Original source · versioned page text
Revised Civil Plans
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN EARTHWORKS SECTIONS
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-201 REVISION C A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.