OPW15/0142 - Decision Notice
Officer: Monkeith Kadhum Direct Telephone: 07 53296293 Our Reference: OPW15/0142 Your Reference: 1303 14 October 2015 Callaghan & Toth Consulting Engineers Pty Ltd Po Box 2305 NOOSA HEADS QLD 4567 [email protected] Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 12 October 2015, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: OPW15/0142 Street Address: 20 Topaz St COOROY QLD 4563 Real Property Description: Lot 102 SP 236318 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work – Stormwater Drainage Works, Earthworks, Driveway, Car Parking and Landscaping. 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1303-10 C Site Plan, prepared by Callaghan & Toth 09/2015 1303-11 C Overall Civil Works Plan, prepared by Callaghan & Toth 09/2015 1303-12 C Carpark Layout Plan, prepared by Callaghan & Toth 09/2015 1303-13 B Driveway & Lower Carpark Longitudinal Section, prepared by Callaghan & Toth 07/2015 1303-14 B Driveway & Lower Carpark Cross Sections, prepared by Callaghan & Toth 07/2015 1303-15 B Lower Carpark Cross Sections, prepared by Callaghan & Toth 08/2015 1303-16 B Upper Carpark Longitudinal Section, prepared by Callaghan & Toth 08/2015 1303-17 B Upper Carpark Cross Section, prepared by Callaghan & Toth 08/2015 1303-18 C Overall Stormwater Drainage Plan, prepared by Callaghan & Toth 09/2015 1303-19 C Stormwater Drainage Plan, prepared by Callaghan & Toth 09/2015 1303-21 C Bioretention Detail Plan, prepared by Callaghan & Toth 09/2015 CS01 C COVER SHEET-LANDSCAPE PLANS prepared by SYNC Landscape Design 07/09/2015 LP01-124 C PLANTING PLAN 1-NEW ENTRY ROAD & BIO-BASIN prepared by SYNC Landscape Design 07/09/2015 LP02-124 C PLANTING PLAN 2-NEW BUILDING SURROUNDS prepared by SYNC Landscape Design 07/09/2015 LP03-124 C PLANTING PLAN 3 & BUILDING FRONTAGE prepared by SYNC Landscape Design 07/09/2015 DT01-124 C STREET TREE PLANTING & CONSTRUCTION DETAILS prepared by SYNC Landscape Design 07/09/2015 PRIOR TO COMMENCEMENT OF WORKS Engineering Tree protection fencing must be installed where required to ensure the protection of trees that may be impacted on by the work activity. All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting. A condition report of the existing drainage system within the works areas must be completed for agreement at the prestart meeting. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties. A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Proposed fencing to the site during the construction phase of the development. Adequate parking arrangements for construction workers. No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Parked trucks must have engines turned off. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Works programme identifying key components of the works and their respective durations Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues identification of complaint management procedures including: Contact details for the on-site manager. Dispute resolution procedures. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice The relevant conditions of the higher order Material Change of Use approval Reference No: MCU13/0030.01 to which this approval relates. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Roadworks (External Roadworks & Road Widening Works) All pavement widening or construction of new pavement must join neatly to the existing pavement so that there are no irregularities in line or level resulting at or adjacent to the join for the length of the construction. Where necessary the existing pavement must be brought to a satisfactory standard to allow for the above. All street and public parking surfacing must consist of a minimum depth of 30mm of an approved hot mixed asphaltic concrete. Pavement Design and Construction The pavement designs shown on the engineering drawings are not approved. To attain approval for the pavement design, the following details must be submitted and certified by an RPEQ with the proposed pavement design: The design CBR must be based on the four day soaked CBR value for the subgrade material. The design subgrade CBR must be representative of each homogenous insitu section of finished subgrade. With respect to each section: For four or less test results, the design CBR must be taken as the least estimated insitu CBR result. For five or more test results, the design CBR must be taken as the 10th percentile of all estimated insitu CBR results The samples must be taken generally in the position of the outer wheel path on both sides of the proposed road. A sketch plan showing the location of all tests must be submitted with the test results for pavement design approval Where imported material has been (or is proposed to be) used for subgrade replacement, and the depth of the imported material is less than 300mm, the pavement design CBR must be based on the testing results of the insitu material and not the imported material. At the time of subgrade inspection, the subgrade must exhibit no visible signs of deformation under proof rolling by a fully loaded water truck. The pavement subgrade will not be passed until this requirement has been achieved. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve – Reinstatement Works Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath or road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road, verge and footpath profiles. The redundant swale near the northwest corner of the site must be reinstated to match the existing grassed verge. The associated redundant stormwater culvert under the concrete footpath must also be removed and/or blocked and surrounding area be reinstated to Council’s satisfaction. The grassed verge should generally have a maximum crossfall of 5%, except in the location of a pathway where the maximum crossfall is to be 2.5%. Pathways All pathways must: Be generally in accordance with the approved plans. Be in compliance with Standard SEQ Drawing R-065. Terminate in a manner that ensures smooth transition to existing surfaces for public safety. Include any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Have a slip resistant surface. Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard and the relevant sections of AS1428 Design for access and mobility. Site Access and Driveway Driveway crossovers must be constructed in accordance with the approved plans and be generally in compliance with Standard Drawing SEQ R-051. Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development. Fall protection must be provided to retaining walls that are over 1m high. Slope and batters shall generally have maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Water Sensitive Design Prior to the final inspection, the supervising RPEQ must certify that all hardstand areas of the development drain to a bioretention device are designed and constructed in accordance with all relevant conditions of this approval, the Water by Design Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ Standard Drawing WSUD-drawing series and Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). During construction and establishment of the bioretention devices, the supervising RPEQ must certify forms contained in section 3.15 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). These forms and certification must be submitted to council prior to commencement of use. The active filter media of the bioretention device and the bioretention swale must be 36m2 and 28m2 respectively. Active filter media area is the area of the bioretention basin surface that is not covered by any impermeable structure such as a sediment forebay, riser, etc. A construction hold point with a council delegate must be established once the bioretention device underdrainage pipe work is installed. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled onsite accompanied by laboratory results that demonstrate that the media complies with the specifications contained in the latest version of the Guidelines for Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity of 180mm/hr or as specified on the approved engineering plans will be achieved. The drainage layer, transition layer, and filtration media materials shall not be installed until the catchment draining to the bioretention device has 80% groundcover as determined by council’s delegate. 80% of the catchment flowing to the bioretention basin must be effectively stabilised prior to the construction holdpoint for the Bioretention device. Bioretention Devices - Landscaping Landscape plans must include a mixture of at least five of the following species for planting in the bioretention basin extended detention surface at a minimum density of 8 plants/m2: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Landscape plans for the areas surrounding the bioretention basin filter media footprint must be arranged to minimise shading to the filter media footprint are. Suitable plants include the following: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Banksia robur Dianella brevipendunculata Themada triandra Cymbopogan refractus Melaleuca thymifolia Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be installed to the interface between the landscape/garden/forest area and the bioretention basin to prevent root intrusion to the biobasin infrastructure. Landscaping to the surface of the bioretention basin filter media area must not commence until 80% of building work within each contributing catchment is complete or after 3 years, whichever occurs first. An uncompleted works bond of 150% of the value of the planting to the surface of the bioretention basin filter media area must be provided to Council prior to the final inspection. Where required, mulch within the batters of bioretention basins must be installed in a manner that it will not escape into receiving stormwater drainage infrastructure or water courses. Bioretention Devices - Education The development shall be provided with approved permanent signage to educate the public on the function of the bioretention basin. The wording for the signage for each bioretention basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways by reducing the amount of heavy metals, litter, suspended solids, and nutrients discharged to Mary River”. Erosion & Sediment Control A construction hold point with a council delegate and supervising RPEQ must be established prior to commencement of cut to fill earthworks for each stage of the development. The hold point must be held as soon as reasonably practical and prior to the first rain event forecast following initial tree clearing or removal of soil stabilising material for each stage. At the hold point inspection, all required sediment basins, drains and bunds to divert waters away from disturbed soil or soils about to become exposed through cut to fill activities must be installed. All areas that will not require earthworks in the imminent cut to fill operation must be stabilised to prevent entrainment of sediments into receiving waters. Cut to fill earthworks must not commence until after the Supervising RPEQ has certified that all installed erosion and sediment controls required by this approval are sized in accordance with conditions of the approval and the written acceptance of the certification is provided to the supervising RPEQ by Council officers. Offsite run-off must be diverted around exposed soils on the site without entraining additional sediments. Discharge from measures to divert the offsite water must not cause run-off impacts to other properties. Measures installed to divert the upstream water must be designed and certified by the supervising RPEQ and installed prior to commencement of bulk earthworks. Any temporary drainage works to manage stormwater flows during the construction phase of development must be designed by the supervising RPEQ to provide a 150mm freeboard and convey the following flow capacities without resulting in visible scour within flow paths: 1 in 2 year event where disturbed area open for less than 12 months 1 in 5 year event where disturbed area open for 12-24 months 1 in 10-year ARI event where disturbed area open for 24 months Minimum 1 in 1 year ARI Hydraulic capacity for temporary culvert crossings E&SC measures must be installed and maintained to ensure any waters discharged from the site up to and including a 85%ile 5 day rain event (or 46mm rainfall event) contain less than 50mg Total Suspended Solids per litre. All relevant measures detailed in the International Erosion and Sediment Control Book 2008 or Sunshine Coast Manual for Erosion and Sediment Control must be installed to minimise the amount of sediment leaving the site in rainfall events that exceed 85%ile 5 day or 46mm. Peak 1-year ARI event discharge from the construction phase of development must be equivalent to the pre-development peak 1-year ARI event discharge. Measures included in calculations to achieve management of peak flows must be incorporated into the development in a manner that is consistent with the Noosa Plan, all conditions of the approval and does not interfere with adjoining properties. Prior to the completion of the development, all site surfaces must be effectively stabilised. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Landscaping Landscaping must be located in a position that will not adversely affect Council infrastructure or access. Landscape works must not interfere with vehicle and pedestrian sight distances. All landscaping to be planted and maintained in accordance with Planning Scheme Policy 3 – Landscaping Plants and Guidelines. Grassed areas must be: Rolled, top dressed and joined smoothly with adjoining surfaces. Of species sustainable for local and design conditions and do not require irrigation. Free of disease, pest, weeds, rock and debris. New street tree planting must: Meet NATSPEC Guidelines: Specifying Trees requirements for quality. Be pruned in accordance with AS 4373, Pruning of Amenity Trees. Be of the approved plan species. Be pest and disease free. Prior to felling or pruning, all trees are to be checked for wildlife. If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree. Vegetation removal or pruning must be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Removed vegetation is to be processed by one of the following methods: Processing through a wood-chipper. Disposed of in a council approved refuse tip. Used for landscaping purposes. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. As Constructed Plans Prior to acceptance of civil works to become Council assets “On Maintenance”, the lodgement of satisfactory “As Constructed” records must be submitted to Council. The “As Constructed” information must include: Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to the cadastre and the location, level and type of all services and structures. The data must be in accordance with Council’s – Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks, and fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data must be submitted in hardcopy form and digital format (Asset Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines on the use of ADAC are available at www.adac.com.au. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: Certification that all works have been undertaken and completed in accordance with the requirements of this Permit. As Constructed details in accordance with Council’s Planning Scheme Policy. Maintenance and operational manuals for all proprietary or site specific devices. Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: A Council inspection reveals works do not comply with approval requirements. Submitted certification falsely states works comply with approval requirements. 5. REFERRAL AGENCIES Not Applicable. 6. REFERENCED DOCUMENTS Not Applicable. 7. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. On and Off Maintenance Inspections Request If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise. Environmental Advisory Note The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. 8. PROPERTY NOTES The following property notes will be placed against the subject property in Council’s property record system: This site is provided with stormwater quality treatment devices which capture and store pollutants from stormwater runoff generated on the site. These devices are required to be routinely checked and serviced/cleaned out as per Maintaining Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of maintenance activities undertaken are to be kept and made available to council officers upon request. 9. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Not Applicable 11. SELF ASSESSABLE CODES Not Applicable. 12. SUBMISSIONS Not Applicable. 13. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 14. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 15. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Monkeith Kadhum Development Engineer Enc: Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 3 of 15 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 15 [word/header1.xml] OPW15/0142 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0142 - Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 114 KB (small file)
- File type
- DOCX
No other editions are linked here.