Capital Program 2024/2025 Delivery Status · Report
SERVICES & ORGANISATION COMMITTEE MEETING 6 MAY 2025
o Tewantin, Moorindil Street
The following pathways are in the planning, design and procurement stages, in preparation for
construction commencement during Q4 2024/25:
• Pomona, Summit Road
• Shire Wide - Pathway Renewal Program
o Cooran, Bridge Street
o Cooroy, Diamond Street
o Noosa Heads, Noosa Parade
o Noosaville, Gympie Terrace
o Tewantin, Sheild Street/Werin Street
o Tewantin, Waratah Close
o Tewantin, Yellowwood Drive/McKinnon Drive
Noosa Biosphere Trails
Upgrade works on the Noosa Biosphere Trails have continued through Q3 of 2024/25, with the
completion of the following projects:
Works are still ongoing on:
• Twin Hills, Wahpunga Trail – disaster landslip works including drainage, new signage, new
fencing, new shade structure and new vegetation. Expected completion Q4. In line with
funding grant.
Planning is ongoing on the following trails:
• Boreen Point to Tewantin, Cooroibah Trail
• Lake McDonald to Peregian Beach, New Weyba Trail
• Pomona to Cooroy, Kurui Trail – Renewal
• Cooran to Kin Kin, Woondum Trail and Kin Kin to Lake Macdonald Wahpunga Trail -
Renewal
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Capital Program 2024/2025 Delivery Status · ReportReportsMeeting 773 · read item & discussion ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.