Stormwater Management Plan -
305 Lake Macdonald Drive
Lot 1 on SP108094




                                                                     CLIENT:
                                                                     D’VINERIPE


                                                                     STATUS:
                                                                     FINAL REPORT


                                                                     REPORT NUMBER:
                                                                     SC15-0070\R003370

                                                                     ISSUE DATE:
                                                                     JUNE 2015



O2 ENVIRONMENTAL PTY LTD PO Box 199 Peregian Beach QLD 4573 ABN 79 136 340 924 www.o-2.com.au
Log in to download the original file

Attachment C - Stormwater report.pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 37 pages

Page 2

Important Note
This report and all its components (including images, audio, video, text) is copyright. Apart from fair dealing
for the purposes of private study, research, criticism or review as permitted under the Copyright Act 1968,
no part may be reproduced, copied, transmitted in any form or by any means (electronic, mechanical or
graphic) without the prior written permission of the O2 Environmental Pty Ltd.

This report has been prepared for the sole use of the D’VINERIPE (herein, ‘the client’), for a specific site
(herein ‘the site’, the specific purpose specified in Section 1 of this report (herein ‘the purpose’). This report
is strictly limited for use by the client, to the purpose and site and may not be used for any other purposes.

Third parties, excluding regulatory agencies assessing an application in relation to the purpose, may not
rely on this report. O2 Environmental Pty Ltd waives all liability to any third party loss, damage, liability or
claim arising out of or incidental to a third party publishing, using or relying on the facts, content, opinions
or subject matter contained in this report.

O2 Environmental Pty Ltd waives all responsibility for loss or damage where the accuracy and effectiveness
of information provided by the Client or other third parties was inaccurate or not up to date and was relied
upon, wholly or in part in reporting.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                    Page ii

D’VINERIPE
R003370

Page 3

O2 Environmental Pty Ltd t/as O2 ABN 79 136 340 924
Originating Office – Sunshine Coast
Unit 7, 8 Grebe St, Peregian Beach QLD 4573
PO Box 199 Peregian Beach QLD 4573
T 61 7 5448 3288 | F 61 7 5302 6680 | [email protected]

Version Register

 Version      Status           Author            Reviewer           Change from             Authorised for Release
                                                                    Previous Version
                                                                                            Signature        Date

 -            FINAL            S Chamberlain     K Robson           n/a                                              26-6-15
                               RPEQ (15545)      RPEQ (15954)




Transmission Register

Controlled copies of this document are issued to the persons/companies listed below. Any copy of this
report held by persons not listed in this register is deemed uncontrolled. Updated versions of this report if
issued will be released to all parties listed below via the email address listed.

 Name                                                                Email Address

 Byron Mason                                                         [email protected]




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                              Page iii

D’VINERIPE
R003370

Page 4

Table of Contents
1.     Introduction                                                             6
       1.1.    Objective                                                        6
2.     Site Description                                                         7
       2.1.    Land use                                                         7
       2.2.    Topography                                                       7
3.     Land Use and Nutrient Loads                                              8
       3.1.    Historical Land Use                                              8
       3.2.    Proposed Land Use                                                8
4.     MUSIC Modelling                                                         10
       4.1.    Rainfall Data                                                   10
       4.2.    Evapotranspiration Data                                         10
       4.3.    Regional Modelling                                              11
               4.3.1. Model Objectives                                         11
               4.3.2. Catchment Description                                    11
               4.3.3. Rainfall Runoff Parameters                               14
               4.3.4. Pollutant Export Parameters                              14
               4.3.5. Regional MUSIC Model Layout                              15
               4.3.6. Modelling Results                                        15
       4.4.    Site Specific MUSIC Model                                       16
               4.4.1. Model Objectives                                         16
               4.4.2. Pollutant Export Parameters                              16
               4.4.3. Treatment Options                                        18
               4.4.4. MUSIC Results                                            19
5.     Flooding and Water Quantity Management                                  21
       5.1.    Introduction                                                    21
       5.2.    Catchments                                                      21
       5.3.    Rainfall Intensities                                            21
       5.4.    Hydrologic Modelling                                            22
               5.4.1. Rainfall Losses                                          22
               5.4.2. Roughness Coefficients                                   22
       5.5.    Peak Flow Rate                                                  22
       5.6.    Regional Flooding                                               24
       5.7.    Mitigation Measures                                             25
6.     Erosion and Sediment Control (ESC)                                      26
       6.1.    Erosion Risk Assessment                                         26
       6.2.    Erosion Control and Rehabilitation                              27
       6.3.    Drainage Control                                                28
               6.3.1. Design Standard                                          28
       6.4.    Sediment Control                                                28
               6.4.1. Design Standard                                          28
       6.5.    Roles and Responsibilities                                      29
       6.6.    Corrective and Preventative Action                              29
7.     Summary and Recommendations                                             31
8.     Reference List                                                          33



Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive   Page iv

D’VINERIPE
R003370

Page 5

Figures
Figure 1 - Site Location                                                                                        6
Figure 2 – Pre-Development Topography                                                                           7
Figure 3 – Hydroponic Tomato Setup                                                                              8
Figure 4 – Drip Irrigation System                                                                               8
Figure 5 - Catchment Plan.                                                                                     11
Figure 6 - Land Use Mapping for Catchment (Source QLUMP).                                                      12
Figure 7 - MUSIC Model Layout.                                                                                 15
Figure 8 – Pre- vs Un-Mitigated Post-Development Hydrographs – 1% AEP Event.                                   23
Figure 9 – A Comparison of the Runoff Volumes for the Pre- (left) and Post-Development (right) Scenarios.      24
Figure 10 - 1% AEP Hydrographs - Site vs Regional.                                                             25



Tables
Table 1 – Meteorological and Rainfall Runoff Data.                                                              10
Table 2 – MUSIC Monthly Evapotranspiration Data (mm).                                                           10
Table 3 – Summary of Landuse and Fraction Impervious.                                                           13
Table 4 – Rainfall-runoff Parameters for MUSIC Source Nodes.                                                    14
Table 5 – Pollutant Export Parameters for Urban, Industrial, Mining and Waste, Forest and Agriculture Source Nodes
     (extracted from Table 3.9, Water by Design, 2010).                                                         14
Table 6 – Results from MUSIC Modelling.                                                                         15
Table 7 – Pollutant export parameters for Roof source nodes (extracted from Table 3.8, Water by Design, 2010).  16
Table 8 – Water Quality Objectives.                                                                             16
Table 9 – Bioretention System Input Parameters                                                                  18
Table 10 – Media Filtration Input Parameters.                                                                   18
Table 11 – Infiltration System Input Parameters.                                                                19
Table 12 – MUSIC Modelling Results – Receiving Node                                                             20
Table 13 – IFD Data Applied to Hydrologic Assessment                                                            21
Table 14 – Performance of Mitigation Measures – Peak Flow Rate at LPD                                           23
Table 15 – Erosion Risk Categories                                                                              26
Table 16 – Estimated Soil Loss and Risk Categorisation for Varied Slope Lengths and Grades                      27
Table 17 – Stabilisation Materials                                                                              27
Table 18 – Sediment Control Standard based on Soil Loss Rate                                                    28
Table 19 – Roles and Responsibilities                                                                           29



Appendices
Appendix A     Site Layout (Martoo Drawing Number)                                                              A
Appendix B     Assessment of Historic Nutrient Loads                                                            B




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                    Page v

D’VINERIPE
R003370

Page 6

  1.            Introduction
O2 Environment + Engineering (O2) has been commissioned by D’VINERIPE to develop a Stormwater
Management Plan (SMP) for the tomato farm located at Lot 1 on SP108094, 305 Lake Macdonald Drive,
Qld.

The purpose of this document is to clearly present the SMP specifically designed to address issues raised in
Show Cause Notice COM14/0133, and Information Request 01569 issued by Noosa Council.

The regional location of the project area is presented in Figure 1.

1.1.          Objective
The objective of this report is to address Points 8 and 9 of Show Cause Notice issued by Noosa Council on
April 29, 2015 and Points 3 and 4 of Information Request (IR) issued by Noosa Council on June 25, 2014.
The IR, application number: MCU14/0039, is in response to the proposal for a development permit for
Material Change of Use – Cultivation Type 2 (Intensive Greenhouses).




Figure 1 - Site Location




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 6

D’VINERIPE
R003370

Page 7

 2.            Site Description
This section describes the current land use and topography within and adjacent to the Project area.

2.1.         Land use
The site is currently being used to produce hydroponically grown tomatoes, and contains a greenhouse
with a roof area of approximately 2 ha (the subject of this application). The site layout is included as
Appendix A. There are also two smaller sheds used for equipment and chemical storage located to the
south of the greenhouse.

The area surrounding the site is relatively undeveloped, providing a mixture of land uses. The land to the
north and west is largely rural with few houses dominated by forests and vegetation. There appears to be a
quarry or cement works to the immediate west of the site. There are private residences 1.2 km to the south
and the town of Cooroy is located approximately 3.7 km to the south west. Lake Macdonald and associated
rural residential housing lie immediately to the east. The line of residential dwellings extends north to
south approximately 1.3 km.

2.2.         Topography
The site is generally flat and is bounded on the east and west sides by grassed areas and vegetated creeks.
The topography decreases in elevation moving to the east and west of the site. The greenhouse is located
at the high point on the site, at about 136 m Australian Height Datum (AHD). There is approximately a 1 m
fall across the length of the site moving to the north towards the adjacent watercourse.

The approximate slope of the northern drainage path is 0.3% – 0.5%. Refer to Figure 2 for the existing
contours and indicative flow directions.




Figure 2 – Pre-Development Topography


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 7

D’VINERIPE
R003370

Page 8

 3.            Land Use and Nutrient Loads

3.1.         Historical Land Use
The site was previously approved and used as a turf farm for approximately 30 years where, due to the
activities large quantities of fertilizers and pesticides were employed. Calculations using data provided to
O2 Environment + Engineering by the client show Total Nitrogen and Phosphorus applied at the site (in the
form of fertilizer and pesticide) to be:

         Total Nitrogen - 9.95 tonnes per year, and
         Total Phosphorus - 3.34 tonnes per year

Further details in relation to the assumptions made and calculations undertaken to determine the nutrient
loads are contained in Appendix B.

3.2.         Proposed Land Use
The proposed development seeks a Development Permit for a Material Change of Use for a Cultivation
Type 2 Intensive for crops within a 140 x 144 m greenhouse on the site. The greenhouse will be used to
grow tomatoes hydroponically. The current arrangement contains rows of tomato plants in “growbags”, as
shown in Figure 3. Watering of the plants is undertaken using a drip irrigation system as shown in Figure 4.
Irrigation is typically undertaken at a rate of approximately 4L/m² per day.

Each row of growbags and plants are located in lined trenches, with an ag. pipe collection system below the
growbags to collect any excess water. The ag. pipe conveys excess runoff to a 300mm diameter pipe which
conveys runoff out of the greenhouse to a sump, before returning it to the mixing tank for re-use in the
irrigation system. Therefore, the irrigation system is a closed loop system, with any water not utilised by
the plants being recycled. Therefore, there is no chance that unused effluent associated with the
greenhouse irrigation system can either leach down to groundwater then migrate to the adjoining creek
system.




Figure 3 – Hydroponic Tomato Setup                                 Figure 4 – Drip Irrigation System

Based on the information provided by the operators of the greenhouse, current fertilizer and pesticide use
of the tomato farm are substantially less than the turf farm, being approximately:

         Total Nitrogen - 3.84 tonnes per year, and
         Total Phosphorus – 0.52 tonnes per year.

Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                               Page 8

D’VINERIPE
R003370

Page 9

     In addition to the reduced nutrient loads now being applied at the site, the operators have the ability
     to remove the nutrient rich irrigation water from the greenhouse. Irrigation can be halted, and the
     runoff pumped back to the holding tank. Fresh water can then be used to flush the growbags and again
     pumped back to a holding tank. This can be undertaken within a period of approximately 3 – 4 hours
     and therefore allows the operators to extract the nutrient rich runoff in the event of a major flood
     event.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 9

D’VINERIPE
R003370

Page 10

 4.            MUSIC Modelling
The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) Version 6 was used in
combination with MUSIC Modelling Guidelines Version 1.0 (2010) to evaluate expected pollutant loads
Two models have been developed:

    1. Regional MUSIC Model – used to assess the likely pollutant loads generated within the catchment,
       and
    2. Site Specific MUSIC Model – used to assess the pollutant loads from the greenhouse roof area and
       the required treatment measures to achieve the South East Queensland water quality objectives.

4.1.         Rainfall Data
Stormwater runoff is simulated using historical rainfall data. Data from Nambour DPI, station number
40282, has been used from 1989 - 1998 to represent the climatic period which the MUSIC model is based. A
summary of the meteorological parameters used to simulate climate behaviour are presented in Table 1.
Table 1 - Meteorological and Rainfall Runoff Data.


Input                                                Data Used in Modelling

Rainfall station                                     40282 – Nambour DPI

Time step                                            6 minute

Modelling period                                     1/1/1989 -31/12/1998

Mean annual rainfall (mm)                            1,527

Annual evapotranspiration (mm)                       1,675

Rainfall runoff parameters                           Varies (refer Section 4.3.4 & Section 4.4.2)

Pollutant export parameters                          Varies (refer Section 4.3.4 & Section 4.4.2)
Rainfall runoff and pollutant export parameters included as model inputs are in line with the MUSIC
Modelling Guidelines Version 1.0 (2010).

4.2.         Evapotranspiration Data
Nambour DPI evapotranspiration data was extracted from Table 3.1 of the MUSIC Modelling Guidelines
Version 1.0 (2010), as detailed in Table 2.
Table 2 - MUSIC Monthly Evapotranspiration Data (mm).

   Jan        Feb        Mar        Apr        May           Jun      Jul       Aug       Sep       Oct   Nov   Dec

   204        166        169        125         89           76       78         93       121       168   187   199




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                        Page 10

D’VINERIPE
R003370

Page 11

4.3.         Regional Modelling
4.3.1.       Model Objectives
An assessment of the total catchment conveying runoff to the watercourse that bounds the site has been
undertaken to determine the likely pollutant loads generated within the catchment.

4.3.2.       Catchment Description
Mapping of the catchment reveals the total area contributing runoff to the waterway bounding the site is
approximately 3600 ha, as illustrated by Figure 5. Further assessment of the catchment has been
undertaken using the Queensland Land Use Mapping Program (QLUMP). QLUMP has updated land use
mapping in the South-East Queensland Natural Resource Management Region to 2011 or later. Mapping
has been compiled at the catchment level, to assess the land uses within the catchment and determine the
areas associated with each designated land use. A copy of the QLUMP mapping extract for this catchment
and associated land uses is included as Figure 6.




Figure 5 - Catchment Plan.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                          Page 11

D’VINERIPE
R003370

Page 12

Figure 6 - Land Use Mapping for Catchment (Source QLUMP).



Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive   Page 12

D’VINERIPE
R003370

Page 13

Based on the land uses provided by QLUMP, the catchments have been classified as Agricultural, Forest,
Road, Urban or Mining and waste (user defined) to enable them to be modelled in MUSIC. A summary of
the catchment areas applied to the MUSIC Model is included as Table 3.
Table 3 - Summary of Landuse and Fraction Impervious.

       No                Area (ha)          QLUMP Designation              MUSIC Land use     Fraction Impervious (%)

        1                    31               Cropping - Sugar                Agriculture               0

                                               Grazing native
        2                   942                                               Agriculture               0
                                                vegetation
                                              Intensive animal
        3                    58            production (horse and              Agriculture               5
                                                aquaculture)

        4                    13            Intensive horticulture             Agriculture               0

                                             Irrigated perennial
        5                    24                                               Agriculture               0
                                                 horticulture
                                            Manufacturing and
        6                    30                                               Industrial                80
                                               industrial

        7                    39                    Mining                  Mining and Waste             10

        8                    85             Nature conservation                 Forest                  0

        9                   112              Other minimal use                  Urban                   5

       10                     2            Perennial horticulture             Agriculture               0

       11                    31              Plantation forestry                Forest                  0

       12                   358             Production forestry                 Forest                  0

       13                     2                Reservoir/dam                    Urban                   0

       14                  1860                  Residential                    Urban                   60

       15                    65                   Services                      Urban                   90

                                               Transport and
       16                     8                                                 Road                    50
                                              communication
                                           Waste treatment and
       17                    14                                            Mining and Waste             10
                                                 disposal




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                        Page 13

D’VINERIPE
R003370

Page 14

4.3.3.          Rainfall Runoff Parameters
The rainfall runoff export parameters have been adopted from Table 3.7 of the MUSIC Modelling Guidelines
Version 1.0, as summarised in Table 5.
Table 4 - Rainfall-runoff Parameters for MUSIC Source Nodes.

Parameter                              Forest            Urban             Transportation        Industrial         Agriculture

Rainfall threshold (mm)                   1                   1                  1                   1                  1

Soil storage capacity (mm)              120               500                   500                 18                  98

Initial storage (% capacity              10                10                   10                  10                  10

Field capacity (mm)                      80               200                   200                 80                  80

Infiltration          capacity          200               211                   211                 243                 84
coefficient a

Infiltration          capacity           1.0               5.0                  5.0                 0.6                3.3
exponent b

Initial depth (mm)                       50                50                   50                  50                  50

Daily recharge rate (%)                  25                28                   28                  0.0                100

Daily baseflow rate (%)                   3                27                   27                  31                  22

Daily deep seepage rate (%)              0.0               0.0                  0.0                 0.0                 0


4.3.4.          Pollutant Export Parameters
The pollutant export parameters have been adopted from Table 3.9 of the MUSIC Modelling Guidelines
Version 1.0, as summarised in Table 5.

Table 5 - Pollutant Export Parameters for Urban, Industrial, Mining and Waste, Forest and Agriculture Source Nodes (extracted
from Table 3.9, Water by Design, 2010).

                                                10                              10                             10
                                        TSS log values                     TP log values                  TN log values
 Land Use         Flow Type
                                     Mean            St. dev.          Mean           St. dev.       Mean             St. dev.
                   Baseflow           1.00             0.34            -0.97           0.31           0.20              0.20
   Urban
 residential
                  Stormflow           2.18             0.39            -0.47           0.32           0.26              0.23

                   Baseflow           0.78             0.45            -1.11           0.48           0.14              0.20
 Industrial
                  Stormflow           1.92             0.44            -0.59           0.36           0.25              0.32

                   Baseflow           1.03             0.55            -1.07           0.46           0.38              0.27
Mining and
  Waste
                  Stormflow           3.72             0.34            -0.03           0.27           0.73              0.22


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                                    Page 14

D’VINERIPE
R003370

Page 15

                                                10                              10                               10
                                        TSS log values                     TP log values                    TN log values
 Land Use        Flow Type
                                     Mean            St. dev.          Mean          St. dev.         Mean            St. dev.
                  Baseflow            0.51             0.28            -1.79          0.28             -0.59           0.22
   Forest
                 Stormflow            1.90             0.20            -1.10          0.22            -0.075           0.24

                  Baseflow            1.00             0.13           -1.155          0.13            -0.155           0.13
Agriculture
                 Stormflow           2.477             0.31           -0.495          0.30             0.29            0.26

                  Baseflow            1.00             0.34            -0.97          0.31             0.20            0.20
    Road
                 Stormflow            2.43             0.39            0.30           0.31             0.26            0.23



4.3.5.        Regional MUSIC Model Layout
The MUSIC model produced to analyse the proposed development is shown in Figure 7.




Figure 7 - MUSIC Model Layout.

4.3.6.        Modelling Results
The results of the MUSIC analysis for the total catchment are reported in Table 6.
Table 6 – Results from MUSIC Modelling.


Pollutant                                                                                    Pollutant Load

Flow (ML/yr)                                                                                     29,500

Total Suspended Solids (kg/yr)                                                                  8,420,000

Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                                 Page 15

D’VINERIPE
R003370

Page 16

Pollutant                                                                                    Pollutant Load

Total Phosphorus (kg/yr)                                                                        11,600

Total Nitrogen (kg/yr)                                                                          60,500

Gross Pollutants (kg/yr)                                                                        491,000
These results show the average annual flow rate and pollutant loads generated by the (approximately)
3600 ha catchment based on the QLUMP mapping and assumptions described in previous sections of the
report. As detailed in Section 3.2, the tomato farm utilises approximately 3,840 kg/yr of TN and 512 kg/yr of
TP. This represents only 6.3% and 4.4% of the total TN and TP loads respectively. It is important to note that
these values for the tomato farm represent the total nutrient load for the hydroponic operation in a year.
The actual load in the irrigation system at any one time is far less than this and these calculations do not
take into consideration the uptake of nutrients by the plants. Furthermore, as previously discussed, the
operators can flush the system and remove the irrigation water from the greenhouse in the event of a
major storm event. Therefore, the likelihood of any of this water entering the adjacent waterway is
extremely low.

4.4.         Site Specific MUSIC Model
4.4.1.       Model Objectives
The objective of the MUSIC model is to accurately represent the site and facilitate stormwater quality
management. Stormwater quality management aims to protect the quality of receiving waters by limiting
the quantity of stormwater pollutants discharged to the receiving environment as a result of urban
development.

4.4.2.       Pollutant Export Parameters
The pollutant export parameters have been adopted from Table 3.8 of the MUSIC Modelling Guidelines
Version 1.0, as summarised in Table 7.
Table 7 - Pollutant export parameters for Roof source nodes (extracted from Table 3.8, Water by Design, 2010).

                                                                10                         10                         10
             Flow Type         Pollutant Source         TSS log values              TP log values             TN log values

                                                        Mean           St. dev.     Mean        St. dev.      Mean         St. dev.

               Baseflow        Roof                        N/A             N/A       N/A           N/A         N/A           N/A

               Stormflow       Roof                        1.30            0.39      -0.89         0.31        0.26          0.23



The following water quality objectives have been adopted from the Queensland State Planning Policy’s
Water Quality Code.
Table 8 - Water Quality Objectives.


                         Minimum reductions in Mean Annual Loads from unmitigated catchment

   Total Suspended Solids                Total Phosphorus                   Total Nitrogen                 Gross Pollutants


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                                     Page 16

D’VINERIPE
R003370

Page 17

             (TSS)                              (TP)                       (TN)   > 5mm

              80%                               60%                        45%    90%




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                  Page 17

D’VINERIPE
R003370

Page 18

4.4.3.       Treatment Options
MUSIC modelling has been undertaken to assess the treatment system requirements to achieve the above
water quality objectives. Three treatment systems have been modelled:

    1. Bioretention system
    2. Media filtration system
    3. Infiltration system
4.4.3.1.     Bioretention System
The size of the bioretention system is to be reflective of the total catchment area anticipated for treatment.
Evaluation suggests each basin should be constructed at approximately 2% of the contributing area. It has
been determined a bioretention system will be capable of achieving the load based reduction targets
identified in Section 4.4.2. The parameters utilised to analyse the bioretention system are presented in
Table 9.
Table 9 – Bioretention System Input Parameters

Catchment ID                                                               Bioretention System Parameters
                   2
Surface Area (m )                                                                      454.8

Extended Detention Depth (m)                                                             0.3
               2
Filter Area (m )                                                                       396.8

Saturated Hydraulic Conductivity (mm/hr)                                                200

Filter Depth (m)                                                                         0.5



4.4.3.2.     Media Filtration System
An alternative to a bioretention system is the media filtration system. Runoff is directed to an underground
pit containing filtration media which removes suspended solids and nutrients from the water before
dispersing it into the soil. It has been determined a media filtration system will be capable of achieving a
comparable load based reduction to the same size bioretention system. The parameters utilised to analyse
the media filtration system are presented in Table 10
Table 10 – Media Filtration Input Parameters.

Catchment ID                                                                 Media Filtration Parameters

Extended Detention Depth (m)                                                             0.3
               2
Filter Area (m )                                                                        400

Saturated Hydraulic Conductivity (mm/hr)                                                200

Filter Depth (m)                                                                         0.5




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                    Page 18

D’VINERIPE
R003370

Page 19

4.4.3.3.     Infiltration System
A stormwater infiltration system holds runoff and allows it soak into the ground. The ponds are open
facilities with grass or sand bases. They can either drain rapidly or act as permanent ponds where water
levels rise and fall with stormwater flows. Generally, infiltration basins are managed like detention ponds
but with greater emphasis on maintaining the ability to infiltrate stormwater. The parameters utilised to
analyse the infiltration system are presented in Table 11.
Table 11 – Infiltration System Input Parameters.

Catchment ID                                                               Infiltration System Parameters
                        2
Pond Surface Area (m )                                                                  450

Extended Detention Depth (m)                                                            0.3
               2
Filter Area (m )                                                                        400

Saturated Hydraulic Conductivity (mm/hr)                                                200

Filter Depth (m)                                                                        0.5


4.4.4.       MUSIC Results
The results of the MUSIC modelling are presented in Table 12. The bioretention system was sized to
achieve the Best Practice water quality objectives for urban developments. The media filtration system and
infiltration system have been modelled as the same size.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                    Page 19

D’VINERIPE
R003370

Page 20

Table 12 - MUSIC Modelling Results – Receiving Node

Bioretention System                                                             Reduction (%)    Objective (%)

TSS                                                                                  80.3             80

TP                                                                                   75.9             60

TN                                                                                   60.3             45

Gross Pollutants                                                                     100              90

Media Filtration System                                                         Reduction (%)    Objective (%)

TSS                                                                                  79.3             80

TP                                                                                   59.9             60

TN                                                                                   36.1             45

Gross Pollutants                                                                     100              90

Infiltration System                                                             Reduction (%)    Objective (%)

TSS                                                                                  23.7             80

TP                                                                                   16.8             60

TN                                                                                   13.4             45

Gross Pollutants                                                                     100              90



The results of this assessment indicate the bioretention system is capable of achieving the water quality
objectives. The media filtration system achieves the load based reduction targets for TSS and TP (within +/-
1%). The TN reduction is slightly lower than the water quality objective, but the media filtration system still
removes a considerable quantity of TN from the roof runoff and could be constructed for considerably less
expense.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                Page 20

D’VINERIPE
R003370

Page 21

5.           Flooding and Water Quantity Management

5.1.         Introduction
Hydrologic and hydraulic modelling has been undertaken of the site to establish the flow regime and peak
discharges at the outlet of the site to the north. The modelling has been undertaken in XP-SWMM for both
the pre and post development scenarios. The modelling undertaken for this SMP represents the site
catchment only, and does not take into consideration the large catchment of which the site forms a part.

5.2.         Catchments
Due to the flat grades of the site and lack of defined flowpaths, the site has been considered as a single
33.2 ha catchment for the purposes of this modelling

5.3.         Rainfall Intensities
Intensity Frequency Duration (IFD) data for the site has been derived in accordance with Australian Rainfall
and Runoff (ARR) though the use of the AUS-IFD software. The rainfall intensities generated for the site are
shown below in Table 13.
Table 13- IFD Data Applied to Hydrologic Assessment

 Duration                 I1              I2              I5               I10      I20       I50       I100
 (mins)               (mm/hr)         (mm/hr)         (mm/hr)         (mm/hr)     (mm/hr)   (mm/hr)   (mm/hr)

 10                       95             121             151               168     192       223       247

 15                       80             102             127               142     162       188       208

 20                       70              89             111               124     142       165       183

 25                       62              80             100               111     127       148       164

 30                       57              73             91                101     116       135       150

 45                      45.7             58             73                82       94       110       122

 60                      38.9           49.8             63                70       80        94       104

 90                      30.2           38.8            49.4               56       64        75        84

 120                     25.1           32.4            41.6               47.2     55        65        72




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                       Page 21

D’VINERIPE
R003370

Page 22

5.4.         Hydrologic Modelling
The XP-SWMM runoff-routing model been has used to estimate design flood discharges within the site. The
catchment node is defined by its pervious (undeveloped) and impervious (developed) area, fraction
impervious and average catchment slope. A fraction impervious of 0% has been applied to the
undeveloped portion and 100% to the developed portion. The net rainfall is routed through the network
after appropriate losses (initial and continuing) and roughness factors are applied, resulting in a surface
runoff hydrograph for each sub-catchment. Hydrologic modelling has been undertaken using the
Laurenson Runoff Routing Method.

5.4.1.       Rainfall Losses
Initial Loss (IL) and Continuing Losses (CL) have been applied to the modelling, and again these values have
been varied for the developed (impervious) and developed (pervious) portions of the catchment. The
following loss rates have been applied:

        Developed catchment                     IL = 1mm            CL = 0mm/hr; and
        Undeveloped catchment                   IL = 12mm           CL = 2mm/hr

5.4.2.       Roughness Coefficients
Manning’s roughness coefficients (n values) have been applied to represent the undeveloped and
developed portions of the catchment. XP-SWMM allows a range to be applied to represent the varied
degree of roughness that could be expected within the catchment. The following values have been applied:

        Developed catchment                     n = 0.014 and
        Undeveloped catchment                   n = 0.04.

5.5.         Peak Flow Rate
The unsteady state, 1D hydrodynamic model XP-SWMM was used to analyse the peak flow rate of the site.
Flood levels, discharge and velocity can be extracted from the model as functions of time at required
locations.

The key objective of the hydraulic modelling was to demonstrate that the post development peak discharge
from the site for 63% AEP and 1% AEP storm event is less than or equal to the pre development peak
discharge.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                             Page 22

D’VINERIPE
R003370

Page 23

Figure 8 – Pre- vs Un-Mitigated Post-Development Hydrographs – 1% AEP Event.

The peak flow rate from the site for the pre-development case has been assessed and the design
hydrograph for the 1% AEP plotted as Figure 8. To assess the peak flow rate during the post-development,
unmitigated scenario, an additional 2.016 ha (i.e. 140 m x 144 m roof area) of the impervious area was
added to the model. A summary of the pre- and post-development peak discharge for the 1% and 63% AEP
events is included as Table 14.
Table 14 – Performance of Mitigation Measures – Peak Flow Rate at LPD

                                                                      3                                       3
                AEP                           Pre-Development (m /s)           Post-Development – mitigated (m /s)
                 1%                                       5.24                                5.24
                63%                                       1.09                                1.09


Results of this assessment demonstrate there is no increase in peak flow rate from the site due to the
construction of the greenhouse. We typically observe an increase in flow rate due to an increase in
impervious surfaces. However, due to the remainder of the site and the flat grades across the site, no
increase was observed in this scenario. It is noted from Figure 8 that the leading edge of the hydrograph
rises quicker in the post-development scenario. This can be attributed to the increase in impervious area.
Further assessment of the XP-SWMM modelling results reveals an increase in runoff volume does occur for
the post-development scenario, but does not translate to an increase in peak flow rate. A comparison of
the runoff volumes for the pre- and post-development scenarios is contained below in Figure 9, and
demonstrates an increase in runoff volume of approximately 540 m3 during the post development scenario.


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                      Page 23

D’VINERIPE
R003370

Page 24

Figure 9 – A Comparison of the Runoff Volumes for the Pre- (left) and Post-Development (right) Scenarios.


5.6.         Regional Flooding
A hydrological model was developed by Hydrology & Water Management Consulting for the 1% AEP
Duration Independent Storm (DIS) event. The hydrological model indicates a peak flow rate of
approximately 470 m3/s is the critical design flow rate for the catchment at the site boundary. The design
hydrograph was utilised by Water Technology in a flood model to determine the peak water levels and
inundation extent for the site. The hydrographs of the 1% AEP design event for both the site and the
catchment as a whole are shown in Figure 10. The peak flow rate from the farm site represents a little
more than 1% of the peak flow in the whole catchment and therefore does not make a significant
contribution.

The 1% AEP DIS event hydrograph rises for approximately 8 hours before reaching the peak flow rate (and
therefore peak water level at the site). Analysis of the site hydrology reveals the critical storm duration is
the 180 minute storm. As illustrated by Figure 10, the critical hydrograph for the site has entered the
receiving waters and left the site well before the peak flow rate associated with the larger catchment
reaches the site. As a consequence, the increase in runoff volume associated with the greenhouse roof has
no impact on the peak water level for flooding associated with the larger catchment. It is therefore
considered that no adverse impacts associated with flooding will occur for neighbouring properties due to
the construction of the greenhouse.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                    Page 24

D’VINERIPE
R003370

Page 25

Figure 10 - 1% AEP Hydrographs - Site vs Regional.




5.7.         Mitigation Measures
Based on the findings discussed in Section 5.5 and 5.6, it is considered that no stormwater quality
mitigation measures are required as the site demonstrates no increase in peak flow rate, and the
insignificant increase in runoff volume occurs much sooner than the critical storm associated with the
major flood event for the catchment.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                        Page 25

D’VINERIPE
R003370

Page 26

 6.            Erosion and Sediment Control (ESC)
6.1.         Erosion Risk Assessment
An erosion risk assessment has been conducted using the Revised Universal Soil Loss Equation (RUSLE). The
calculated soil loss is then used to determine the level of sediment control required, as well as stabilisation
and staging requirements. It must be noted that no soil sampling has been conducted on site, and as such,
a conservative erodibility (K) factor has been adopted based on soil mapping.

It has been assumed that no dispersive soils will be encountered on site. If at any time dispersive, or sodic
soils are encountered the client should contact the plan preparer for a review of the plans and procedures.

A = K x R x LS x P x C                                                                 Equation 1 (IECA 2008)

         Where:
                   A is the predicted soil loss per hectare per year
                   K is the soil erodibility factor
                   R is the rainfall erosivity factor
                   LS is the slope length/gradient factor
                   P is the erosion control practice factor
                   C is the ground cover and management factor

                K = 0.055
                R = 5923
                LS = varies
                C=1
                P = 1.3
As a conservative approach, a K factor of 0.055 has been applied, and represents silty loam soils.

Rainfall erosivity has been calculated using the following equation:

         R = 164.74 x 1.1177S x S0.6444

Where:

         S is the 39% AEP 6 hour rainfall event (mm) (IECA, 2008)

The erosion risk categories are summarised in Table 15.

Slope length/gradient has been varied to assess how the erosion risk varies as the slope of the site varies,
as summarised in Table 16.
Table 15 – Erosion Risk Categories

   Soil Loss (t/ha/yr)           Erosion Risk Category
         0 to 150                       Very Low
        150 to 225                          Low
        225 to 500                      Moderate
       500 to 1500                         High
          > 1500                         Extreme


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                Page 26

D’VINERIPE
R003370

Page 27

Table 16 – Estimated Soil Loss and Risk Categorisation for Varied Slope Lengths and Grades




Based in the Erosion Risk Assessment undertaken, it is concluded that the site presents only a Very Low or
Low erosion risk, as slopes are typically less than 0.5%, increasing to approximately 2% in some areas
adjacent to the creek.

Based on these factors, soil loss for disturbed areas is estimated as less than 150 t/ha/year.

6.2.          Erosion Control and Rehabilitation
Based on the erosion risk rating, the following best practice land clearing and rehabilitation controls should
be applied:
         Land clearing limited to a maximum 8 weeks of work.
         Disturbed soils surfaces stabilised with minimum 70% cover within 30 days of completion of works
          within any area of a work site.
         Unfinished earthworks are suitably stabilised if rainfall is reasonably possible, and disturbance is
          expected to be suspended for a period exceeding 30 days.

During the site inspection, a number of disturbed areas were observed. These should be stabilised as soon
as possible, using turf or topsoil and hydromulch, or other vegetative cover.

However, should stabilisation not be achievable using permanent specifications, any of the temporary
controls presented in Table 17 may be utilised.
Table 17- Stabilisation Materials

Flat Land (<1 in 10)                                                   Mild Slopes (1 in 10 – 1 in 4)

Erosion Control Blankets                                               Bonded Fibre matrix
Gravelling                                                             Compost Blankets
Mulching                                                               Erosion Control Blankets, Mats and Mesh
Revegetation                                                           Mulching well anchored
Rock Mulching                                                          Revegetation
Geofabric (temporary)                                                  Rock Mulching
Black plastic (temporary)

Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                         Page 27

D’VINERIPE
R003370

Page 28

6.3.         Drainage Control
6.3.1.       Design Standard
Based on the calculated soil loss, the following design standards apply to construction phase drainage and
erosion and sediment control:
         Temporary drainage structures                    39% AEP event (assuming design life < 12 months)

Roof runoff from the greenhouse is currently conveyed to a sediment basin via open drains. The operators
are in the process of installing a pipe drainage system to convey runoff to this location. However, no details
have been provided in relation to the design of these drains or the pipe drainage system.

6.4.         Sediment Control
6.4.1.       Design Standard
For any future construction activities, the following standards summarised in Table 18 apply to sediment
control.
Table 18 - Sediment Control Standard based on Soil Loss Rate

         Area Limit                                            Sediment Loss Rate Limit (t/ha/.yr)
            (m²)                             Type 1                         Type 2                    Type 3
            250                               n/a                             n/a                       n/a
           1,000                              n/a                             n/a                    All cases
           2,500                              n/a                            > 75                        75
          > 2,500                            > 150                            150                        75

Therefore, Type 2 and Type 3 controls are applicable for sediment control on the site. Examples of Type 2
and Type 3 controls that could be employed on site include:

         Type 3:
             o Sediment Fence,
         Type 2:
             o Filter Bag or Filter Tube,
             o Filter Pond, and
             o Filter Tube Dam.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                         Page 28

D’VINERIPE
R003370

Page 29

6.5.         Roles and Responsibilities
Table 19 outlines the responsibilities of parties with respect to ESC during construction.
Table 19 - Roles and Responsibilities

 Role                                         Responsibility

 Project Superintendent                           Overall responsibility of ESC implementation
                                                  Notify the Environmental Manager immediately of any non-compliance
                                                   with ESCP
                                                  Ensure the prompt implementation of measures to mitigate erosion and
                                                   sediment generation
 Project Engineer                                 Provide design information as required
                                                  Inspect ESC installation and maintenance
                                                  Inspect offsite impacts and management
 Site Supervisor/Foremen                          Monitor daily rainfall
                                                  Notify Environmental Advisor/Consultant when runoff generating rainfall
                                                   occurs in the previous 24 hours
                                                  Maintain current records of rainfall, storage volumes, water quality,
                                                   treatment practices, discharge volumes (as appropriate)
                                                  Installation and maintenance of ESC
 Environmental Advisor/Consultant                 Conduct in-situ monitoring (as required)
                                                  Collect and submit samples to laboratory (as required)
                                                  Collate results and prepare reports as required
                                                  Conduct site inspections and audits as required
                                                  Inspect ESC installation and maintenance
                                                  Inspect offsite impacts and management
 Erosion and Sediment Control Auditor /           Conduct site inspections and audits (as required)
 Advisor (CPESC)                                  Prepare audit reports (as required)
                                                  Provide advice regarding ESC site improvement (as required)
 All Personnel                                    Report any damage to ESC devices and any potential or actual
                                                   environmental harm in line with Duty to Notify under the requirements of
                                                   the Environmental Protection Act 1994



6.6.         Corrective and Preventative Action
An environmental incident with respect to the ESCP is defined as any occurrence where sediment is
released from the site, whether controlled or uncontrolled, or where stormwater is released (controlled)
from site which does not meet the water quality requirements.

All incidents and non-conformances are to be reported, investigated and corrected in accordance with the
ESCP to ensure effective soil and water quality management practices at all times.

Best practice site management requires all ESC measures to be inspected by the Contractors nominated
representative at least daily when rain is occurring, within 24 hours prior to expected rainfall, and within 18
hours of a rainfall event of sufficient intensity and duration to cause onsite runoff (IECA, 2008). Such
inspections must check:




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                                   Page 29

D’VINERIPE
R003370

Page 30

        Daily site inspections (during periods of runoff producing rainfall):
              Any sign of increased turbidity around the current work areas
              Evidence of litter or hydrocarbon sheens around the work area ; and
              Any potential sources of contamination on banks or pontoons.

        Weekly site inspections (even if work is not occurring on-site):
            Occurrences of excessive sediment deposition (whether on-site or off-site);
            Occurrences of construction materials, litter or sediment placed, deposited, washed or
                blown from the site, including deposition by vehicular movements;
            Litter and waste receptacles; and
            Oil, fuel and chemical storage facilities.
            Spillkits are well stocked and readily available



        Prior to anticipated runoff producing rainfall:
              All potential sources of contamination, including waste bins, skips and on platforms

        Following runoff producing rainfall:
              All potential discharge points from pontoons and banks.
              Occurrences of excessive sediment deposition;
              Occurrences of construction materials, litter or sediment placed, deposited, washed or
                blown from the site




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 30

D’VINERIPE
R003370

Page 31

 7.            Summary and Recommendations
This SMP has taken into consideration the historic and proposed land use of the site, and the hydrologic
and flooding behaviour. It also considers potential pollutant loads for the site and the catchment as a
whole. Based on these considerations, the following conclusions are made.

         The previously approved turf farm operated for 30 years and applied considerably higher
          quantities of nutrients (in the form of fertiliser) to the site. Based on the data available it is
          expected the sediment and nutrient loads exiting the site will reduce considerably as a result of
          the proposed change in land use due to decreased application of fertilisers.
         While the irrigation water is high in nutrients, the hydroponic setup is a closed system. Due to the
          lining of the trenches in which the plants and growbags are located, no irrigation water can enter
          the soil profile. Furthermore, as the system is located inside the greenhouse, rainfall and overland
          flows cannot convey nutrients associated with the hydroponics operations to the receiving
          watercourse under normal conditions.
         While the site is subject to inundation during major storm events, the likelihood of nutrient rich
          irrigation water being conveyed to the receiving water is minimal. As indicated by the regional
          hydrograph for the 1% AEP event, there is considerable time before the peak of the hydrographs
          reaches the site. Therefore, operators at the site will be aware of the risk of flooding well in
          advance of the site being inundated. A flood management plan has been developed to ensure the
          operators are able to extract the irrigation water from the system and flush the growbags with
          fresh water prior to inundation of the site. The irrigation is a closed loop system and the irrigation
          water can be extracted and stored in a tank located above the water levels associated with the
          major flood event.
         The pollutant loads generated within the entire catchment, including neighbouring properties far
          exceed those that would potentially leave the site during its operation as a tomato farm. The
          results of this assessment indicate that the annual nutrient loads applied to the tomato crop
          through the irrigation system represents only 6.3% and 4.4% of Total Nitrogen and Total
          Phosphorus loads generated within the entire catchment. Given that TN and TP levels mentioned
          are annual percentages, at any one time the nutrient loads in the irrigation system would be far
          less than these levels, and considering that the irrigation water can be extracted from the system
          in the event of a major flood event the potential for harm is minimal.
         Hydrologic and hydraulic modelling of the site for the pre- and post-development scenarios
          indicates the construction of the greenhouse results in no increase in peak flow rate from the site.
          Therefore, no mitigation measures (i.e. detention basins or tanks) are required to maintain pre-
          development peak flow rates from the site. The requirements of QUDM are therefore satisfied.
         Results of the modelling indicate in the post-development scenario an additional 540m³ will be
          generated during the critical duration (i.e. 180 minute) 1% AEP storm event.
         To satisfy the requirements of the Queensland State Planning Policy’s Water Quality Code, Water
          Sensitive Urban Design (WSUD) features would be required to capture and treat runoff from the
          roof area of the greenhouse. Any runoff for the roof will be low in TSS loads, and the nutrients
          contained will only be associated with atmospheric deposition.


Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                 Page 31

D’VINERIPE
R003370

Page 32

         To achieve the relevant load based reduction targets, a bioretention system of 400m² filter area
          would be required. Construction of this system would come at considerable cost to the client, and
          would not greatly reduce the pollutant loads entering the waterway due to the quality of runoff
          entering the bioretention system.

The following recommendations are made in relation to the site and operation of the tomato farm within
the proposed 140m x 144m greenhouse:

        A media filtration system, as detailed in Section 4.4.3.2, should be provided to treat runoff from the
         greenhouse roof area.
             o While the media filtration system does not achieve the load based reduction target of 45%
                 removal of TN, it meets the load based reduction targets for TSS and TP, and is able to
                 remove a considerable portion of TN from runoff. It is considered the additional cost
                 associated with constructing a bioretention system cannot be justified by the potential
                 increase in TN load removal.
             o The media filtration system will also facilitate infiltration of runoff into the soil profile. No
                 modelling has been undertaken to determine the volume of runoff that would be
                 infiltrated, and this would vary due to the groundwater levels at the site. However, it will
                 assist in returning the predevelopment hydrologic regime and reduce the volume of
                 additional runoff from the greenhouse roof that enters the creek system.
             o Any overflows from the media filtration system should be conveyed to the creek in an open
                 drain to further increase the infiltration potential. Detailed design of the media filtration
                 system should be undertaken as part of any future works, and the spillway designed to
                 convey the relevant design storm event.
        All exposed surfaces should be stabilised with either a vegetative cover (i.e. turf or topsoil and
         hydromulch), or mulching. Ideally, access tracks around the site will also be stabilised using gravel
         sheeting (refer Main Roads Specification Type 2.3).
        Any future works for the site will require an ESCP to be developed for the project.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                                 Page 32

D’VINERIPE
R003370

Page 33

 8.            Reference List
BOM. (2010). Rainfall IFD Data System. Retrieved 11 29, 2010, from Bureau of Meteorology:
      http://www.bom.gov.au/hydro/has/cdirswebx/cdirswebx.shtml

Department of Natural Resources and Water. (2008). Queensland Urban Drainage Manual Second Edition.
       Brisbane: Department of Natural Resources and Water.

Water by Design. (2010). MUSIC Modelling Guidelines Version 1.0. Brisbane, Queensland ISBN 978-0-
      9806278-4-8: Waterways Partnership.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                     Page 33

D’VINERIPE
R003370

Page 34

Appendix A                   Site Layout (Martoo Drawing Number)




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive   Page A

D’VINERIPE
R003370

Page 35

NOTE:
 Aerial Photograph sourced from Near Map
                                                                                                                Scale 1:4000 - Metres.

                                                                                   200                      0                             200                                 400



                                Sunshine Coast:        R.P.D                             DEVELOPMENT            PROJECT
                                13/6 Bottlebrush Ave                                     SUMMARY
                                NOOSA HEADS
                                P.O.Box 1684           Lot 1 & 2 on SP108094
                                Noosa Heads QLD 4567                                     Total Site Area:       SITE PLAN FOR STAGE 1           Scale:           Date:


martoo
consulting
                                Ph: 07 5447 2550
                                Fax: 07 5455 3322

                                Gympie:
                                                       305 Lake Macdonald Drive,
                                                       COOROY
                                                                                          33.4 ha approx.
                                                                                                                Applicant:
                                                                                                                                                1:4000 (A3)

                                                                                                                                                Drawn By:
                                                                                                                                                                 23/06/2015


                                38 Nash Street
                                                                                                                Como Glasshouse Pty Ltd         LMc - MARTOO CONSULTING
               pty ltd          P.O. Box 391           Local Authority:
town planners +                 Gympie QLD 4570        NOOSA COUNCIL                                            Detail:                         Reference No.:
                                Ph: 07 5482 7440
urban designers                 Fax: 07 5482 4952
                                                                                                                Proposal Plan (Aerial)          D-01569-06-A
+ surveyors

Page 36

Appendix B                   Assessment of Historic Nutrient Loads




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive   Page B

D’VINERIPE
R003370

Page 37

Turf Farm
Fertilizers
D.A.P.
Chemical Formula      Molecular Weight (g/mol)    kg/yr                 mol/yr   mol N     mol P                        Atomic Weight N (g/mol)   kg/yr N   Atomic Weight P (g/mol)   kg/yr P
(NH4)2HPO4                                131.985                  12000 90919.42 181838.8                90919.42266                      14.0067 2546.962                     30.974 2816.138

Crop King
kg/yr                 Percentage N                  Percentage P           kg/yr N    kg/yr P
              12000                            15                    4.3         1800        516

Urea
Chemical Formula      Molecular Weight (g/mol)    kg/yr                 mol/yr   mol N     Atomic Weight N (g/mol)    kg/yr N
CO(NH2)2                                  60.0128                  12000 199957.3 399914.7                    14.0067                5601.485017

Chemicals
Lorsban
Chemical Formula      Molecular Weight (g/mol)   kg/yr                  mol/yr   mol N     mol P                        Atomic Weight N (g/mol)   kg/yr N   Atomic Weight P (g/mol)   kg/yr P
C9H11Cl3NO3PS                              350.3                      20 57.09392 57.09392                 57.0939195                      14.0067 0.799697                     30.974 1.768427

Roundup (Glyphosate)
Chemical Formula Molecular Weight (g/mol)    kg/yr                      mol/yr   mol N     mol P                        Atomic Weight N (g/mol)   kg/yr N   Atomic Weight P (g/mol)   kg/yr P
C3H8NO5P                                 169                         7.2 42.60355 42.60355                 42.6035503                      14.0067 0.596735                     30.974 1.319602

                          Total N (kg/yr)            Total P (kg/yr)
                               9950                      3335

Page 38

Tomato Farm
Calcium nitrate
Chemical Formula                  Molecular Weight (g/mol)    kg/yr           mol/yr   mol N     Atomic Weight N (g/mol)    kg/yr N
Ca(NO3)2                                               164.09            15969 97318.54 194637.1                    14.0067             2726.22332

Potassium nitrate
Chemical Formula                  Molecular Weight (g/mol)    kg/yr           mol/yr   mol N     Atomic Weight N (g/mol)    kg/yr N
KNO3                                                  101.105             7939 78522.33 78522.33                    14.0067            1099.838695

Iron Chelate
Chemical Formula                  Molecular Weight (g/mol)    kg/yr            mol/yr   mol N     Atomic Weight N (g/mol)    kg/yr N
C10H12N2O8FeNa.3H2O                                  420.8484             182.5 433.6478 867.2957                    14.0067           12.14795043

Potassium di hydrogen phosphate
Chemical Formula                  Molecular Weight (g/mol)    kg/yr            mol/yr   mol P     Atomic Weight P (g/mol)    kg/yr P
KH2PO4                                                 136.07           2281.25 16765.27 16765.27                     30.974           519.2874072



                                       Total N (kg/yr)         Total P (kg/yr)
                                            3838                    519

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.