Planning Report (004)
proposal report
4.0 Proposed Development Details
The existing building on site is outdated, has a poor internal layout and in need of renovation. The
applicant therefore proposes to upgrade, renovate and extend the existing commercial building on
site and use it for commercial purposes. The proposed works include:
Ground floor:
o Removal of two ground floor toilets and replacement with new external deck along
front and side of building
o Replacement of existing ramp with stairs to upper level
o New pedestrian ramp to front of site
o New awning to Weyba Road (replace existing fabric awning)
o New stairway to Swan Street
o Removal of
First floor::
o Internal renovations and rearrangement
o New floor area of 79m2
o New deck
o New internal lift
Upgrade landscaping around site
New bike parking on site
Relocated and additional bin area provide underneath stairs
Seal existing driveway and carparking area
The external appearance of the building is to be completely renovated with the following design
details:
North and eastern elevations to incorporate vertical metal screens
Western elevation to include fibro cement blades to upper level windows
New hoods to roof line
New bi-fold doors to ground floor
New windows to front of building
Proposal plans prepared by Andrew Bock Architecture are included in Appendix A
Table 3: Summary of development aspects
Material change of use
Building height 9.3metre
Gross floor area (GFA) 79m2
Car parking Existing 5 carparking spaces to remain
Bicycle parking 10 bicycle spaces
Site access Existing access from Swan Street to be
maintained.
martoo consulting
town planners + urban designers + development managers page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.