingdom Electrical Apparatus: 14300 Separator Monitor Optional accessory: Type of Protection: Intrinsic Safety Marking: [Ex ia] lIC (-20°C < Ta $ +50C) Approved for issue on behalf of the IECEx Certification Body: Position: Signature: (for printed version) Date: 1. This certificate and schedule may only be reproduced in full. 2. This certificate is not transferable and remains the property of the issuing body. 3. The Status and authenticity of this certificate may be verified by visiting the Official IECEx Website. Certificate issued by: Baseefa Rockhead Business Park Staden Lane Buxton Derbyshire SK17 9RZ United Kingdom Baseefa
Page 12
IECEx Certificate Lae Gt of Conformity Certificate No.: IECEx BAS 11.0095 Date of Issue: 2011-08-23 Issue No.: 0 Page 2 of 3 Manufacturer: Darcy Products Limited Trading as Darcy Spillcare 157 Mill Street East Malling Kent ME19 6BP United Kingdom Manufacturing location(s): This certificate is issued as verification that a sample(s), representative of production, was assessed and tested and found to comply with the IEC Standard list below and that the manufacturer's quality system, relating to the Ex products covered by this certificate, was assessed and found to comply with the IECEx Quality system requirements. This certificate is granted subject to the conditions as set out in IECEx Scheme Rules, IECEx 02 and Operational Documents as amended. STANDARDS: The electrical apparatus and any acceptable variations to it specified in the schedule of this certificate and the identified documents, was found to comply with the following standards: IEC 60079-0 : 2004 Electrical apparatus for explosive gas atmospheres - Part 0: General requirements Edition: 4.0 IEC 60079-11 : 2006 Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i" Edition: 5 This Certificate does not indicate compliance with electrical safety and performance requirements other than those expressly included in the Standards listed above. TEST & ASSESSMENT REPORTS: A sample(s) of the equipment listed has successfully met the examination and test requirements as recorded in Test Report: GB/BAS/ExTR11.0183/00 Quality Assessment Report: GB/BAS/QAR11.0010/00
Page 13
IEC Ea IECEx Certificate a of Conformity Certificate No.: IECEx BAS 11.0095 Date of Issue: 2011-08-23 Issue No.: 0 Page 3 of 3 Schedule EQUIPMENT: Equipment and systems covered by this certificate are as follows: The 14008 Separator Monitor is designed to monitor the level of a material in a tank or storage container and provide a volts-free contact output to actuate external indicators or sounders. The apparatus is mains powered and is designed to be mounted in a non-hazardous area. The connections to the hazardous area are galvanically isolated from the incoming mains supply. The electronic components are mounted on a single PCB inside a steel or plastic enclosure. Cable glands in one side of the enclosure are provided for the input and output cables. A set of terminals are provided to connect to a probe that is mounted in the hazardous area. The front panel of the apparatus has an operator interface comprising an LCD and push switch. Terminal and load parameters are shown in the certificate annex. CONDITIONS OF CERTIFICATION: NO Annexe: IECEx BAS 11.0095 annex O.pdf
Page 14
Baseefa Rockhead Business Park Staden lane, Buxton, Derbyshire SK17 9RZ United Kingdom BYR =\s¥ i] ANNEX to IECEx BAS 11.0095 Issue No. 0 Date: 2011/08/22 Mains Supply and Relay Contact Terminals TB2 & TB3 Un = 253Vrms Hazardous Area Terminals TB1 Terminal Parameters Uy =12.6V Ip =87mA Py = 273mW C, =0 L, =0 Hazardous Area Terminals TB1 Load Parameters The capacitance and either the inductance or inductance to resistance ratio (L/R) of the load connected to hazardous area terminals TB1 must not exceed the following values: GROUP CAPACITANCE INDUCTANCE OR_|L/R RATIO (uF) (mH) (uH/ohm) IIc as 46 74 IIB 7A 18.7 298 HA 27 876 596 The above load parameters apply where: 1. The external circuit contains no combined lumped inductance L, and capacitance C; greater than 1% of the above values. or 2. or 3. with a cable. The inductance and capacitance are distributed as in a cable. The external circuit contains either only lumped inductance or lumped capacitance in combination In all other situations e.g. the external circuit contains combined lumped inductance and lumped capacitance, up to 50% of each of the L and C values is allowed. The L/R values shown are the worst case values that allow for a single 8 core cable being used. Page 1 of 1
Page 15
FILE NAME:
CCS 20/40 2.0
FRP LID
MODEL: it 29
TRELOUAR MC1000
MANWAY COVER
1000 OD
TRELOAR MC1000 1020 OD 11200 RISER
MANWAY COVER SEAT RING SEGMENTED LOW DENSITY 150 mm TH. MAIN
POLYSTYRENE FOAM PACKER CONCRETE SLAB
< 1000 OD 30mm THICK
= TRELDAR MC1000 MANWAY REDUCER 1200-900 RISER LID Al2 FABRIC
oO
2 SEAT RING ho |
7 mJ
s | I oO
Te Dn300_uPVC_INLET Dn300 uPVC OUTLET Ul 0
| T —
a TI
oc TI
il O
oO Ww
5 S o
DB
© |
“|
Q SS Sil G
sy EEE Ee | FHI ENVIROTANK a}
Us APPROVED BACKFILL oO
— MATERIAL 2
6950 (AS PER ENVIROTANK
HOLD DOWN STRAPS & INSTALLATION INSTRUCTIONS
ANCHOR POINTS (SEE ENVIROTANK SIDE SECT. VIEW MINIMUM 450mm CLEARANCE END SECT. VIEW
INSTALLATION INSTRUCTIONS) (SHOWING GENERAL INSTALLATION ARRANGEMENT) AROUND TANK (SHOWING GENERAL INSTALLATION ARRANGEMENT)
CONCRETE ANCHOR LAYOUT
20:08 NEDA ESSE ALOU, SPW A
7 eX la a3 la aN Z ANCHOR END VIEW 2)MARK ANCHORS AS INDICATED INCLUDING
7295 2000 750 _|_750 725 3 ap.
xy ae
3475 —
6950 | 300
CUSTOMER © Copyright Envirotank Pty. Ltd. Drwg.No. Rev.
| Sheet: 3 OF 3
© TisSueD FIR APPRUVAL 06.0819 ISSUED FOR ey conder Title: GENERAL INSTALLATION ARR,
REV DESCRIPTION DATE ooc [DRAWN [CHECKED DATE SCALE @ A3 APPROVAL *
CHG No| DWB PQ 06.08.19 REF SHT ENVIRONMENTAL SOLUTIONS |CCS?P(0/40 UIL/WATER SEPARATOR
Page 16
SWT H20 FILE NAME: CCS 20/40 2,0 SECTION VIEW B-B SHEET—1 CON 13 SECTION VIEW _A-A SHEET—1 ooce ee = 15 20) | ° zi $5 5 Sf 2 x LIFTING LUGS ! (10) A A | — T- WH =| Th iT OXANL ~_\ | ‘cf 4 : 4 ON N o_O) MA LL b-o-d LL td N(8) Poros Le = y bool 5 oO Oo O_O tO 5 o bO44 14 © O Po —_— ( \ wa By —— “4 725 5500 725 CCS20/740 EQUIPMENT LIST ITEM No. DESCRIPTION Ty. 6950 1 92.0 M SINGLE WALL SHELL 1 2 FILTER BASE 1 DETAIL—"F” SHEET— 1 150 PARTIAL PLAN VIEW 3 40L/SEC FILTER 1 (SHOWING RISER CONFIGERATION) 4 Dn300 uPVC S/W VENICAL OUTLET 1 5 9900 RISER 2.0M SHELL 1 p= = SSS +t == 6 Dn300 uPVC SOCKET 3 | 7 Dn300 uPVC S/W PIPE. INLET 1 \~ 8 Dn300 uPVC VERTICAL INLET 1 | | 9 Dn300 uPVC 90% ELBOW 2 wit NE UARESTING ee = 20) 10 Dn300 uPVC S/W OUTLET 1 MESH SCREEN | VENTED —_ 1 Dn80 uPVC ALARM PROBE HOLSTER 1 100mm . 12 ALARM PROBE HOLSTER MOUNT 1 | BREWED NE) 13 FRP. LID 1 220 | 14 AUTOMATIC CLOSURE DEVICE 1 | 15 FILTER MOUNT BRACKET GR.316 ST/ST 1 | 16 JUNCTION BOX MOUNT GR.316 ST/ST 1 17 FRP INLET SUPPORT 1 18 19 20 100NB uPVC VENT WITH SPARK ARRESTING MESH 1 Cc U STO M ER © Copyright Envirotank Pty. Ltd. D rwg . N oO. Rev. | Sheet: 2 OF 3 0. [ISSUED FOR APPROVAL 06.0819 ISSUED FOR X< Conder Title: ENR ARRANGEMENT REV DESCRIPTION DATE eae No RB oO 56.08.19 Orr Su APPROVAL ENVIRONMENTAL soLuTions | CCS20/40 UIL/WATER SEPARATOR
Page 17
MODEL: SWT He20
FILE NAME: CCS20/40 2.0 SIDE ELEVATION SECT VIEW A-A S1
oO 9100mm uPVC VENT 900
Q WITH SPARK ARRESTING
|) MESH SCREEN
O > Lal
2
Dn300 uPVC INLET Dn300 uPVC OUTLET Hl —
= = rT
|
1700
REFER INSTRUCTIONS ©
500 | 500
~~
1500
6950
3mm 316 S/S
PLAN VIEW FLAMEPROOF JUNCTION
— BOX MOUNT I-No, REQ’D
3mm 316 S/S
ALARM PROBE MOUNT
BRACKET 1-No. REQ’D
2750 REF
NOTE:— REFER DRWG. No. 1118/20/028 SHEET—2 FOR
TANK EQUIPMENT LIST
¢100mm uPVC VENT 3mm 316 S/S
WITH SPARK ARRESTING FILTER HANDLE MOUNT NOTES:—
MESH SCREEN BRACKET 1-No. REQ’D 1) >& INDICATES NO SKIN FITTINGS IN THIS AREA.
2 <@INDICATES HOLDOWN STRAP POSITION
(IF REQUIRED)
CUSTOMER © Copyright Envirotank Pty. Ltd. Drwg.No. Rev.
ENVIROTANK STANDARD ENVIROTANK | iii8/e20/0e8 + |0
| Sheet: 1 OF 3
ISSUED FOR APPROVAL 06.08.19 ISSUED FOR
REV
Doc |ORAWN [CHECKED DATE SCALE © A3
DESCRIPTION DATE Oe oe DWE BO 06.08.19 APPROVAL
x
conder
ENVIRONMENTAL SOLUTIONS
Title: GENERAL ARRANGEMENT
CCS20/40 OIL/WATER SEPARATOR