Cover Letter - Minor Change Application (OPW)
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the approved
plans of development. The approved plans are listed in the following table unless otherwise amended
by these conditions.
Plan No. Rev. Plan/Document Name Date
3045-004 BA Development Layout Plan 24 August 2022
24-0608-C3 Prepared by Contour Lindsay Consulting 15 October 2024
3045-005 BA Bulk Earthworks Plan 24 August 2022
24-0608-C4 Prepared by Contour Lindsay Consulting 15 October 2024
3045-006 BA Earthworks Sections 24 August 2022
24-0608-C5 Prepared by Contour Lindsay Consulting 15 October 2024
3045-009 BA Access Driveway and Stormwater Drainage 24 August 2022
24-0608-C6 Details 15 October 2024
Prepared by Contour Lindsay Consulting
3045-010 BA Access Driveway Longitudinal Section 24 August 2022
24-0608-C7 Prepared by Contour Lindsay Consulting 15 October 2024
3045-011 BA Access Driveway Cross Sections 24 August 2022
24-0608-C8 Prepared by Contour Lindsay Consulting 15 October 2024
3045-012 BA Stormwater Drainage Longitudinal Sections 23 September
24-0608-C3 Prepared by Contour Lindsay Consulting 2022
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not substantially
started by 1 November 2024 2026, unless an application to extend the currency period is approved by
Council.
Engineering
12. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. The relevant conditions of the higher order Reconfiguration of Lot approval RAL21/0009.01
to which this approval relates
c. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices to be
constructed on site
Earthworks and Retaining Walls
19. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on
Earthworks for Commercial and Residential Development and be generally in accordance with the
plan titled Bulk Earthworks Plan prepared by Lindsay Consulting Contour’s Earthworks Plan (3045-
005) Revision B dated 24 August 2022.
24. Construction of all internal stormwater drainage works must comply with the relevant section/s of
Australian Standard AS/NZS 3500.3 and be generally in accordance with the plan titled Access
Driveways and Stormwater Drainage Details prepared by Lindsay Consulting Contour’s Access
Driveways and Stormwater Drainage Details Plan (3045-009) Revision B dated 24 August 2022.