07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published] · 142007.1173
@ Page6 Section 3 of the original submission dated 14 June 2007 indicates that “the proposed works will remove all of these support piles (with the exception of two concrete piles), replacing them with 9 concrete piles”. It is now proposed to remove all of the timber support piles, and replace them with only 2 concrete piles. These are necessary for securing the pontoons. We hope that this code assessment and associated engineering specifications provide sufficient information to allow Council staff to undertaken a complete consideration of the safety and environmental benefits of the proposal. Please contact our Sunshine Coast office should you have any further queries. Yours faithfully Hannah Blue Senior Planner Martoo Consulting Pty. Ltd. cc. Heritage Jetties
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1173 - Operational Works - Transport Type 6 - Refurbishment of Boathouse & Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.