OPW15/0035 Approved Decision Notice
Officer: Monkeith Kadhum Direct Telephone: 5329 6293 Our Reference: MKADHUM:OPW15/0035 Your Reference: n/a 27 March 2015 GH Acton 9 Weyba Esp NOOSA HEADS QLD 4567 [email protected] Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 25 March 2015, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: OPW15/0035 Street Address: 9 Weyba Esp NOOSA HEADS QLD 4567 Real Property Description: Lot 4 RP 125028 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work (Residential Driveway Relocation) 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS Engineering All works must be constructed and work procedure undertaken in accordance with: The approved plans unless otherwise amended by the conditions and of this Decision Notice All relevant Noosa Plan’s Codes and Policies, particularly PSP 5 – Engineering Design Standards – Roads, Drainage and Earthworks. Provision of the Work Health and Safety Act and such other legislation as is applicable to workplace health and safety Construction management measures must be put in place to address the following: Traffic Management during the construction phase including: Minimising impact on traffic flows and safety in the local roads including any required temporary signage and traffic control measures in accordance with Manual of Uniform Traffic Control Devices (MUTCD) to provide warning to drivers and road users of any safety hazard or changes to traffic conditions due to the proposed works. Fencing to the work site during the construction phase as may be necessary to ensure the safety of the public and the road users. Ensuring no hindrance or obstruction to any existing access to other properties. Effective measures to minimise adverse environmental impact on other properties and roads users including noise and dust emission. Maintaining a communication protocol with the adjoining owners to advise of construction times, impacts on traffic and any other relevant issues. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. Any damage to the external road pavement and/or kerb line as consequence of construction activities associated with this approval must be remedied by the applicant at the applicant’s cost. In this regard, the road surface of the street network across the frontage of the site must be photographed prior to any works commencing on site and made available for future reference or when requested by Council. The integrity and conditions of any existing public and/or Council infrastructure and services (aboveground and/or underground) must not be adversely affected by the proposed works. All costs associated with repair, replacement or alteration to existing infrastructure must be met by the applicant. New Driveway The new driveway within the site shall be constructed generally in accordance with approved plans and must: Consist of bitumen seal, concrete slab or an approved pavement type in accordance with the current best engineering practice using non-slip surface finish that ensures pedestrian safety. Have a minimum 500mm wide vegetated setback from the dividing boundary line with the adjacent property. Have a minimum clearance of 500mm from any water metre, unless a written approval obtained from Unitywater and submitted to Council if otherwise The new access crossover (ie the section of the driveway between the kerb line and the property boundary line) must be concrete slab construction generally in accordance standard engineering drawing SEQ R-050 and must be constructed to ensure pedestrian safety using non-slip materials to produce an evenly graded surface finish matches the existing verge without trip hazards. All works must not adversely impact on the existing drainage conditions by concentrating stormwater runoff or causing additional ponding onto neighbouring properties or the road footpath verge, any need for stormwater drainage works associated with the proposed development must be addressed in accordance with the supervising engineer recommendation and/or Council’s directions. Pavement design for privately owned works must be undertaken in accordance with the relevant standards and best engineering practice. The structural integrity and the ongoing maintenance of the driveway will remain the responsibility of the property owner/developer. The redundant property access must be removed, and the kerb and verge area reinstated to match the existing kerb and verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. Any existing kerb sections requiring removal due the works must be saw-cut and removed to allow for a smooth and neat finish with the new works. Trees Removal and Landscaping Only the Grevillia robusta (Silky Oak) and Callistemon sp. located in the southern portion of the road reserve is permitted to be removed. Prior to felling, all trees are to be checked for wildlife (ie koalas, possums, birds etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree. Removal of approved existing trees and removal of redundant driveway must include: Rectification to the finished surface levels and materials. Result in the area being stable, planted and grassed. No damage to other vegetation for retention. Legal disposal of all removed vegetation and debris. Other vegetation located within the road reserve must be protected from potential development impacts through the provision of temporary barrier mesh or alike for the duration of the construction period. Replanting with 2 x 45 L Eucalyptus tereticornis (Red River Gum) in the redundant driveway location must occur within 2 months of the completion of the construction of the new driveway. Planting must be in accordance with Planning Scheme Policy 3 Landscaping Plants and Guidelines. Erosion and Sediment Control The applicant must ensure non essential exposure of soil is prevented by restricting the extent of clearing and minimising the duration of soil exposure to adverse weather conditions and effectively turf or stabilise any cleared area without delay and prior to rainfall occurring. The applicant must ensure sediment does not leave the site or ends into the street channel and Council’s drainage system due surface runoff or on tyres of vehicles and/or machineries and appliances. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicles shakedown pad/grid at the access to the construction site. Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. After Construction A final inspection and approval of the new driveway and the completed reinstatement works by Council’s inspector is also required. Please contact Council’s Planning and Environment Section on 5329 6244 to arrange the inspection. 5. REFERRAL AGENCIES Not Applicable. 6. APPROVED PLANS The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date C05 - Job Ref: SC-5054 A Detail Layout Plan, prepared by Empire Engineering March 2015 C06 - Job - Ref: SC-5054 A Standard Details, prepared by Empire Engineering March 2015 7. REFERENCED DOCUMENTS Not Applicable. 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Plans Checking and Auditing by Council Council has undertaken an audit check of the Operational Works plans in relations to the proposed works. A detailed check of the calculations and plans has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Environmental Protection The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Not Applicable 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.. Yours faithfully Monkeith Kadhum Development Engineer cc Unitywater Enc: Approved Plans/Documents Appeal Rights Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 7 of 8 [word/footer2.xml] Page 1 of 8 [word/header1.xml] OPW15/0035 [Attachment: image1.jpeg (image text)] NOOSACOUNCIL Pest 2iopss2esm ——atgroxagngoas aoe TowotNaoeses — Florssvessi — atoomagagara [Attachment: image3.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0035 Approved Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 105 KB (small file)
- File type
- DOCX
No other editions are linked here.