Council archive · source document
Minor Change Existing Approval MCU10 2017 01 [As Published] · MCU10/2017.01
Officer: Matthew Pinese
Direct Telephone: 07 53296316
Our Reference: MCU10/2017.01
Your Reference: 002789.1
17 December 2024
Halse Lodge Backpackers Noosa Beach
C/- RG Strategic Australia
PO Box 1818
NOOSA HEADS QLD 4567
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 7 August 2024, requesting a minor change to an existing
development approval. Council on 12 December 2024, decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU10/2017.01
Street address: 2 Halse Lane, Noosa Heads Qld 4567
Real property description: Lot 2 on RP865533
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 22 December 2010
• Development Permit for Material Change of Use of Premises – Visitor Accommodation –
Type 4 (Visitor Hostel)
In relation to the request to make a minor change to the existing approval, Council on 12 December
2024, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend conditions 1 and section 6.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
This development approval is subject to compliance with the following Assessment Manager
conditions:
Planning
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions.
Plan Rev Plan Name Date
D-C00300-01-C C Material Change of Use, Extension to Existing 26/08/2010**
Guest House – Martoo Consulting
**
Annotations
dated – 22
December
2010
00-05 - Site Plan – Rainforest Lodge, prepared by T. 01.07.24
Black
10-01.7 - GA Plan - Rainforest Lodge, prepared by T. 01.07.24
Black
20-00 - Exterior East & South Elevations - Rainforest 01.07.24
Lodge, prepared by T. Black
20-01 - Exterior West & North Elevations - Rainforest 01.07.24
Lodge, prepared by T. Black
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Visitor accommodation on the site is restricted to a maximum of 107 beds.
Relevant Period
4. The Development Permit for a material change of use of premises lapses if the use has not
happened by 22 December 2014, unless an application to extend the relevant period is
approved by Council.
Building Design
5. External lighting associated with the use shall be designed, installed, operated and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of
Outdoor Lighting.
End of Trip Facilities
6. Secure bicycle racks shall be provided on site to accommodate a minimum of 20 bicycles.
The proposed bicycle racks shall be located in an accessible position on-site, to the
reasonable satisfaction of Council.
Advertising Signage
7. Any advertising sign or device is to comply with Council's policies on advertising.
8. All signage and entrance statements are to be located entirely within privately owned land.
Page 2 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 3
Civil Engineering
Vehicle Access / Car Parking
9. Access and carparking shall be provided within the site generally as shown on drawing
number D-C00300-01-C prepared by Martoo Consulting dated 26 August 2010, except as
modified herein.
10. The access, carparking and manoeuvring area at the north-eastern corner of the site
accessed from Morwong Drive must be designed by an RPEQ and be in accordance with
Council’s Codes and Planning Scheme Policies. Plans of the access, carparking and
manoeuvring area must be included with the Building Works application for the site.
Certification of the completed access, carparking and manoeuvring area provided by an
RPEQ must be submitted to Council prior to the issue of a Form 21 for Building Works.
11. The one additional carparking bay in the northeast corner of the site shall be used exclusively
as a staff bay.
12. All staff carparking spaces shall be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
13. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Vegetation Protection & Preservation
14. Vehicular pavements within the drip zone of any of the existing trees on site which are to be
retained, shall be designed as a pervious pavement (such as grass paving cells or similar),
as this will allow water that falls on this surface to penetrate to the trees root system. The
pavement shall be constructed so as not to damage the tree or their root system and in this
regard temporary fencing shall be provided around the trees during construction to help
protect them.
15. Where retained tress are located in areas proposed to filled on site (or are located on
neighbouring allotments to the actual site to be filled), there will be a need to prevent
excessive fill material from being placed on the trees root system. To this end the design of
the filling works will need to incorporate terracing around the tree or a similar means of
ensuring that the natural ground level around the trees remains generally the same as
existing.
Roof Water & Stormwater Drainage
16. Stormwater runoff from the buildings and carparking areas must be controlled within the site
and discharged without causing scour or damage to the site, any adjoining property, and
Council infrastructure.
Earthworks
17. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
18. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences, structures or existing trees on the site and on the border of the development site.
Erosion and Sediment Control
19. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, plan detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
Pollution on your Building Site dated 2006” are required to be submitted with the application
for a Building Works Permit.
Page 3 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 4
General
20. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
21. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
22. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Infrastructure Contributions
23. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(d) Council Policy – Rural Roadworks Contributions;
(e) Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Unitywater
Town Water & Sewerage
24. The fire-fighting demand on Unitywater’s water supply system from the development must
not exceed 30 litres per second.
25. A single Unitywater installed primary water meter must be provided immediately inside the
property boundary. Additional water meters must be installed for each title of a community
title or sub-lease scheme. Meters must be Unitywater approved, installed in accordance with
Unitywater requirements and remain accessible at all times for reading and maintenance
purposes.
26. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Page 4 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 5
5. REFERRAL AGENCY CONDITIONS
Referral Trigger Referral Status Referral Agency Referral Address
Within 400m of a Concurrence Department of North Coast
Public Transport Transport and Main (Gympie)
Centre Roads
PO Box 183
GYMPIE QLD 4570
Material Change of Advice Ecoaccess Customer
Use – Land in or near Department of Service Unit,
wetland Environment and
PO Box 15155
Resource
Management CITY EAST QLD
4002
6. APPROVED PLANS/DOCUMENTS
The approved plans for this development approval are listed in the following tables:
Approved Plans
Plan Rev Plan Name Date
D-C00300-01-C C Material Change of Use, Extension to Existing 26/08/2010**
Guest House – Martoo Consulting
**
Annotations dated
– 22 December
2010
00-05 - Site Plan, prepared by T. Black 01.07.24
10-01.7 - GA Plan Rainforest Lodge, prepared by T. 01.07.24
Black
20-00 - Exterior East & South Elevations - Rainforest 01.07.24
Lodge, prepared by T. Black
20-01 - Exterior West & North Elevations - Rainforest 01.07.24
Lodge, prepared by T. Black
7. ADVISORY NOTES
These Advisory Notes do not form part of this approval or the conditions attached thereto. The
following Advisory Notes are intended to provide guidance to the applicant where necessary and
inform the applicant of actions that Council may take with respect to the development site or the
approval:
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities.
Your attention is also directed to the fact that in addition to the requirements of the Building Code
of Australia – Part D3 as they relate to people with disabilities, one or both of the following may
impact on the proposed building work:
(a) The Disability Discrimination Act 1992 (Commonwealth)
(b) Anti-Discrimination Act 1991 (Queensland)
Page 5 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 6
Sunshine Coast Regional Council recommends that the following matters be considered to address
equitable access and facilities in the building:
(a) The building and environs should be designed to meet the requirements of the Human Rights
and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2
(b) Applicants should be aware that a “Disability Standard on Access to premises” is currently
being developed and most likely will impose changes on the Building Code of Australia
(c) Any services and facilities in the building complex should allow independent, dignified and
equitable use of the services and facilities for all people.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the activity
does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care.
Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering
the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal
cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
Infrastructure Contributions
1. An advice notice outlining the estimated infrastructure contributions payable and the basis
for their calculation under the current Planning Scheme Policies and Council Policies is
attached with this Development Permit.
2. For properties located in the catchment area for the “Coastal Major Road Network
Infrastructure Charges Plan”, this development permit may trigger an Infrastructure Charge
(if applicable) to be issued in accordance with the Infrastructure Charges Plan and the
“Sustainable Planning Act 2009”.
3. For properties located in the catchment area for Unitywater’s “SEQ Infrastructure Charges
Schedule (Water Supply & Wastewater)”, this development permit may trigger an
Infrastructure Charge (if applicable) to be issued in accordance with the Infrastructure
Charges Schedule and the “Sustainable Planning Act 2009".
4. Please contact Council's Infrastructure Charges Officer (email: [email protected]) a
minimum of 5 business days prior to payment of the infrastructure contributions and/or charge
notice so a payment advice detailing the amounts applicable at the time of payment may be
issued to accompany the payment.
5. Payment of infrastructure contributions and/or infrastructure charge notices will not be
accepted by credit card transaction.
8. PROPERTY NOTES
Not applicable
9. VARIATION APPROVAL DETAILS
Not applicable
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
Page 6 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 7
11. SUBMISSIONS
Not applicable
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully
Matthew Pinese
Development Planner
Enc: Appeal Rights
Approved Plans/Documents
DECISION NOTICE HISTORY
• Original Decision Notice – 29 November 2010.
• Negotiated Decision Notice – 22 December 2010, with an
amendment to conditions 1, 3, 4 and 11.
• Decision Notice - Minor MCU10/2017.01 – 12 December 2024,
with an amendment to condition 1 and item 6.
Page 7 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Page 8
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 8 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Used in these records
Minor Change Existing Approval MCU10 2017 01 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 161 KB (small file)
- File type
No other editions are linked here.