Original source · versioned page text
2014-08-28 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 28 AUGUST 2014
Health and Safety
6. The development must not, at any time during the life of the development,
result in human exposure to environmental electromagnetic emissions
exceeding the current regulations, standards and/or recommendations of the
Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The
carrier of the infrastructure must provide, at any time upon request by Council,
written certification to demonstrate compliance with this condition. The written
certification must assume:
a. a maximum number of users over the lifetime of any pole or other
supporting structure
b. full power usage
c. a maximum down tilt of antennae.
7. Warning information signs and security fencing must be provided on the site to
prevent unauthorised entry. Fencing must be camouflaged through the use of
colours, materials and screening vegetation to blend the fence into the visual
landscape.
Colours and Finishes
8. The monopole and associated panels must be finished in colours that blend in
visually into the landscape.
Cessation of Use
9. The telecommunications facility must be removed from the site upon cessation
of the use.
Landscaping Plan
10. Dense screening vegetation shall be established around the enclosure in
accordance with Council’s Policy on Landscaping Guidelines and a properly
prepared landscape plan. Such landscaping is to be completed prior to the
commencement of the use and maintained at all times thereafter. The
Landscape Plan shall include at a minimum:
a. Identify and retain all existing trees within a 100m distance around the
fenced compound area of the tower. Existing trees shall not be lopped or
pruned below their existing height.
b. Appropriately selected tree species and understorey plantings to achieve
dense visual screening of the tower and having regard to the soil
conditions. Trees included shall be able to achieve up to 20m in mature
height, though inclusion of fast growing species is also desirable to
achieve early visual screening.
c. The planting areas should maximise the screening opportunities
surrounding the tower and include appropriate planting for a distance up
to 20m beyond the perimeter of the lease area, whilst maintaining access
and electricity supply.
A development application for Operational Works shall be required in this
regard.
Roadworks
11. The developer must provide an access driveway extending from the end of the
existing driveway servicing 66 Mountain View Road to the site of the
telecommunications tower. The works must be undertaken in accordance with
an Operational Works approval and must include:
a. A formation sufficient to cater for the vehicle types expected during the
construction and operational phases of the development
Page 7 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.