Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Negotiated Decision Notice MCU26 0064 & OPW26 0093 (As Published) · MCU26/0064

of 6

Text shows just the words. Original shows the document exactly as it was published.

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.           Rev.    Plan/Document Name                             Date

                         -                  A       COVER SHEET                                    25/08/2026
                                                    Prepared by KUNKEL BUILDING DESIGN

                         SHEET NO 01        A       SITE PLAN                                      25/08/2026
                                                    Prepared by KUNKEL BUILDING DESIGN

                         SHEET NO 02        A       FLOOR PLAN, FLOOR FRAMING PLAN &               25/08/2026
                                                    TYPICAL SECTION
                                                    Prepared by KUNKEL BUILDING DESIGN

                         -                  A       DRAWING REGISTER                               01/09/2026
                                                    Prepared by HR DESIGN CONSULTING
                                                    ENGINEERS

                         Job No.:26-0512    A       GENERAL NOTES                                  01/09/2026
                         SO1                        Prepared by HR DESIGN CONSULTING
                                                    ENGINEERS

                         Job No.:26-0512    A       FOOTING LAYOUT & DETAILS                       01/09/2026
                         SO2                        Prepared by HR DESIGN CONSULTING
                                                    ENGINEERS

                         Job No.:26-0512    A       BEARER & JOISTS LAYOUT (Deck)                  01/09/2026
                         SO3                        Prepared by HR DESIGN CONSULTING
                                                    ENGINEERS

                         Job No.:26-0512    A       CONNECTION DETAILS                             01/09/2026
                         SO4                        Prepared by HR DESIGN CONSULTING
                                                    ENGINEERS

                      Currency Period
               2.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with, and the plan of survey lodged with Council for endorsement by 10 September
                      2026, unless an application to extend the currency period is approved by Council.
                      Performance Bond
               3.     Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      commencement of the works. The cash bond or trading bank guarantee will be returned on
                      performance of the conditions of this approval less any costs incurred by Council in respect
                      of enforcing performance of this permit. Council reserves the right to call upon the bond or
                      guaranteed sum to effect compliance with conditions.
                      Bonds
               4.     Bonds must:



                                                                                                     Page 2 of 6
Document Set ID: 25243005
Version: 3, Version Date: 13/10/2026

Used in these records

About this file

File size
151 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU26 0064 & OPW26 0093 (As Published).pdf · 151 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.