Council archive · source document
site access , Driveway Earthworks,Retaining , · OPW24/0017
Door Schedule Window Schedule
Mark Height Width Comments Level Mark Width Height Comments Level
D01 2040 920 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W01 1750 600 LOUVRES NEW ROOMS
D02 2040 820 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W02 1200 1300 LOUVRES NEW ROOMS
D03 2100 3000 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W03 2400 800 LOUVRES NEW ROOMS
D04 2040 920 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W04 2050 800 LOUVRES NEW ROOMS
D05 2100 820 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W05 300 2100 LOUVRES NEW ROOMS
D06 2040 820 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W06 2700 800 LOUVRES NEW ROOMS
D07 2040 820 HOLLOW CORE DOOR. PAINT FINISH NEW ROOMS W1.1 2700 800 BED 1
D08 2032 920 HOLLOW CORE DOOR. PAINT FINISH NEW ROOMS W1.2 1000 1200 BED 1
D1.01 2040 820 SOLID CORE DOOR. PAINT FINISH BED 1
D1.02 2040 820 SOLID CORE DOOR. PAINT FINISH BED 1
NOTE: ANY OVERSIZED LOUVRES TO BE STRONGHOLD
ANY LOUVRE BANKS IN BEDROOMS OR ABOVE 1M FROM THE GROUND TO COMPLY WITH SAFETY FROM FALLING REQUIREMENTS
PROPOSED CARPORT TO EXISTING RESIDENCE SCHEDULES
DWG 06.0
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale
Date 20 FEB 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.