Minor Change Existing Approval MCU10 2017 01 [As Published] · MCU10/2017.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                             Officer:            Matthew Pinese
                                                             Direct Telephone:   07 53296316
                                                             Our Reference:      MCU10/2017.01
                                                             Your Reference:     002789.1

               17 December 2024


               Halse Lodge Backpackers Noosa Beach
               C/- RG Strategic Australia
               PO Box 1818
               NOOSA HEADS QLD 4567
               [email protected]



               Dear Sir/Madam,
                                             Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 7 August 2024, requesting a minor change to an existing
               development approval. Council on 12 December 2024, decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU10/2017.01

                   Street address:              2 Halse Lane, Noosa Heads Qld 4567

                   Real property description:   Lot 2 on RP865533

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 22 December 2010
               •       Development Permit for Material Change of Use of Premises – Visitor Accommodation –
                       Type 4 (Visitor Hostel)
               In relation to the request to make a minor change to the existing approval, Council on 12 December
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend conditions 1 and section 6.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                        PO Box 141
               noosa.qld.gov.au                                                                   Tewantin QLD 4565
               [email protected]                                                                   07 5329 6500
                                                                                                             Page 1 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
Full text of the other 7 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               This development approval is subject to compliance with the following Assessment Manager
               conditions:
                      Planning
                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table and may
                      be amended by these conditions.

                                       Plan   Rev                   Plan Name                               Date
                        D-C00300-01-C          C    Material Change of Use, Extension to Existing 26/08/2010**
                                                    Guest House – Martoo Consulting
                                                                                                  **
                                                                                                     Annotations
                                                                                                     dated – 22
                                                                                                     December
                                                                                                     2010
                                00-05          -    Site Plan – Rainforest Lodge, prepared by T. 01.07.24
                                                    Black
                               10-01.7         -    GA Plan - Rainforest Lodge, prepared by T. 01.07.24
                                                    Black
                                20-00          -    Exterior East & South Elevations - Rainforest 01.07.24
                                                    Lodge, prepared by T. Black
                                20-01          -    Exterior West & North Elevations - Rainforest 01.07.24
                                                    Lodge, prepared by T. Black
               2.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               3.     Visitor accommodation on the site is restricted to a maximum of 107 beds.
                      Relevant Period
               4.     The Development Permit for a material change of use of premises lapses if the use has not
                      happened by 22 December 2014, unless an application to extend the relevant period is
                      approved by Council.
                      Building Design
               5.     External lighting associated with the use shall be designed, installed, operated and
                      maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of
                      Outdoor Lighting.
                      End of Trip Facilities
               6.     Secure bicycle racks shall be provided on site to accommodate a minimum of 20 bicycles.
                      The proposed bicycle racks shall be located in an accessible position on-site, to the
                      reasonable satisfaction of Council.
                      Advertising Signage
               7.     Any advertising sign or device is to comply with Council's policies on advertising.
               8.     All signage and entrance statements are to be located entirely within privately owned land.




                                                                                                       Page 2 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 3

                      Civil Engineering
                      Vehicle Access / Car Parking
               9.     Access and carparking shall be provided within the site generally as shown on drawing
                      number D-C00300-01-C prepared by Martoo Consulting dated 26 August 2010, except as
                      modified herein.
               10.    The access, carparking and manoeuvring area at the north-eastern corner of the site
                      accessed from Morwong Drive must be designed by an RPEQ and be in accordance with
                      Council’s Codes and Planning Scheme Policies. Plans of the access, carparking and
                      manoeuvring area must be included with the Building Works application for the site.
                      Certification of the completed access, carparking and manoeuvring area provided by an
                      RPEQ must be submitted to Council prior to the issue of a Form 21 for Building Works.
               11.    The one additional carparking bay in the northeast corner of the site shall be used exclusively
                      as a staff bay.
               12.    All staff carparking spaces shall be clearly defined by line marking each space with the words
                      “Staff Parking Only” and by sign posting each space with a similar wording.
               13.    All carparking shall be kept, maintained and line-marked in a condition fit for use.
                      Vegetation Protection & Preservation
               14.    Vehicular pavements within the drip zone of any of the existing trees on site which are to be
                      retained, shall be designed as a pervious pavement (such as grass paving cells or similar),
                      as this will allow water that falls on this surface to penetrate to the trees root system. The
                      pavement shall be constructed so as not to damage the tree or their root system and in this
                      regard temporary fencing shall be provided around the trees during construction to help
                      protect them.
               15.    Where retained tress are located in areas proposed to filled on site (or are located on
                      neighbouring allotments to the actual site to be filled), there will be a need to prevent
                      excessive fill material from being placed on the trees root system. To this end the design of
                      the filling works will need to incorporate terracing around the tree or a similar means of
                      ensuring that the natural ground level around the trees remains generally the same as
                      existing.
                      Roof Water & Stormwater Drainage
               16.    Stormwater runoff from the buildings and carparking areas must be controlled within the site
                      and discharged without causing scour or damage to the site, any adjoining property, and
                      Council infrastructure.
                      Earthworks
               17.    Filling works required on site shall be carried out in accordance with Council’s Planning
                      Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
                      ponding of water on any adjoining lands or the blockage of, or interference with, any natural
                      watercourses.
               18.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
                      fences, structures or existing trees on the site and on the border of the development site.
                      Erosion and Sediment Control
               19.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard, plan detailing the methods of controlling erosion and sediment in accordance
                      with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
                      Pollution on your Building Site dated 2006” are required to be submitted with the application
                      for a Building Works Permit.



                                                                                                        Page 3 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 4

                      General
               20.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               21.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.
               22.    The transportation of all materials to and from the site shall be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying materials either to
                      or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
                      Infrastructure Contributions
               23.    The applicant must pay contributions towards trunk infrastructure in accordance with the
                      following Planning Scheme Policies and Council Policies:
                      (a)    Planning Scheme Policy 12 – Public Open Space Contributions;
                      (b)    Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
                      (c)    Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
                      (d)    Council Policy – Rural Roadworks Contributions;
                      (e)    Council Policy – Master Drainage Contributions.
                      For material change of use of premises approvals the contributions must be paid prior to the
                      commencement of use, for reconfiguring a lot approval contributions must be paid prior to
                      Council approval of the plan of subdivision.
                      The actual amount of the contribution must be calculated and paid in accordance with the
                      Planning Scheme Policies and variations due to indexation current at the time of payment.
                      Unitywater
                      Town Water & Sewerage
               24.    The fire-fighting demand on Unitywater’s water supply system from the development must
                      not exceed 30 litres per second.
               25.    A single Unitywater installed primary water meter must be provided immediately inside the
                      property boundary. Additional water meters must be installed for each title of a community
                      title or sub-lease scheme. Meters must be Unitywater approved, installed in accordance with
                      Unitywater requirements and remain accessible at all times for reading and maintenance
                      purposes.
               26.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
                      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
                      with repair, replacement or alteration of infrastructure must be met by the applicant.




                                                                                                          Page 4 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 5

               5.      REFERRAL AGENCY CONDITIONS

                    Referral Trigger         Referral Status   Referral Agency          Referral Address
                    Within 400m of a         Concurrence       Department of            North Coast
                    Public Transport                           Transport and Main       (Gympie)
                    Centre                                     Roads
                                                                                        PO Box 183
                                                                                        GYMPIE QLD 4570
                    Material Change of       Advice                                     Ecoaccess Customer
                    Use – Land in or near                      Department of            Service Unit,
                    wetland                                    Environment and
                                                                                        PO Box 15155
                                                               Resource
                                                               Management               CITY EAST QLD
                                                                                        4002

               6.      APPROVED PLANS/DOCUMENTS

               The approved plans for this development approval are listed in the following tables:
               Approved Plans

                        Plan           Rev                     Plan Name                              Date
                D-C00300-01-C          C      Material Change of Use, Extension to Existing 26/08/2010**
                                              Guest House – Martoo Consulting
                                                                                            **
                                                                                               Annotations dated
                                                                                               – 22 December
                                                                                               2010
                       00-05            -     Site Plan, prepared by T. Black                  01.07.24
                       10-01.7          -     GA Plan Rainforest Lodge, prepared by T. 01.07.24
                                              Black
                       20-00            -     Exterior East & South Elevations - Rainforest 01.07.24
                                              Lodge, prepared by T. Black
                       20-01            -     Exterior West & North Elevations - Rainforest 01.07.24
                                              Lodge, prepared by T. Black


               7.      ADVISORY NOTES

               These Advisory Notes do not form part of this approval or the conditions attached thereto. The
               following Advisory Notes are intended to provide guidance to the applicant where necessary and
               inform the applicant of actions that Council may take with respect to the development site or the
               approval:
               Equitable Access and Facilities
               The plans for the proposed building work have NOT been assessed for compliance with the
               requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities.
               Your attention is also directed to the fact that in addition to the requirements of the Building Code
               of Australia – Part D3 as they relate to people with disabilities, one or both of the following may
               impact on the proposed building work:
               (a)     The Disability Discrimination Act 1992 (Commonwealth)
               (b)     Anti-Discrimination Act 1991 (Queensland)




                                                                                                       Page 5 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 6

               Sunshine Coast Regional Council recommends that the following matters be considered to address
               equitable access and facilities in the building:
               (a)    The building and environs should be designed to meet the requirements of the Human Rights
                      and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2
               (b)    Applicants should be aware that a “Disability Standard on Access to premises” is currently
                      being developed and most likely will impose changes on the Building Code of Australia
               (c)    Any services and facilities in the building complex should allow independent, dignified and
                      equitable use of the services and facilities for all people.
               Aboriginal Cultural Heritage Act 2003
               There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
               approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
               The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
               carries out an activity must take all reasonable and practicable measures to ensure the activity
               does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care.
               Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.
               Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering
               the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal
               cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
               You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
               obligations under the ACH Act.
                      Infrastructure Contributions
               1.     An advice notice outlining the estimated infrastructure contributions payable and the basis
                      for their calculation under the current Planning Scheme Policies and Council Policies is
                      attached with this Development Permit.
               2.     For properties located in the catchment area for the “Coastal Major Road Network
                      Infrastructure Charges Plan”, this development permit may trigger an Infrastructure Charge
                      (if applicable) to be issued in accordance with the Infrastructure Charges Plan and the
                      “Sustainable Planning Act 2009”.
               3.     For properties located in the catchment area for Unitywater’s “SEQ Infrastructure Charges
                      Schedule (Water Supply & Wastewater)”, this development permit may trigger an
                      Infrastructure Charge (if applicable) to be issued in accordance with the Infrastructure
                      Charges Schedule and the “Sustainable Planning Act 2009".
               4.     Please contact Council's Infrastructure Charges Officer (email: [email protected]) a
                      minimum of 5 business days prior to payment of the infrastructure contributions and/or charge
                      notice so a payment advice detailing the amounts applicable at the time of payment may be
                      issued to accompany the payment.
               5.     Payment of infrastructure contributions and/or infrastructure charge notices will not be
                      accepted by credit card transaction.
               8.     PROPERTY NOTES

               Not applicable
               9.     VARIATION APPROVAL DETAILS

               Not applicable
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Building Works            All building work.



                                                                                                       Page 6 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 7

               11.      SUBMISSIONS

               Not applicable
               12.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               13.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.
               Yours faithfully




               Matthew Pinese
               Development Planner
               Enc:     Appeal Rights
                        Approved Plans/Documents

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 29 November 2010.
               •     Negotiated Decision Notice – 22 December 2010, with an
                     amendment to conditions 1, 3, 4 and 11.

               •     Decision Notice - Minor MCU10/2017.01 – 12 December 2024,
                     with an amendment to condition 1 and item 6.




                                                                                                       Page 7 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Page 8

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 8 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024

Used in these records

About this file

File size
161 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval MCU10 2017 01 [As Published].pdf · 161 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.