Council archive · source document
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published] · 142007.1173
..- 11/05 103 MON 08:48 FAX 07 4936 1708 ROCLA POLES QLD Bo Lifting “Lifting’ is assumed to describe the process of vertically lifting piles, that are resting horizontally, and then moving them to another location. It applies to any handling process after delivery and befere installation. Piles should only be lifted via “two points’. Each lifting point should be located between (0,2 x pile length) to (0.17 x pile length) from each end. This arrangement minimises the induced pile stresses. Minor dynamic effects are assumed. eg for a 21m length pile, each lifting point should be located between 4.2m to 3.6m in from each end, Lifting can be done via a lifting beam or, if appropriate, with spreader chains. Nylon slings ere recommended as the contact material to avoid damaging the surface of the pile. Page 6 of 9 ween
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.