Skip to the record
Search everything, all in one place.

Original source · versioned page text

DA Form 1 & Plans

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

 

 

 

 

 

 

 

 

 

 

 

feyelacee
Intended use of parts created | Residential Commercial Industrial Other, please specify:
Number of parts created
Bo cy 3
cS e e€ e Gg proposed a cS or €a 0 1@) e| e pre
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment?

 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)

Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?

CO Road work (1 Stormwater CD Water infrastructure

 
        
  
     
    
   
  
   

 

   
 
 

C1 Drainage work OC Earthworks CO Sewage infrastructure
(Landscaping CJ Signage C1 Clearing vegetation
(J Other — please specify: Drive@w

 

14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
(1 Yes — specify number of new lots:

No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)

$10,000 —

PART 4 —- ASSESSMENT MANAGER DETAILS

 

  
    

15) Identify the assessment manager(s) who will be assessing this development application

 

16) Has the local government agreed to apply a superseded planning scheme for this development application?

CJ Yes — a copy of the decision notice is attached to this development application
CJ The local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

[No

Page 5
DA Form 1 — Development application details
Version 1.3— 28 September 2020
Log in to download the original file

DA Form 1 & Plans.pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.