Original source · versioned page text
Attachment 1 - RECOR RFI Cover Letter Response_20210216
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
DRAINS Modelling Results - Proposed Site Project number: 20210216 Calculations: B. Parry Street Address: 62 Gateway Drive Locality: Noosaville, NSC Date: 26/09/2022 Site Pre-Post Comparison Current Conditions (10 min Tc) A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.042 0.067 0.025 60% 0.5 EY 0.053 0.084 0.031 58% 0.2 EY 0.079 0.106 0.027 34% 10% AEP 0.096 0.123 0.027 28% 5% AEP 0.114 0.140 0.026 23% 2% AEP 0.134 0.160 0.026 19% 1% AEP 0.146 0.175 0.029 20% Site Pre-Post Comparison 2100 Conditions (10 min Tc) A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.050 0.080 0.030 60% 0.5 EY 0.069 0.102 0.033 48% 0.2 EY 0.095 0.128 0.033 35% 10% AEP 0.118 0.148 0.030 25% 5% AEP 0.138 0.168 0.030 22% 2% AEP 0.161 0.192 0.031 19% 1% AEP 0.176 0.210 0.034 19%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.