7.1 Earthworks
The earthwork and filling for the prescribed
tidal work is consistent with each relevant
planning scheme standard.
No earthworks or filling is required as the
existing platform of the boat house is
Proposed to be retained.
7.2 Vegetation
The vegetation is the tidal water, under within
or over which the prescribed tidal work is
located, or on land under the tidal water, is
Cleared or disturbed in a way consistent with
each refevant planning scheme standard.
No vegetation is required to be removed.
8.1 Public Access -
availability
The design and construction of the prescribed
tidal work is consistent with the following
standards-
(a) prescribed tidal work does not involve the
erection of placement of any physical barrier
preventing existing access, along a public
accessway, to the foreshores near the work;
(a) As the proposal! seeks to refurbish an
existing structure, public access is retained to
the foreshores near the work.
9.1 Public Access —
Safety
Public access to foreshores near the
prescribed tidal works is consistent with each
relevant planning scheme standard.
Public access is retained to the foreshores
hear the proposed works. Itis noted that
gates, balustrading and appropriate signage
will be erected ensuring access onto the
pontoon is provided only for staff and
customers.
10.1 Navigable
access to, or
egress from, non
tidal work lots
The design and construction of the prescribed
tidal work is consistent with the following
standards-
(a) if the lot connected to prescribed tidal
work adjoins a non-tidal work lot, the work
does not extend past the connected lot's side
boundary, or extended side boundary,
adjoining the non-tidal work lot.
(a) The proposed development ensures all
access to connecting lots is maintained,
11.1 Infrastructure,
including,
access, parking,
sewerage &
water services
Prescribed tidal work has appropriate
infrastructure, including, in particular road
access, parking facilities, sewerage services
and water services, having regard to- -
(a) the nature and scale of the work; and
(0) the number of people that may be on or at
the work at any time; and
{c) the number of vehicles that may be on or
moored at the work at any time;
(d) the protection of any foreshores near the
work and the vegetation and marine plants on
the foreshores.
The proposal seeks to: refurbish an existing
boat house. The refurbishment will not
increase the nature and scale of the existing
commercial operations, the number of
customers or staff, or the number of vessels
currently operating within the lease area,
12.1 Design,
construction &
safety
The design and construction of the prescribed
tidal work is consistent with the relevant
Australian Standards.”
The engineering specifications of the
proposed pontoons and concrete marina
piles are included as Attachment 2.
Conditions may be recommended ensuring
the refurbishment of the existing boat house
is undertaken in accordance with the relevant
Australian Standards.
12.3 Design,
construction &
The design and construction of the prescribed
tidal work is consistent with the following
standards-
(a) prescribed tidal work does not cause, by
changing the flow of water, the removal of, or
disturbance to, the sediment on the bed and
As the proposal does not seek to alter the
boat house footprint (ie. all support piers to be
retained), it is not considered that this work”
will impact upon the bed or banks of the tidal
water. .
The removal of the existing fixed jetty (ie. 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.