Bushfire Hazard Management Plan v3                                                                                                               NCES REF: J000662
Lot 101 on SP142407, Lot 140 on MCH978, Lot 3 on RP137375,
Lot 2 on RP852009 and Lot 8 on RP160703 - 27 Wilgee Court, Cooroy



Table 3 – Table 8.2.3.2 Criteria for Assessable Development - Noosa Plan 2019 Bushfire Hazard Overlay Code

 PERFORMANCE OUTCOMES                                        ACCEPTABLE OUTCOMES                               PROPOSED SOLUTION

 Safety of people and property

 PO1                                                         AO1.1                                             This Bushfire Hazard Management Plan has been
                                                                                                               prepared to maintain the safety of people and
 Development maintains the safety of people and              Development which will materially increase the
                                                                                                               property from the adverse impacts of bushfire. The
 property from the adverse impacts of bushfire.              number of people living or congregating on
                                                                                                               clearing associated with the development will
                                                             premises, including reconfiguring a lot, is not
                                                                                                               significantly reduce the threat of bushfire
                                                             located within a medium or high bushfire hazard
                                                                                                               transmission throughout the site.
                                                             area.

                                                             AO1.2                                             All proposed allotments are to be provided with
                                                                                                               setbacks that enable AS3959 Bushfire Attack
                                                             Development maximises setbacks from
                                                                                                               Level 29 construction requirements or lower.
                                                             hazardous vegetation to achieve an acceptable
                                                             risk.

 Impacts on Ecologically Important Areas

 PO2                                                         No acceptable outcome provided                    Clearing of an on Ecologically Important Area is
                                                                                                               required on Lot 6 to support a building envelope
 Bushfire mitigation measures do not adversely
                                                                                                               and an APZ that enables a BAL 29 building
 impact on:
                                                                                                               construction standard. This impact is proposed to
  ·      biodiversity values, connectivity and                                                                 be offset by extensive rehabilitation and
         ecosystem functioning; and                                                                            revegetation works within the proposed covenant
  ·      the long term physical integrity of                                                                   areas on the site (refer Ecology Report 2019 by
         waterways, wetland and areas of native                                                                NCES).
         vegetation.

 Water Supply for Fire Fighting Purposes

 PO3                                                         AO3.1
                                                             Premises are connected to the reticulated water
                                                             supply.




© 2020                                                                              33
Log in to download the original file

Bushfire Hazard Management Plan v3 - 27 Wilgee Ct Cooroy.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.